Latest: YAR-45 at Yarumalito, Colombia (reported Oct 6, 2026)
Hole YAR-45 returned 399.9 m at 0.45 g/t AuEq (0.34 g/t Au, 0.09% Cu, 1.21 g/t Ag) from surface to the end of hole — essentially mineralized top to bottom. Within that, three higher-grade intervals stood out:
- 33.2 m at 0.81 g/t AuEq from 10.3 m
- 74.7 m at 0.61 g/t AuEq from 136.5 m
- 36.0 m at 0.65 g/t AuEq from 330.0 m
Four holes totaling 1,218 m were completed in this program (begun May 26, 2026); assays for YAR-46 through YAR-48 are still pending.
Versus earlier Yarumalito results:
- Historical hole YAR-06 (cited in the May 26, 2026 program announcement) returned 257 m at 0.50 g/t Au and 0.1% Cu from surface.
- YAR-45's 399.9 m length is considerably longer than YAR-06's 257 m, though the average grade (0.45 g/t AuEq) is slightly lower than YAR-06's 0.50 g/t Au — the new hole trades a touch of grade for more continuous width, including the fact that it didn't reach a true bottom, so the mineralized zone may extend further at depth.
For scale, the current inferred resource at Yarumalito stands at 66.3 million tonnes at 0.58 g/t Au and 0.09% Cu; GoldMining says YAR-45 to YAR-48 results will be folded into an updated geological and resource model once the remaining assays are in.
Checked the news archive.
Cross-examine that.
What the evidence does not settle:
- True width is roughly half the reported length. GoldMining's own note states true width is estimated at ~50% of downhole interval, based on current geological interpretation of a sub-vertical contact — so the "399.9 m" headline number is a core length, not a thickness measurement of the mineralized zone (release, Oct 6, 2026).
- AuEq uses high, forward-looking metal prices and assumes 100% recovery. The gold-equivalent grade is calculated at US$3,550/oz Au, US$5.00/lb Cu and US$50/oz Ag with metallurgical recovery assumed at 100% "pending definitive metallurgical test work" — actual recoveries, and therefore realizable AuEq, could be materially lower.
- The headline interval is a low-grade cut-off composite. The 399.9 m/0.45 g/t AuEq figure is reported at a 0.10 g/t AuEq cut-off with up to 5 m of internal dilution allowed — a very permissive threshold that inflates apparent continuity; the higher-grade sub-intervals (0.81, 0.61, 0.65 g/t AuEq) use a tighter 0.30 g/t cut-off, meaning most of the "400 m" is low-grade material bracketing a few better zones.
- Hole did not reach a true bottom. YAR-45 ended in "weak alteration and mineralization" at 399.9 m rather than clearly exiting the system — depth extent and ultimate grade distribution below that point remain unknown.
- Three of four holes in this program are still unassayed (YAR-46, -47, -48), so the comparison to the historical YAR-06 intercept rests on one new data point; the system's lateral/vertical continuity claim is not yet corroborated by the full program.
- No independent verification disclosed in this release beyond standard ALS lab certification — no mention of QA/QC blanks, duplicates or standards results, which NI 43-101 would normally require detail on.
- Resource model is not yet updated. The company states results will be "integrated into an updated geological model and mineral resource model" — the current 66.3 Mt inferred resource at 0.58 g/t Au does not yet reflect this hole, so it's not possible to say how YAR-45 changes the economics or ounce count.
- Comparison to YAR-06 is apples-to-oranges on cut-off and reporting basis — the historical hole's 257 m at 0.50 g/t Au figure's cut-off/dilution parameters were not restated in this release, making a precise like-for-like grade comparison uncertain.
Checked the news archive and the company directory.
can we discuss the last financials from 55 North
Latest filed financials for 55 North Mining Inc. (CSE: FFF) are its Q1 2026 interim statements, period ended March 31, 2026 (unaudited, no auditor review per NI 51-102).
Position at a glance:
| Metric | Mar 31, 2026 | Dec 31, 2025 | Mar 31, 2025 |
|---|---|---|---|
| Cash | $1,440,378 | $2,524,511 | $53,162 |
| Working capital | $692,784 (surplus) | $584,947 (surplus) | $(1,308,101) deficit |
| Net loss (quarter) | $618,060 | $4,162,863 (Q4) | $225,169 |
| Loss per share | $0.02 | $0.21 | $0.01 |
| Shares outstanding | 35,314,797 | 33,251,997 | — |
What drove the quarter: the company actually put cash to work this time — $627,617 in project expenditures at the Last Hope Project (Q1 2025 was essentially nil), plus higher promotion, management and consulting costs tied to a capital raise and retail-investor outreach. That's why the loss nearly tripled year-over-year even though it's a sign of activity, not distress.
Balance sheet context: cash fell from $2.52M to $1.44M over the quarter — a roughly $1.08M burn against the $618K reported loss, consistent with the step-up in exploration spending. Working capital flipped from a deficit a year ago to a surplus now, a material improvement in solvency.
Dilution overhang: 13,026,051 warrants outstanding (weighted-average strike $0.37) and 2,790,000 options (weighted-average strike $0.57), against 35.3M shares out — warrants alone represent potential ~37% further dilution if all exercised. Share count rose from 33.25M to 35.31M in the quarter (warrant exercises).
Checked the company directory, the financial statements and technical reports.