JUNIOR MININGINTELLIGENCE
CompaniesNewsProspectors EXLive NowMedia
JUNIOR MININGINTELLIGENCE
CompaniesNewsProspectors EXLive NowMedia
  1. Home
  2. /
  3. Companies
  4. /
  5. Tier One Silver Inc.
  6. /
  7. Curibaya

Curibaya

Silver · Canada

Curibaya is a silver project in Canada, at the early exploration stage, held by Tier One Silver Inc. (TSXV: TSLV).

4 news releases are filed under it here.

← Tier One Silver Inc. profileCompany website ↗

Key facts

CompanyTier One Silver Inc. (TSXV: TSLV)
CommoditySilver
LocationCanada
StageEarly exploration

About Curibaya

The Curibaya property is comprised of approximately 16,800 hectares situated in a copper porphyry belt that hosts some of Peru’s largest porphyry deposits, including Freeport McMoRan’s Cerro Verde deposit, Southern Copper’s Cuajone and Toquepala deposits and Anglo American’s Quellaveco deposit. The project is the first major epithermal occurence in this belt, which covers the regional Incapuquio fault zone and subsidiary structures, which are interpreted as one of the fundamental controls for both epithermal and porphyry styles of mineralization within the region. Importantly, the licenses host a number of cross structures to the Incapuquio fault zone that are considered highly prospective. Initial surface sampling programs at Curibaya returned numerous high-grade samples of silver, gold and copper over a 4 kilometre (km) x 5 km alteration system. The 2021 maiden drill program has returned multiple significant intercepts, including1.5 metres (m) of 1,129 g/t silver, 1.04 g/t Au in a la

News releases4 on file

  1. Jun 11, 2026

    Tier One Silver Reports Additional High-Grade Intercepts, Including 1 Metre of 448.2 g/t Ag and 0.37 g/t Au, from Phase 2 Drilling at Curibaya

    Final assay results from the eight-hole, 1,133.6 m Phase 2 diamond drill program at the Curibaya silver-gold-copper project in Tacna, Peru returned 1.0 m of 448.2 g/t silver and 0.37 g/t gold within 4.0 m of 136.2 g/t Ag and 0.15 g/t Au in hole 26CUR-023, and 2.70 m of 284.41 g/t Ag and 1.29 g/t Au, including 0.70 m of 1,015.00 g/t Ag and 4.52 g/t Au, in hole 26CUR-018. Seven of eight holes contai

    Drill results
  2. Apr 21, 2026

    Tier One Silver Intersects 0.7 Metres of 1,015 g/t Silver and 4.52 g/t Gold at Curibaya

    Assay results from the first four of eight holes of Phase 2 diamond drilling at the Curibaya silver-gold-copper project in Tacna, Peru returned 0.7 m of 1,015 g/t silver and 4.52 g/t gold within 2.7 m of 284.4 g/t silver and 1.29 g/t gold in hole 26CUR-018 in the Cambaya I corridor. The 1,133.6 m program averaged about 140 m per hole; four holes remain pending. Tier One is applying for an EIA-sd t

    Drill results
  3. Feb 18, 2026

    Tier One Silver Commences Phase 2 Drilling at High-Grade Curibaya Project in Peru

    Phase 2 diamond drilling has begun at the Curibaya silver-gold-copper project in southern Peru, the first follow-up to the 2021 inaugural campaign, with San Jose Drilling engaged as contractor. The program initially comprises approximately 1,150 m in seven holes from four platforms, expected to be completed in Q1 2026, mainly testing beneath high-grade channel samples in the undrilled Cambaya 1 co

    Drill results
  4. Jan 8, 2026

    Tier One Silver to Commence Drill Program at High-Grade Flagship, Curibaya Project, in Southern Peru

    Preparations have begun for a Phase 2 diamond drill program at the Curibaya silver-gold-copper project in Tacna, Peru, targeting the previously undrilled Cambaya 1 corridor. The program consists of approximately 1,150 metres in seven holes from four platforms with one rig, averaging 150 m–250 m per hole, and is targeted for completion in Q1 2026. Drilling will test beneath channel samples includin

    Drill results

Related

Other Tier One Silver Inc. projects

  • Hurricane · Peru
Tier One Silver Inc. profile →Tier One Silver Inc. news →Reading an NI 43-101 →