202616 releases
Juggernaut Confirms Area Of 550 M By 500 M Of Extensive High Grade Gold Mineralization With Surface Samples Up To 7.68 Oz/T Gold On Goldswarm That Remains Open And Drill Ready On New District Scale Gold Silver Copper Discovery On 100% Controlled Big One Property, Golden Triangle, B.C. (PDF Link)
Juggernaut Exploration reports 2026 surface grab samples at its Goldswarm Discovery on the Big One property in the Golden Triangle, British Columbia, with gold assays up to 239.02 g/t Au (7.68 oz/t Au). The company says gold mineralization is confirmed over an area of 550 m by 500 m that remains open and drill ready, with an inaugural drill program planned for 2027. The release also gives Motherlode Zone drill results, including hole BO-26-29 at 2.57 g/t Au over 3.00 m.
Drill resultsJuggernaut Drills 3.08 G/T Au Over 5.03 Meters From Whopper Zone On New District Scale Gold Silver Copper Discovery On 100% Controlled Big One Property, Golden Triangle, B.C. (PDF Link)
Drill hole BO-26-11 at the Whopper Zone returned 3.08 g/t Au over 5.03 m, including 6.97 g/t Au over 2.00 m, on the 100%-controlled Big One property in British Columbia's Golden Triangle, while BO-26-4 at the Big Mac Zone returned 3.20 g/t Au over 4.02 m, including 10.76 g/t Au over 1.09 m. Results reflect gold only; 30 holes totaling 13,015 m are complete, with gold assays pending on 17 holes and multi-element assays on 30.
Drill resultsJuggernaut 10,000 Meter Inaugural Drill Program Commenced On New District Scale High-Grade Gold Silver Copper Rich Discovery At 100% Controlled Big One Property, Golden Triangle, B.C. (PDF Link)
Drilling has begun at the 100%-controlled Big One property in B.C.'s Golden Triangle, with a fully funded ~10,000 metre inaugural program using two rigs to test veins in the 22 km2 Eldorado zone, targeting the Whopper, Big Mac and Gold Dome (XXXL) zones. Surface grab samples there assayed up to 263.70 g/t AuEq and channel cuts up to 4.89 g/t AuEq over 5.21 m. The company also granted 2,200,000 stock options at $1.61, exercisable for ten years and fully vested.
Drill resultsJuggernaut Receives $10,341,500 From Warrants Exercised (PDF Link)
Juggernaut Exploration received $10,341,500 from a 100% exercise of its $0.75 warrants previously announced on May 26, 2026, with the exercise period ending at 4:00 PM PDT on June 25, 2026. The company has 50,044,599 shares issued and outstanding and states it has raised over $35,000,000 from institutions and accredited investors since optioning the Big One property, and is funded until 2029.
FinancingJuggernaut Calls Warrants From May 2025 Financing (PDF Link)
Juggernaut is accelerating the exercise period of share purchase warrants after its shares closed at $1.50 or higher on the TSX Venture Exchange for 10 consecutive trading days. The affected warrants, all with a $0.75 exercise price, comprise 319,925 and 11,308,770 issued May 16, 2025, and 120,000 and 2,040,000 issued June 2, 2025. All now expire at 4:00 PM on June 25, 2026, after which unexercised warrants will be null and void.
FinancingJuggernaut Mobilizes For Inaugural 10,000 Meter Drill Program To Test New District Scale High Grade Gold Silver Copper Rich Discovery At 100% Controlled Big One Property, Golden Triangle, B.C. (PDF Link)
Mobilization has begun for an inaugural 10,000 metre drill program at the 100%-owned Big One property in B.C.'s Golden Triangle, targeting the largest veins within the 22 km2 Eldorado zone. Surface grab samples there assayed up to 263.70 g/t AuEq and channel cuts up to 4.89 g/t AuEq over 5.21 m from more than 400 veins up to 10 m wide. Holes will test the Whopper, Big Mac and Gold Dome zones and a possible magmatic source at depth. A 5-year drill permit is valid until March 31, 2031.
Drill resultsJuggernaut Exploration Closes Bought Deal Private Placement for Gross Proceeds of C$11.5M (PDF Link)
A bought deal private placement closed for gross proceeds of approximately C$11.5 million, comprising 4,492,187 units at C$2.56 per unit, each unit including one flow-through common share and one-half warrant exercisable at C$2.08 for 24 months. Stifel Canada acted as sole bookrunner and lead underwriter, receiving a C$689,999.92 cash commission and 269,531 broker warrants exercisable at C$1.81. Proceeds will fund qualifying exploration expenditures on the Big One Project in British Columbia, to be incurred by December 31, 2027.
FinancingJuggernaut Exploration Announces Bought Deal Private Placement Structured Flow-Through Financing for Gross Proceeds of C$10M (PDF Link)
A bought deal private placement of 3,906,250 flow-through units at $2.56 per unit for gross proceeds of $10,000,000 has been agreed with Stifel Canada as sole bookrunner and underwriter. Each unit includes one FT share and one-half warrant exercisable at $2.08 for 24 months, with a 15% underwriter's option; the underwriter receives a 6.0% cash commission and broker warrants at C$1.81. Proceeds will fund exploration at the Big One Gold Project in British Columbia, with closing expected on or about March 19, 2026.
FinancingJuggernaut Confirms Free Milling Gold On New District Scale Gold Silver Copper Rich Discovery At 100% Controlled Big One Property, Golden Triangle, B.C. (PDF Link)
A petrographic study by the Colorado School of Mines on the 100%-owned Big One property in B.C.'s Golden Triangle found free milling gold up to 150 microns in size, with grains of 80-90 wt% gold and 10-20 wt% silver, and no deleterious elements such as mercury or arsenic. Fluid inclusions containing liquid and gaseous CO2 indicate a magmatic, potentially porphyry, source. A fully funded 10,000 m maiden drill program is slated to start in May 2026, under a drill permit valid to March 31, 2031.
Drill resultsJuggernaut Samples Up To 256.60 G/T Or 8.25 Oz/T Gold And Identifies 4 New Gold-Rich Zones That Remain Wide Open And Are Drill Ready Within The Highway Of Gold Corridor On The Big One Property, Golden Triangle, B.C. (PDF Link)
Surface sampling on the Big One property in B.C.'s Golden Triangle returned grabs up to 256.60 g/t Au at the newly identified Gold Dome Zone, 226.94 g/t Au at Gold Swarm, 111.35 g/t Au at Big Mac and channel results to 39.84 g/t Au at Whopper, four drill-ready zones along the 15 km Highway of Gold Corridor. A total of 421 rock samples were collected in 2025; silver, copper, lead and zinc assays are pending. A drill permit application has been submitted.
Drill resultsJuggernaut Confirms District Scale Gold-Rich System On Big One Property Measuring 22 Km2 With Assays Up To 263.70 G/T Aueq (8.48 Oz/T Aueq) That Is Drill Ready, Golden Triangle, B.C. (PDF Link)
Mapping and sampling at the Big One property in B.C.'s Golden Triangle have linked the Big Mac, Whopper and Gold Dome zones into a 22 km2 Eldorado System, with grab samples up to 263.70 g/t AuEq (8.48 oz/t) and channel cuts up to 4.89 g/t AuEq over 5.21 m from more than 400 veins. Additional claims expanded the Gold Swarm area from 1 km2 to 3 km2, where grabs assayed up to 231.81 g/t AuEq. A 5-year advanced exploration drill permit was received.
Drill resultsJuggernaut Receives 5 Year Drill Permit For 100% Controlled Big One Property, Golden Triangle, B.C. (PDF Link)
A five-year drill permit has been granted for the 100%-controlled Big One property in B.C.'s Golden Triangle, valid until March 31, 2031. A fully funded inaugural drill program is planned for 2026, targeting gold-rich shear-hosted veins in the 22 km² Eldorado System and the 3 km² Gold Swarm discovery, where grab samples assayed up to 263.70 g/t AuEq and 231.81 g/t AuEq respectively. UAV photogrammetry over 52 km² and a 385 km² LiDAR survey have been completed.
CorporateJuggernaut Appoints Manuele Lazzarotto, Ph.D. In Metamorphic Petrology President And COO (PDF Link)
Manuele (Lele) Lazzarotto, Ph.D., has been appointed President and Chief Operating Officer of Juggernaut Exploration. He has over a decade of mineral exploration experience and most recently acted as Chief Geologist on Goliath Resources' Surebet discovery from 2019 to 2025. The Company is preparing to launch a fully funded ~10,000-metre drill program at its Big One property in the Golden Triangle of northwestern British Columbia.
ManagementJuggernaut Announces Fully Funded 10,000 Meter Inaugural Drill Program On New District-Scale Gold Silver Copper Rich System At 100% Controlled Big One Property, Golden Triangle, B.C. (PDF Link)
A fully funded 10,000 m inaugural drill program is planned for the 100%-controlled Big One property in British Columbia's Golden Triangle, targeting high-grade gold-silver-copper shear-hosted veins in the 22 km2 Eldorado System and 3 km2 Gold Swarm discovery. Eldorado grab samples assayed up to 263.70 g/t AuEq (256.60 g/t Au, 546.00 g/t Ag, 0.43% Cu) and Gold Swarm up to 231.81 g/t AuEq. A five-year drill permit valid to March 31, 2031 was received.
Drill resultsJuggernaut Exploration Ltd. is pleased to announce attendance in both the Vancouver Resource Investment Conference (VRIC) and AME Roundup 2026 (PDF Link)
Juggernaut Exploration will exhibit at AME Roundup 2026 at Booth #1100C at the Vancouver Convention Centre East Building from Monday, January 26 to Wednesday, January 28, 2026 (9:00 AM–4:00 PM) and Thursday (9:00 AM–2:30 PM). The company will also attend the Vancouver Resource Investment Conference at Booth #123 in the West Building on January 25–26, 2026, where CEO Dan Stuart will present on January 25 at 11:50 AM at Workshop #4.
CorporateOffering – Feb 27, 2026
A bought-deal private placement of 3,906,250 flow-through units at $2.56 per unit for gross proceeds of $10,000,000 was launched under the listed issuer financing exemption, with Stifel Nicolaus Canada Inc. as sole bookrunner holding a 15% option that could raise the total to 4,492,187 units and $11,500,000. Each unit includes one flow-through share and half a warrant exercisable at $2.08 for 24 months. Closing is expected on or about March 19, 2026, with proceeds funding exploration at the Big One property in British Columbia's Golden Triangle.
Financing
