Key facts
| Company | Fury Gold Mines Limited (TSX: FURY) |
|---|---|
| Commodity | Gold |
| Location | Canada |
| Stage | PEA |
Mineral resource estimates
8 reported estimates, newest first. Categories are as disclosed by Fury Gold Mines Limited; inferred material carries the lowest confidence and cannot support a reserve.
| Category | Tonnes | Au g/t | Au oz | Effective |
|---|---|---|---|---|
| MeasuredNI 43-101 | 1.2 Mt | 5.19 g/t | 193 koz | Sep 1, 2025 |
| MeasuredNI 43-101 | 455 kt | 6.90 g/t | 101 koz | Sep 1, 2025 |
| Measured & indicatedNI 43-101 | 6.4 Mt | 5.65 g/t | 1.16 Moz | Sep 1, 2025 |
| IndicatedNI 43-101 | 1.3 Mt | 4.19 g/t | 174 koz | Sep 1, 2025 |
| IndicatedNI 43-101 | 3.5 Mt | 6.17 g/t | 692 koz | Sep 1, 2025 |
| InferredNI 43-101 | 69 kt | 4.39 g/t | 10 koz | Sep 1, 2025 |
| InferredNI 43-101 | 2.6 Mt | 6.08 g/t | 502 koz | Sep 1, 2025 |
| InferredNI 43-101 | 2.6 Mt | 6.04 g/t | 512 koz | Sep 1, 2025 |
How the categories differ: Inferred vs Indicated vs Measured. Compare reports over time with the Resource Growth Tracker.
Economic studies
Preliminary economic assessment
Sep 1, 2025- NPV (5%)
- US$554M
- IRR
- 41%
- Payback
- 2.5 years
- Initial capex
- US$217M
- AISC
- US$1,140/oz
- Mine life
- 11 years
- Annual production
- 75,852 oz
- Gold price assumed
- US$2,400/oz
Figures as extracted from each study, in US dollars as the studies report them. Open the report before relying on one.
News releases5 on file
Fury Reports 7.86 g/t Gold Over 9.43 Metres in Infill Drilling at the Eau Claire Gold Project, Quebec
Infill and expansion drilling at the Eau Claire gold project in the Eeyou Istchee Territory, James Bay region of Quebec returned 7.86 g/t gold over 9.43 m in expansion hole 26EC-103, 13.83 g/t over 1.97 m in hole 26EC-102, and 3.79 g/t over 7.25 m plus 34.20 g/t over 0.96 m in conversion hole 26EC-107. Phase 1 totalled 21 holes over 12,700 m; the Phase 2 program of 15,000–25,000 m has completed 14
Drill resultsFury Files Technical Report for the Eau Claire Gold Project in Quebec
A NI 43-101 technical report titled Technical Report – Preliminary Economic Assessment of the Eau Claire Project, Eeyou Istchee James Bay Region of Quebec, Canada, with an effective date of August 25, 2025, has been filed for the Eau Claire Gold Project. The report supports disclosure in Fury Gold Mines' September 2, 2025 news release on the PEA results. Maxime Dupéré, P. Geo. and Sarah Dean, P. G
Study resultsFury Announces Results of Preliminary Economic Assessment for the Eau Claire Gold Deposit with a Base Case After-Tax NPV(5%) of $554M and After-Tax IRR of 41%
A preliminary economic assessment for the Eau Claire gold deposit in the Eeyou Istchee James Bay region of Quebec returned, at US$2,400/oz gold, an after-tax NPV(5%) of $554M and 41% IRR for the Base Case standalone scenario, $610M and 53% for the Hybrid Case, and $639M and 84% for the Toll Milling Case, with paybacks of 2.5, 1.5 and 1.1 years. The plan contemplates underground mining plus two sma
Study results