The PFS Koryx published on 17 November 2026 for the Haib Copper Project rests on a specific set of price, cost and technical assumptions. Key ones:
Price deck (base case)
Post-tax NPV at 8% of US$2.5bn (pre-tax US$4.2bn) and post-tax IRR of 25% (pre-tax 31%), at base-case price of US$5.00/lb Cu, US$3,500/oz Au, and US$22/lb Mo. In the detailed table, the copper price is stated as Copper Price (base case) US$/t 11,023 — i.e. US$5.00/lb, the same deck figure. A sensitivity case is also run at US$13,000/t copper (~US$5.90/lb), lifting post-tax NPV to US$3,875m and IRR to 32.2%.
Costs and royalties
- Government Royalty (tax-deductible) 3.0%, Export Levy 1.0%
- C1 cash cost of US$1.72/lb (net of byproducts, first 10 years) and US$2.19/lb (LOM); All-in sustaining cost (AISC) of US$2.07/lb (first 10 years) and US$2.52/lb (LOM)
- US$2.06bn upfront capital cost, incl. US$133m of project contingency and US$152m of capitalised pre-strip, with sustaining capital of US$639m over the LOM
Mining and processing design
- LOM production schedule of 48Mtpa crushing throughput for approximately 1.1bn tonnes over 24 years, prioritising higher-grade feed (approximately 0.32% Cu) in the early years
- Conventional open pit with staged pushbacks and trolley-assisted haulage, mined by contractor, with a life-of-mine strip ratio of 0.98:1
- LOM copper recovery of 87.3% (89.5% 1st 10 years) to a bulk concentrate grading 21.8% Cu, with molybdenum and gold recovered as by-products
- Power: 220kV overhead powerline connection to NamPower's Harib substation combined with approximately 417MWp of on-site solar PV and 361MWh of battery storage, supplying approximately 45% of life-of-mine energy
- Water: 20Mm3 per annum from the Orange River incl. off-channel storage dam to manage seasonality, with permitting underway.
Reserve base: Probable reserves of 3 million mt of contained Cu, built from M&I&I resources of 4.35 million mt contained Cu. Management notes the study marks a major step up from the PEA completed in September 2025, including abandoning heap leaching and adding coarse-particle/Jameson flotation.