JUNIOR MININGINTELLIGENCE
CompaniesNewsProspectors EXLive NowMedia
JUNIOR MININGINTELLIGENCE
CompaniesNewsProspectors EXLive NowMedia
  1. Home
  2. /
  3. Companies
  4. /
  5. First Mining Gold Corp.
  6. /
  7. Duparquet Gold Project

Duparquet Gold Project

Gold · Canada

Duparquet Gold Project is a gold project in Canada, at the early exploration stage, held by First Mining Gold Corp. (TSX: FF).

21 news releases are filed under it here.

← First Mining Gold Corp. profileCompany website ↗

Key facts

CompanyFirst Mining Gold Corp. (TSX: FF)
CommodityGold
LocationCanada
StageEarly exploration

About Duparquet Gold Project

The Duparquet Gold Project, located on the Destor-Porcupine Fault Zone in the Abitibi region of Quebec, Canada, is one of the largest undeveloped gold projects in North America.

News releases21 on file

  1. Sep 10, 2026

    First Mining Reports 5.26 g/t Au over 19.55 m as Drilling Expands Miroir Discovery at the Duparquet Project

    Initial results from the 2026 drilling program at the Duparquet Gold Project in Quebec's Abitibi region include DUP26-093 with 5.26 g/t Au over 19.55 m, including 7.58 g/t over 12.95 m and 21.80 g/t over 1.0 m, and DUP26-096 with 3.43 g/t Au over 28.0 m, including 10.36 g/t over 7.2 m. Drilling extended the Miroir target's strike length to approximately 220 m. The 15,000 m program, begun in May 20

    Drill results
  2. May 21, 2026

    First Mining Commences 2026 Drilling Campaign and Signs Milestone Drilling Partnership with Forage Anicinape at the Duparquet Gold Project

    A roughly 12,000 metre drill campaign has begun in Q2 2026 at the Duparquet Gold Project in Quebec's Abitibi region, using two diamond drill rigs through the year to increase resource confidence, test resource growth and support geotechnical, metallurgical and hydrogeological work, including follow-up drilling at the Miroir target. First Mining Gold also signed a drilling partnership with Forage A

    Drill results
  3. Dec 16, 2025

    First Mining Announces Receipt of $6 Million in Proceeds from Warrants Exercise

    Total proceeds of C$6,410,045 were received from First Majestic Silver Corp.'s exercise of 32,050,228 common share purchase warrants at $0.20 per warrant, warrants originally issued in connection with amending a silver purchase agreement among First Majestic, First Mining and subsidiary Gold Canyon Resources Inc. Proceeds will go toward the Springpole and Duparquet gold projects and general workin

    Financing
  4. Nov 10, 2025

    First Mining Reports Continued Drilling Success at its Miroir Discovery with 2.01 g/t Au over 29.8 m

    Drilling at the Miroir target on the Duparquet Gold Project in Quebec's Abitibi region returned 3.20 g/t Au over 15.75 m in DUP25-077, including 5.21 g/t Au over 8.65 m and 22.50 g/t Au over 0.7 m; DUP25-078 returned 2.01 g/t Au over 29.8 m, including 15.70 g/t Au over 0.75 m and 18.20 g/t Au over 1.0 m; and DUP25-079 returned 1.76 g/t Au over 16.25 m. The 2025 program, totalling 16,577 m, conclud

    Drill results
  5. Sep 24, 2025

    First Mining Expands Newly Discovered Miroir Target with Drill Hole DUP25-064 Returning 3.23 g/t Au over 25.9 m

    Drilling at the Miroir target on the Duparquet Gold Project in Quebec's Abitibi region returned 3.23 g/t Au over 25.9 m in hole DUP25-064, including 11.20 g/t Au over 2.0 m and 10.16 g/t Au over 1.4 m, with the same hole also returning 4.64 g/t Au over 4.6 m and 4.15 g/t Au over 7.4 m. Step-out hole DUP25-066, 45 m east, returned 1.37 g/t Au over 30.6 m, and DUP25-067 returned 2.58 g/t Au over 4.0

    Drill results
  6. Sep 18, 2025

    The City of Duparquet and First Mining Gold Sign Historic Memorandum of Understanding for Community Development and Collaboration on the Duparquet Gold Project

    A memorandum of understanding with the City of Duparquet, Quebec, ratified by the municipal council on September 15, 2025, formalizes collaboration on the Duparquet Gold Project. Terms include a co-habitation plan and update of the City's urban development plan, a mechanism for relocating certain residential properties, a design plan to reconfigure the Duparquet golf course, transfer of over 100 a

    Corporate
  7. Sep 8, 2025

    First Mining Further Expands Aiguille Zone at the Duparquet Gold Project as Exploration Drilling Advances

    Drilling at the Aiguille Zone of the Duparquet Gold Project in Quebec's Abitibi region returned 1.43 g/t Au over 24.1 m, including 4.56 g/t Au over 4.0 m, in hole DUP25-058, extending the zone eastward to an approximate 100 m strike length. Hole DUP25-057 at the Valentre target returned 2.80 g/t Au over 3.25 m, including 4.93 g/t Au over 1.75 m. About 16,000 m has been drilled in 2025 to date, wit

    Drill results
  8. Jul 22, 2025

    First Mining Announces Closing of $12 Million Public Offering

    First Mining Gold closed an over-subscribed public offering of 66,670,000 units at $0.18 per unit for gross proceeds of $12,000,600. Each unit includes one common share and one-half warrant, with each whole warrant exercisable at $0.27 for 36 months from closing. Net proceeds will fund the Springpole and Duparquet gold projects and general working capital and corporate purposes. Haywood Securities

    Financing
  9. Jul 15, 2025

    First Mining Announces Upsized $12 Million Public Offering for a Total Offering of up to $27 Million

    The previously announced public offering has been upsized to up to 66,670,000 units at $0.18 per unit for gross proceeds of up to $12,000,060, with each unit comprising one common share and one-half warrant exercisable at $0.27 for 36 months. A concurrent non-brokered private placement of up to 55,600,000 units at $0.18 and up to 22,730,000 flow-through units at $0.22 could raise up to $15,008,600

    Financing
  10. Jul 14, 2025

    First Mining Discovers Significant New Gold Zone for Immediate Expansion at the Duparquet Gold Project

    Drilling at the Duparquet Gold Project in Quebec's Abitibi region identified a new gold zone, Minuit, located 75 m north of the historical Donchester Mine, with hole DUP25-059 returning 2.25 g/t Au over 12.8 m, including 4.08 g/t Au over 4.0 m. The same hole cut 1.21 g/t Au over 60.2 m, including 4.1 g/t Au over 4.3 m, in Zone 3 of the current resource. About 9,300 m of a planned 18,000 m two-rig

    Drill results
  11. Jul 14, 2025

    First Mining Announces Public Offering and Non-Brokered Private Placement for up to $20 Million

    A public offering of up to 27,800,000 units at $0.18 per unit for gross proceeds of up to $5,004,000 has been agreed with Haywood Securities Inc. and a syndicate of agents, alongside a non-brokered private placement of up to 55,600,000 units at $0.18 and up to 22,730,000 flow-through units at $0.22 for up to $15,008,600, totalling up to $20,012,600. Each unit includes a half warrant exercisable at

    Financing
  12. May 28, 2025

    First Mining Strengthens Miroir Discovery at Duparquet Gold Project with New Near-Surface Drilling Results and Expands Valentre Target Zone at Depth

    Initial 2025 drill results from the Duparquet Gold Project in Quebec's Abitibi region include, at the Miroir target, 2.77 g/t Au over 11.1 m (including 4.36 g/t Au over 6.5 m) from 12.9 m in DUP25-052 and 1.41 g/t Au over 11.9 m from 26.7 m in DUP25-054. The same hole cut 3.96 g/t Au over 9.3 m, including 5.71 g/t Au over 5.8 m, at the Valentre target about 330 m below surface. Results cover six h

    Drill results
  13. Apr 28, 2025

    First Mining Adds Second Drill Rig at the Duparquet Gold Project and Provides Corporate Update

    A second drill rig was added in April 2025 at the Duparquet Gold Project in Quebec's Abitibi region, advancing a previously announced ~18,000-metre exploration drilling program. Ten holes totalling 3,100 metres have been completed to date; assay results are not yet available and will be disclosed as received. The Company also engaged GRA Enterprises LLC for investor relations and marketing service

    Drill results
  14. Mar 5, 2025

    First Mining Provides Update on 2025 Exploration Program at the Duparquet Gold Project and Mobilizes First Drilling Rig

    A roughly 18,000 m exploration drill program is planned for 2025 at the Duparquet Gold Project in Quebec's Abitibi region, with the first rig mobilizing in the first week of March 2025 for a Phase 3B winter program of about 3,000 m targeting Miroir, CVD, East Extension and a regional target; a second rig is planned for Q2 2025 for a further 15,000 m. Final 2024 assays from three holes included 5.2

    Drill results
  15. Jan 20, 2025

    First Mining Expansion Target Drilling Identifies Two New Gold Discoveries at the Duparquet Gold Project

    Phase 3 diamond drilling at the Duparquet Gold Project in Quebec identified two new gold zones near the Valentre target: the Miroir Zone, 225 m north, returning 3.12 g/t Au over 19.35 m including 5.47 g/t Au over 9.6 m in hole DUP24-048, and the Aiguille Zone, 150 m south, returning 8.99 g/t Au over 3.1 m in DUP24-044. The 2024 CVD program totalled 16 holes and 4,644 m, with 142 mineralized interc

    Drill results
  16. Nov 21, 2024

    First Mining Further Defines Buzz Zone and North Zone Expansion Targets at the Duparquet Gold Project

    Drilling from the 2024 Phase 3 program at the Duparquet Gold Project in Quebec returned 1.55 g/t Au over 15.4 m, including 3.08 g/t Au over 5.3 m, in hole DUP24-028 at the Buzz Zone, and 1.19 g/t Au over 35.3 m plus 2.63 g/t Au over 14.0 m in DUP24-029. At the North Zone, DUP24-032 returned 4.00 g/t Au over 5.70 m, including 6.65 g/t Au over 2.0 m, supporting a 130 m eastward strike extension. Six

    Drill results
  17. Sep 26, 2024

    First Mining Announces Closing of C$8 Million Bought Deal Financing Including the Full Exercise of Over-Allotment Option

    A bought deal public offering of 59,629,800 units at $0.135 per unit closed for gross proceeds of $8,050,023, including full exercise of the underwriters' over-allotment option of 7,777,800 units. Each unit comprises one common share and one-half warrant exercisable at $0.20 per share for 36 months from closing. Net proceeds will advance the Springpole and Duparquet gold projects and fund general

    Financing
  18. Sep 19, 2024

    First Mining Announces $7 Million Bought Deal Public Offering and Non-Brokered Private Placement

    A bought deal public offering of 51,852,000 units at $0.135 per unit for gross proceeds of approximately $7 million has been agreed with underwriters co-led by Cormark Securities and Haywood Securities, with a 15% over-allotment option exercisable for 30 days after closing. First Mining also intends a non-brokered private placement of units for up to $5 million. Each unit includes one common share

    Financing
  19. Aug 28, 2024

    First Mining Further Defines Expansion Opportunity and Adds Second Drill Rig at the Duparquet Gold Project

    Phase 3 diamond drilling at the Valentre target on the Duparquet Gold Project in Quebec returned 3.98 g/t Au over 8.70 m in hole DUP24-026 and 1.82 g/t Au over 14.35 m in DUP24-027, confirming mineralization continuity across the 175 m untested strike between the Central Duparquet and Dumico resource pit shells. About 5,700 m has been drilled since April, with 12 further Valentre holes planned and

    Drill results
  20. Jun 18, 2024

    First Mining Identifies Multiple High-Grade Gold Zones in Duparquet Exploration Drilling

    Drilling at the Duparquet Gold Project in Quebec returned multiple gold intervals in hole DUP24-024, including 10.67 g/t Au over 5.3 m, 6.63 g/t Au over 9.0 m, 3.04 g/t Au over 33.5 m and 5.97 g/t Au over 33.0 m (including 9.63 g/t Au over 4.2 m and 14.43 g/t Au over 6.0 m). The Phase 2B winter program, concluded in April 2024, comprised seven holes totalling 2,856 m; mineralization occurs in newl

    Drill results
  21. May 21, 2024

    First Mining Announces Initial 2024 Duparquet Exploration Drilling Results

    Initial results from the seven-hole, 2,856 m Phase 2B winter diamond drilling program at the Duparquet Gold Project in Quebec include DUP24-018 returning 3.11 g/t Au over 13.16 m, 20.00 g/t Au over 0.69 m and 1.53 g/t Au over 14.15 m, and DUP24-019 returning 3.07 g/t Au over 10.32 m and 3.19 g/t Au over 4.53 m at the North Zone. At the Rex Target, DUP24-021 returned 0.73 g/t Au over 3.85 m; DUP24-

    Drill results

Related

Other First Mining Gold Corp. projects

  • Cameron Gold Project · Gold · Canada
  • Pickle Crow Gold Project (30% interest) · Gold · Canada
  • Springpole Gold Project · Gold · Canada
First Mining Gold Corp. profile →First Mining Gold Corp. news →Reading an NI 43-101 →