202620 releases
Headwater Gold Signs New Earn-In Agreement with Newmont on the Jupiter Project, Nevada
An earn-in agreement with Newmont has been signed covering the Jupiter Project in Nevada, dated 13 August 2026. No terms of the agreement are disclosed in the text provided.
AcquisitionHeadwater Gold Signs Spring Peak Joint Venture Agreement with Newmont
A joint venture agreement for the Spring Peak project has been signed with Newmont. No further details of the agreement terms were included in the text provided, which links to a PDF for the full announcement.
AcquisitionHeadwater Gold Announces Commencement of Centerra-Funded Drilling at Crane Creek Project, Idaho
Drilling has begun at the Crane Creek project in Idaho, funded by Centerra. The release links to a PDF for further details.
Drill resultsHeadwater Gold Plans Drill Program with OceanaGold at Jake Creek Project, Nevada
A drill program is planned with OceanaGold at the Jake Creek project in Nevada, with drill permits received for the program.
Drill resultsHeadwater Gold Hits Highest Gold Grades to Date at TJ Project, Nevada and Expands Land Position 88%
Drilling at the TJ project in Nevada returned the highest gold grades reported to date by the company, according to the announcement. The land position at TJ was expanded by 88%. No assay details were included in the available text.
Drill resultsHeadwater Gold Completes Oversubscribed Private Placement for Gross Proceeds of $5.75 Million
An oversubscribed private placement has closed for gross proceeds of $5.75 million, above the up to $5 million originally announced. No further details of the financing terms are provided in the available text.
Financing
202521 releases
Headwater Gold Grants Stock Options
Stock options have been granted, per a December 31, 2025 announcement from Headwater Gold Inc.; the release text available consists only of the title and a link to the PDF, with no details on the number of options, exercise price, recipients or terms disclosed.
CorporateHeadwater Gold and Centerra Gold Sign US $25 Million Earn-In Agreement to Explore the Crane Creek Gold Project in Idaho
An earn-in agreement worth up to US $25 million has been signed with Centerra Gold to explore the Crane Creek gold project in Idaho. Further terms are contained in a downloadable PDF not included in the text.
AcquisitionHeadwater Gold Geophysical Survey Delineates Prospective Fault Corridor on the Spring Peak and Lodestar Projects, Nevada
A gravity geophysical survey has delineated a prospective fault corridor across the Spring Peak and Lodestar projects in Nevada, described in the release as an expanded Bear Fault corridor. Full survey details are provided in an accompanying PDF; no additional results are included in the release text.
Drill resultsUS Federal Government Selects Headwater Gold’s Spring Peak Project for FAST-41 Permitting Track
The Spring Peak project has been selected by the US federal government for the FAST-41 permitting track. No further details on the project or permitting timeline were provided in the release text.
CorporateHeadwater Gold Commences Drilling at Lodestar Project, Nevada
Drilling has commenced at the Lodestar project in Nevada. No further details were included in the release text, which links to a PDF dated October 14, 2025.
Drill resultsHeadwater Gold Receives Drill Permit for Lodestar Project, Nevada
A drill permit has been received for the Lodestar project in Nevada. No further details were included in the release text.
CorporateNewmont Elects to Advance to Stage 2 of the Spring Peak Earn-In Agreement
Newmont has elected to advance to Stage 2 of the earn-in agreement covering the Spring Peak project. Details are contained in the accompanying PDF release dated September 26, 2025.
AcquisitionHeadwater Gold Announces CFO Update
ManagementHeadwater Gold Completes Strategic Private Placement Led by Rick Rule, Jeff Phillips, and Centerra Gold
A strategic private placement has closed, led by Rick Rule, Jeff Phillips and Centerra Gold. No placement size, pricing or other terms are provided in the text, which links to a PDF dated 29 August 2025.
FinancingHeadwater Gold Advances Drill Permitting at Lodestar Project, Nevada
Drill permitting is advancing at the Lodestar project in Nevada, with the full release available only as a downloadable PDF.
CorporateHeadwater Gold and OceanaGold Sign Letter of Intent to Explore Three Projects in Nevada
A letter of intent has been signed with OceanaGold to explore three projects in Nevada. The release itself is provided only as a downloadable PDF, with no further terms or details in the posted text.
AcquisitionHeadwater Gold Grants Stock Options
CorporateHeadwater Gold Acquires the Whiskey Project in Nevada and Reports 19.2 g/t Au in Rock Samples at Surface
Acquisition of the Whiskey Project in Nevada, with rock samples at surface returning up to 19.2 g/t Au. The release is provided as a downloadable PDF, with no further details in the posted text.
Acquisition
202414 releases
Headwater Gold Announces Completion of First Pass Drilling at the TJ Project, Nevada
First pass drilling has been completed at the TJ Project in Nevada.
Drill resultsHeadwater Commences Drilling on TJ Project and Provides Update on Spring Peak and Lodestar Projects, Nevada
Drilling has commenced on the TJ project in Nevada, with the company also providing an exploration update on its Spring Peak and Lodestar projects in Nevada.
Drill resultsHeadwater Completes Strategic Investment by Centerra Gold
A strategic investment by Centerra Gold in Headwater Gold has closed. No further terms or details are provided in the text of the release.
FinancingHeadwater Gold Grants Stock Options
CorporateHeadwater Gold Commences Drilling at Spring Peak Project, Nevada
Drilling has commenced at the Spring Peak project in Nevada. No further details were provided in the release.
Drill resultsHeadwater Gold Appoints Fraser MacCorquodale as Director
Fraser MacCorquodale has been appointed as a director of Headwater Gold Inc. The announcement was made on 11 April 2024; the release text provided contains no further details.
ManagementHeadwater Gold Announces Planned 2024 Drill Programs on Spring Peak and Lodestar Projects, Nevada
Drill programs are planned for 2024 at the Spring Peak and Lodestar projects in Nevada. The release consists of a headline and a link to the full PDF, with no further details provided in the text.
Drill results
202321 releases
Headwater Gold Acquires the TJ Project in Elko County, Nevada
The TJ Project in Elko County, Nevada has been acquired. No further details on the acquisition terms or project were provided in the release text.
AcquisitionHeadwater Gold Provides Update on 2023 Drilling Activities
Drilling progress was reported across four projects. At Spring Peak, over 3,000 metres of a planned 11,500 metres have been completed in ten holes, with eight holes in the Disco Zone all encountering epithermal veining. Midas North has completed approximately 900 of a planned 3,500 metres in two holes; Mahogany completed five holes totalling 1,573 metres; and Katey completed eleven holes totalling 2,803 metres. Assays are pending, with initial results expected in coming weeks and drilling continuing through late Q4 2023.
Drill resultsHeadwater Gold Commences Drilling on the Midas North Project, Nevada
Drilling has commenced on the Midas North project in Nevada. No further details were provided in the release.
Drill resultsHeadwater Gold Commences Drilling on Its 100% Owned Katey Gold Project
Drilling has commenced at the 100%-owned Katey gold project. No further details, including drill program size or results, were provided in the release text.
Drill resultsHeadwater Gold Commences Drilling at Spring Peak Project, Nevada
Drilling has commenced at the Spring Peak project in Nevada, as stated in a release dated 13th July 2023. No further details on the program were provided in the text.
Drill resultsHeadwater Gold Commences Drilling on Mahogany Project
Drilling has begun at the Mahogany Project. The release consists of a headline and a link to the full PDF announcement, with no further details provided in the text.
Drill resultsHeadwater Gold Signs Additional Earn-In Agreement with Newcrest on Lodestar Project, Nevada
An additional earn-in agreement has been signed with Newcrest covering the Lodestar project in Nevada.
AcquisitionHeadwater Gold Announces Drilling Plans for the Midas North Project, Nevada
Drilling plans have been announced for the Midas North Project in Nevada. No further details are provided in the release text, which links to a PDF version of the announcement dated 20 April 2023.
Drill resultsHeadwater Gold Grants Stock Options
550,000 incentive stock options have been granted to a director, officer, employees and consultants of Headwater Gold. Each option is exercisable for one common share at $0.38 for a five-year term. The grant is subject to acceptance by the Canadian Securities Exchange.
CorporateHeadwater Gold Acquires the Lodestar Gold Project in the Aurora District, Nevada and Outlines 2023 Work Plan
Headwater Gold has acquired the Lodestar epithermal gold-silver project in Nevada's Aurora Mining District, comprising 121 claims staked by the company and 12 claims optioned from a private prospector for an initial US$20,000 cash payment plus escalating annual payments, with a 30-year option to buy 100% for US$1,500,000 subject to a 3% NSR. The property adjoins Hecla's past-producing Aurora mine and sits about 10 km north of Spring Peak. Planned 2023 work includes a 13.5 line-km CSAMT survey, approximately 325 soil samples, mapping and rock chip sampling to define drill targets. Historic drilling returned 10.67 m of 0.291 g/t Au.
AcquisitionHeadwater Gold Announces Additional High-Grade Assays from Spring Peak, Nevada Including a New High-Grade Vein Discovery
Remaining assays from the Q4 2022 Spring Peak drill program in Nevada included SP22-11 with 43.7 g/t Au over 0.63 m within 40.63 m at 1.86 g/t Au, and SP22-12 with 23.5 g/t Au over 0.33 m within 42.61 m at 0.94 g/t Au at the Disco Zone. RC scout hole SP22-14, about 900 m west at Opal Ridge, cut 16.4 g/t Au over 1.52 m within 10.67 m at 2.73 g/t Au. Ten holes totalling 3,173 m were drilled; a multi-rig program is planned for Q2 2023, and claim staking increased the land position by about 30%. Four RC holes at Agate Point returned no significant precious metals intercepts.
Drill resultsHeadwater Gold Announces Drill Plan to Offset High-Grade Gold Discovery at Its 100% Owned Katey Project
Multiple drill targets have been defined to extend high-grade mineralization from hole KT21-01 at the 100% owned, royalty-free Katey gold project in southeast Oregon, with a fully permitted mixed diamond core and RC program of approximately 3,500 metres scheduled to begin in early summer 2023. Metallic-screen assays of KT21-01 returned 6.34 g/t Au over 14.54 metres, including 30.73 g/t Au over 1.95 metres, about 30% above original values. Surface channel samples across the West Zone Fault returned 13.26 g/t Au and 45.2 g/t Ag over 0.69 m.
Drill resultsHeadwater Gold Closes Oversubscribed $2,660,000 Private Placement
A non-brokered private placement closed for gross proceeds of $2,660,000 through the sale of 7,000,000 units at $0.38 per unit, each unit comprising one common share and a half warrant exercisable at $0.55 for two years. Newcrest Mining purchased 705,000 units to maintain its pro-rata 9.9% equity interest, and insiders bought 121,052 units; finders' fees of $55,085 and 144,960 broker warrants were paid. Proceeds will fund exploration on the Company's Western United States portfolio, potential acquisitions and working capital.
FinancingHeadwater Gold Announces Private Placement
A non-brokered private placement of up to 6,000,000 units at $0.38 per unit will raise gross proceeds of up to $2,280,000, with each unit comprising one common share and one half share purchase warrant exercisable at $0.55 for 24 months. Proceeds are earmarked for exploration on Headwater's 100%-owned portfolio in the Western United States, potential project acquisitions and general working capital. Finders' fees may be payable, and directors and officers may participate as a related party transaction.
FinancingHeadwater Gold Defines Multiple High-Priority Drill Targets at the Midas North Project, Nevada
Multiple drill targets have been defined at the Midas North project in Elko County, Nevada, from 2022 geophysical surveys comprising 36.3 line-km of CSAMT resistivity on eight 400 m-spaced profiles, 357 line-km of airborne magnetic and radiometric surveying over 32.5 km2, and a 767-station ground gravity survey covering 114 km2. Targets include Big Opal Sinter, Big Opal Fault, Big Opal Resistor, Jo Belle Fault and the Nevada Grande Resistor, at depths of 200 m to 400 m. A multi-rig maiden drill program is scheduled to begin in Q2, funded by Newcrest under the August 16, 2022 earn-in agreement.
Drill resultsHeadwater Gold Reports High-Grade Gold from Multiple Veins in Initial Assays from Drill Hole SP22-13, Spring Peak Project, Nevada
Drill hole SP22-13 at the Spring Peak project in Nevada intersected two veins grading 15.92 g/t gold over 2.38 m and 10.43 g/t gold over 2.01 m, with a highest individual assay of 69.6 g/t gold over 0.34 m, within a broader zone of 2.73 g/t gold over 34.72 m. These are the first assays from the 2022 program, which totalled 3,173 m and was 100% funded by Newcrest Mining Limited; remaining results are expected in Q1 2023.
Drill results
202211 releases
Headwater Gold Re-Acquires the Flint Project Adjacent to the DeLamar Project, Idaho
A 100% interest in the Flint epithermal gold-silver project in southern Idaho has been re-acquired, royalty-free, comprising 130 claims totalling 1,020 hectares on BLM land about 7 kilometres southwest of Integra Resources' DeLamar and Florida Mountain deposits. Huntsman Exploration, which bought the project from Headwater in December 2020 for US$100,000 cash and 8,450,000 common shares, relinquished the claims without conducting exploration work for a nominal cost of US$130. The Flint District reportedly produced more than 1.5 M oz of silver at 20-30 oz/ton Ag.
AcquisitionHeadwater Gold Announces Completion of 2022 Drilling Campaigns at the Spring Peak and Agate Point Projects, Nevada
The 2022 drill programs at the Spring Peak and Agate Point projects in Nevada have been completed, with drilling suspended due to winter weather. Spring Peak comprised ten holes totalling 3,173 metres (993 m core, 1,076 m RC pre-collars, 1,104 m RC exploration), including four holes offsetting the Disco Vein zone; Agate Point comprised four RC holes totalling 1,027 metres, two of which encountered epithermal alteration at depth. All assays are pending, expected in early 2023. Drilling was 100% funded by Newcrest Mining.
Drill resultsHeadwater Gold Commences Drilling at the Agate Point Project, Nevada
A 2,000 metre reverse circulation scout drill program is underway at the Agate Point project in northwest Nevada, testing for gold mineralization at depth below a large epithermal alteration footprint with widespread mercury and arsenic surface geochemistry. The project lies 50 km along trend from the Sleeper mine, and no known prior exploration drilling has tested for high-grade precious metal veins. The program is fully funded by Newcrest Mining under a multi-project earn-in agreement dated August 16, 2022.
Drill resultsHeadwater Gold Appoints Mr. Brent Cook as Technical Advisor and Promotes Dr. Greg Dering to Vice President, Exploration
Brent Cook has joined Headwater Gold as Technical Advisor, assisting with exploration and corporate strategy; he is an exploration analyst and economic geologist with over 40 years of experience in mineral exploration, mining and related financial sectors, and founded the Exploration Insights newsletter. Dr. Greg Dering has been promoted to Vice President, Exploration. The Company also granted 645,000 incentive stock options to officers, employees and consultants, exercisable at $0.27 for a five-year term, subject to CSE acceptance.
ManagementHeadwater Gold Appoints Mr. Rick Streiff As Technical Advisor
Rick Streiff has joined Headwater Gold as a Technical Advisor, assisting with ongoing exploration in the Western United States. Streiff is a geologist with more than 45 years of experience, including work with Echo Bay, Newmont and OceanaGold, and at epithermal deposits including Round Mountain and Midas in Nevada, Kettle River in Washington, and Waihi in New Zealand. He holds a BSc in Geology from the University of Oregon and has consulted globally since 2020.
ManagementHeadwater Gold Commences Multi-Rig Drill Program at the Spring Peak Project, Nevada to Follow Up Epithermal Vein Discoveries
A multi-rig, 4,000 metre drill program has begun at the Spring Peak project in Nevada, comprising 2,000 m of reverse circulation and 2,000 m of core drilling. The program will step out on the 2021 discovery hole SP21-03, which intersected 1.0 g/t gold over 38.1 m, including 2.5 g/t Au over 9.2 m, and test multiple new high-grade vein targets. Drilling is fully funded by Newcrest Mining Limited under a multi-project earn-in agreement.
Drill resultsHeadwater Gold Commences Exploration Programs on Four Earn-In Projects in Partnership with Newcrest
First-phase exploration has begun on four projects covered by the August 16, 2022 earn-in agreements with Newcrest Mining, under which Newcrest can earn up to 75% by spending an aggregate US$145,000,000 and completing Pre-Feasibility Studies within six years. Plans include about 2,000 m of core and 2,000 m of RC drilling at Spring Peak, Nevada, offsetting 2021 hole SP21-03 (38.1 m of 1.0 g/t Au), a maiden 2,000 m RC program at Agate Point, Nevada in Q4 2022, and 2,000 m of core drilling plus a 12 line-km IP survey at Mahogany, Oregon. Geophysical and sampling work is underway at Midas North, Nevada.
Drill resultsHeadwater Gold Completes Non-Brokered Private Placement of Common Shares to Newcrest
A non-brokered private placement of 5,446,397 common shares at $0.16 per share has closed, raising gross proceeds of $871,424 from a wholly owned subsidiary of Newcrest Mining Limited. Newcrest now holds approximately 9.9% of Headwater's issued and outstanding common shares on a non-diluted basis. Proceeds will fund potential project acquisitions, exploration on the Company's 100%-owned projects in Idaho, Nevada and Oregon, and general working capital; the shares are subject to a hold period expiring December 31, 2022.
FinancingHeadwater Gold Announces Date for Annual General Meeting and Adopts Advance Notice Provisions
An annual general meeting of shareholders will be held on Friday, September 30, 2022, with a record date of the close of business on August 23, 2022. The board approved an advance notice policy on August 31, 2022, effective that date, requiring shareholders to give advance notice of director nominations and setting submission deadlines and required disclosure. For the Meeting, notice of director nominations must be made by August 31, 2022. The full policy is available on SEDAR.
CorporateHeadwater Gold and Newcrest Mining Sign Four Earn-In Exploration Agreements and Newcrest Subscribes to Strategic Equity Investment
Four definitive option and earn-in agreements were signed on August 15, 2022 with a subsidiary of Newcrest Mining, giving Newcrest the option to acquire up to 75% in each of the Mahogany Project in Oregon and the Agate Point, Midas North and Spring Peak projects in Nevada for cumulative exploration expenditures of US$145,000,000 plus Pre-Feasibility Studies containing a minimum 1.5 million gold or gold-equivalent ounce resource per project. Newcrest's firm minimum commitment is US$8,500,000, with a US$612,989 cost reimbursement. Newcrest will also buy 5,446,397 shares at $0.16 for $871,424, about 9.9%.
AcquisitionHeadwater Gold Commissions Airborne Hyperspectral, Magnetic, and Radiometric Surveys at Midas North and Spring Peak Projects, Nevada
Service providers have been engaged to fly a helicopter aeromagnetic and radiometric survey at the Midas North Project and fixed-wing hyperspectral imagery surveys covering both Midas North and Spring Peak in Nevada, aimed at defining drill targets within epithermal alteration cells. Data are intended to support a maiden drill program at Midas North and prioritize offset drilling at Spring Peak following 2021 hole SP21-03, which returned 1.00 g/t Au over 38.1 metres, including 9.2 metres of 2.49 g/t gold. Diamond core drilling is planned for 2022.
Drill results
