Campo Morado Mine

Mexico

Campo Morado Mine is a mineral project in Mexico, at the production stage, held by Luca Mining (TSXV: LUCA).

16 news releases are filed under it here.

← Luca Mining profileCompany website ↗

Key facts

CompanyLuca Mining (TSXV: LUCA)
LocationMexico
StageProduction

News releases16 on file

  1. Aug 17, 2026

    Luca Mining Corp. Reports $10.5 Million of Net Earnings in Q2

    Q2 2026 revenue rose 47% to $58.4 million from $39.7 million a year earlier, with net earnings of $10.5 million ($0.04 per share) versus a $3.2 million loss, adjusted net earnings of $6.9 million and Adjusted EBITDA of $14.3 million. First-half revenue was $116.0 million with net earnings of $23.1 million and a cash balance of $24.7 million at June 30, 2026. Campo Morado (Guerrero) produced 32.3 m

    Corporate
  2. Aug 6, 2026

    Luca Intersects 184 Metres of 1.2 g/t Gold, 72 g/t Silver, 0.4% Copper, 0.5% Lead and 1.7% Zinc at the Largo Norte Zone, Campo Morado Mine

    Underground drillhole CMUG-26-50 at the Largo Norte zone of the Campo Morado polymetallic VMS mine in Guerrero State, Mexico returned 183.7 m of 1.18 g/t Au, 72.42 g/t Ag, 0.39% Cu, 0.45% Pb and 1.67% Zn from 3.6 m, including 18.3 m of 2.64 g/t Au, 152.34 g/t Ag, 0.53% Cu, 1.05% Pb and 2.52% Zn. At the unmined Naranjo zone, CMUG-26-46 cut 90.6 m of 0.99 g/t Au, 40.07 g/t Ag, 0.94% Cu, 0.18% Pb and

    Drill results
  3. Jul 20, 2026

    Luca Reports Q2 2026 Production Results

    Consolidated payable production for the three months ended June 30, 2026 was 5,373 oz gold, 267,404 oz silver, 656k lbs lead, 6,347k lbs zinc and 1,963k lbs copper from the Campo Morado and Tahuehueto mines in Mexico. Cash was approximately $24.7 million at June 30, 2026, down from $36.4 million at March 31, 2026, with remaining debt of about $1.4 million to be repaid in July 2026. The quarter inc

    Corporate
  4. Jun 23, 2026

    Luca intersects 28.4 metres of 2.3 g/t Gold, 135 g/t Silver, 0.6% Copper, 1% lead and 3.7% Zinc at the EL Rey Zone, Campo Morado Mine

    Surface drillhole CMRY-26-10 at the El Rey zone of the Campo Morado polymetallic VMS mine in Guerrero State, Mexico returned 28.4 m of 2.28 g/t Au, 134.89 g/t Ag, 0.57% Cu, 0.95% Pb and 3.69% Zn from 104.2 m, including 9.7 m of 4.09 g/t Au, 208.99 g/t Ag, 0.74% Cu, 1.33% Pb and 5.05% Zn. In the unmined Naranjo zone, CMUG-26-44 cut 19.6 m of 2.78 g/t Au, 103.12 g/t Ag, 0.52% Cu, 0.67% Pb and 2.75%

    Drill results
  5. Jun 8, 2026

    Luca Provides Operations and Corporate Update

    Campo Morado in Guerrero State held a surface stockpile of approximately 63,000 tonnes of mineralized material as at May 31, 2026, up from less than 12,000 tonnes at December 31, 2025, with mill throughput averaging about 1,900 tpd in April–May. At Tahuehueto in Durango State, milling rates averaged over 1,050 tpd in April and May, more than a 5% increase over the first quarter of 2026. Chief Tech

    Corporate
  6. May 26, 2026

    Luca Mining Corp. Reports Strong First Quarter 2026 Results

    Q1 2026 revenue rose 40% to $57.6 million, with net earnings of $12.6 million (versus $4.5 million in Q1 2025), Adjusted EBITDA of $25.4 million and operating cash flow of $21.6 million; cash increased $10.8 million to $36.4 million and sustaining and exploration capital spending totalled $10.9 million. Campo Morado in Guerrero produced 37.3 million zinc-equivalent pounds at AISC of $1.19/lb, whil

    Corporate
  7. May 14, 2026

    Luca Announces Intention To Launch Normal Course Issuer Bid

    A normal course issuer bid will allow the repurchase and cancellation of up to 13,750,000 common shares, about 5% of the current issued and outstanding shares. The NCIB is expected to commence May 21, 2026 and terminate May 20, 2027, or earlier if the maximum is reached, with purchases made through the TSX Venture Exchange and other Canadian markets via Stifel Nicolaus Canada Inc. Luca operates th

    Corporate
  8. Apr 28, 2026

    Luca intersects 118 metres of 2.5 g/t Gold, 78.0 g/t Silver, 0.8% Copper, 0.6% Pb and 2.0% Zinc at Largo Norte Zone, Campo Morado Mine

    Underground drilling at the Largo Norte zone of the Campo Morado polymetallic VMS mine in Guerrero State, Mexico returned 118.2 m of 2.53 g/t Au, 77.89 g/t Ag, 0.76% Cu, 0.57% Pb and 1.99% Zn from 179.9 m in hole CMUG-26-38, and 100.7 m of 2.80 g/t Au, 90.72 g/t Ag, 0.59% Cu, 0.71% Pb and 2.59% Zn from 113.0 m in CMUG-26-39. Hole CMUG-26-41 cut 71.0 m of 1.57 g/t Au, 20.12 g/t Ag and 0.72% Cu from

    Drill results
  9. Apr 21, 2026

    Luca Reports Robust Q1 Production Results and Materially Strengthens Balance Sheet

    Cash increased to approximately $36.4 million as at March 31, 2026, from $25.5 million at year-end 2025, driven by operating cash flow plus about $2.1 million from warrant and option exercises and roughly $3.6 million in net realized gains on silver call options. Debt stands at approximately $1.4 million and is expected to be fully repaid by mid-2026. Luca drilled about 10,058 metres in Q1 2026 on

    Corporate
  10. Apr 8, 2026

    Luca Mining Corp. Reports Record Annual Results for 2025 and Exceeds Revised Production Guidance

    Annual revenue for 2025 rose 103% to $176.8 million from $87.2 million, with Adjusted EBITDA up 226% to $46.0 million and net free cash flow before working capital of $20.8 million, including $15.5 million in Q4; a net loss of $21.1 million was reported, driven mainly by a $38.9 million non-cash fair value change on silver stream derivative liabilities. Cash rose to $25.5 million and loans payable

    Corporate
  11. Mar 9, 2026

    Luca Strengthens Technical Leadership with Appointment of COO and Builds Team to Execute on Mine Optimizations

    Nick Shakesby has been appointed Chief Operating Officer of Luca Mining effective April 1, 2026, joining from COMINVI S.A. where he was CEO since 2023. Ramón Mendoza moves from COO/CTO to a dedicated CTO role leading the Campo Morado Expansion, and Dr. Jose Hernandez joined as Vice President, Metallurgy and Process Engineering effective March 1, 2026. The Campo Morado Expansion, mine plan and Mine

    Management
  12. Feb 18, 2026

    Luca Advances Study to Optimize Campo Morado and Increase Gold and Silver Production

    Luca Mining's board has approved a mill optimization and expansion study and mine plan update for the Campo Morado mine in Guerrero State, Mexico, to be delivered as an NI 43-101 technical report in the second half of 2026. Ausenco PTY Ltd. will lead the two-phase study: Phase 1 covers a bulk sulphide flotation flowsheet with ultra-fine grinding to an 8-10 micron target, and Phase 2 evaluates reco

    Study results
  13. Feb 17, 2026

    Luca intersects 136 metres of 1.6 g/t Gold, 77 g/t Silver, 0.9% copper and 1.6% zinc at Largo Norte Zone, Campo Morado Mine

    Underground drillhole CMUG-25-36 at the Campo Morado polymetallic VMS mine in Guerrero State, Mexico cut 135.7 m of 1.58 g/t Au, 77.10 g/t Ag, 0.88% Cu, 0.40% Pb and 1.61% Zn from 87.7 m, including 16.0 m of 3.20 g/t Au, 191.84 g/t Ag, 0.99% Cu, 1.29% Pb and 5.03% Zn, extending the Largo Norte Zone about 20 m. CMUG-25-33 returned 14.3 m of 1.50 g/t Au, 75.81 g/t Ag, 1.01% Cu, 0.46% Pb and 2.81% Zn

    Drill results
  14. Jan 30, 2026

    Luca Drills 28.6 Metres of 5.35 g/t AuEq at the El Rey Deposit at Campo Morado

    Phase 2 surface drilling at the El Rey deposit at the Campo Morado polymetallic VMS mine in Guerrero State, Mexico — the first drilling there in over 14 years — returned 28.6 m of 5.35 g/t AuEq from 229.7 m, including 2.8 m of 12.55 g/t AuEq (CMRY-25-02), and 21.0 m of 6.13 g/t AuEq, including 2.2 m of 25.38 g/t AuEq (CMRY-25-06). Hole CMRY-25-05 extended mineralization more than 30 metres beyond

    Drill results
  15. Jan 12, 2026

    LUCA DRILLS 55.8 METRES OF 5.90 G/T AUEQ AT CAMPO MORADO - CONFIRMS NEAR-MINE HIGH-GRADE MINERALIZATION AND EXPANDS EXPLORATION PROGRAM

    Surface drilling at the Reforma Deposit at the Campo Morado polymetallic VMS mine in Guerrero State, Mexico returned 55.8 m of 5.90 g/t AuEq in hole CMRF25-15, including 7.7 m of 10.09 g/t AuEq, and 25.1 m of 8.31 g/t AuEq in CMRF25-13, including 4.9 m of 11.32 g/t AuEq. Underground hole CMUG-25-25 cut 4.0 m of 1.04% Cu about 60 m from existing workings. A second surface rig was mobilized in Decem

    Drill results
  16. Nov 12, 2025

    Luca Launches Three-Year, US$25 Million Exploration Program to Unlock Exceptional Gold Potential at Campo Morado and Tahuehueto

    A three-year, US$25 million exploration program has been launched across the wholly owned Campo Morado (Guerrero) and Tahuehueto (Durango) mines in Mexico, comprising 80,000 metres of surface and underground diamond drilling, with US$6.5 million and 20,000 metres budgeted for 2026 and US$18.5 million for 60,000 metres over 2027–2028. Drilling will test 38 priority targets at Campo Morado, includin

    Drill results

Related

Other Luca Mining projects

  • TahuehuetoMine · Gold · Mexico
Luca Mining profile →Luca Mining news →Reading an NI 43-101 →