Key facts
| Company | Tudor Gold (TSXV: TUD) |
|---|---|
| Location | British Columbia, Canada |
| Stage | Early exploration |
About Treaty Creek Project
The Golden Triangle area of British Columbia an area known to host several of the largest and highest-grade gold deposits in the world.
News releases63 on file
Tudor Gold Expands Treaty Creek’s Perfectstorm Zone Copper-Gold Porphyry System, Further Defines Higher-Grade Epithermal Overprint and Updates Status of PEA
Four holes at the Perfectstorm Zone on the 80%-owned Treaty Creek Project in British Columbia extended the PSP copper-gold-silver-molybdenum porphyry system 480 metres down-dip, with PS-26-30 returning 0.85 g/t gold and 2.94 g/t silver over 96.30 metres, PS-26-32 returning 0.98 g/t gold over 31.80 metres and 15.05 g/t gold over 1.50 metres, and PS-26-29 cutting 1.16 g/t gold and 13.92 g/t silver o
Drill resultsTudor Gold Expands Treaty Creek’s Perfectstorm Zone Copper-Gold Porphyry System and Potential for Broader Gold-dominant Epithermal System
Results from ten drill holes (PS-26-19 to 28) at the Perfectstorm Zone of the 80%-owned Treaty Creek Project in British Columbia's Golden Triangle include hole PS-26-23 with 0.26 g/t gold, 2.13 g/t silver, 0.25% copper and 23.05 ppm molybdenum over 100.30 meters from 166.50 meters, plus 0.98 g/t gold and 9.39 g/t silver over 101.00 meters from 293.50 meters, and hole PS-26-28 with 3.51 g/t gold ov
Drill resultsTudor Gold Discovers New Copper-Gold Porphyry System and Confirms Gold-Silver Epithermal Trend Within Treaty Creek’s Perfectstorm Zone
The first four holes at the Perfectstorm Zone on the 80%-owned Treaty Creek Project in British Columbia's Golden Triangle identified a new copper-gold-silver-molybdenum porphyry system (PSP Zone) about one kilometre southwest of the Goldstorm Deposit. Hole PS-26-15 returned 4.59 g/t gold and 0.67 g/t silver over 10.50 metres from 105.00 metres, plus 0.24 g/t gold, 2.11 g/t silver, 0.21% copper and
Drill resultsTudor Gold Discovers Higher-Grade Silver Breccia within CBS Zone at Treaty Creek
Drillhole CBS-26-08 at the CBS Zone on the 80%-owned Treaty Creek Project in British Columbia's Golden Triangle returned 61.28 g/t silver and 0.09 g/t gold over 34.15 m from 264.00 m, including 201.84 g/t silver and 0.07 g/t gold over 7.20 m, plus 0.53 g/t gold and 9.81 g/t silver over 20.60 m from 61.90 m. CBS-26-09 returned 0.79 g/t gold and 4.71 g/t silver over 47.00 m from 153.00 m, extending
Drill resultsTudor Gold Launches AI-Assisted Mineral Prospectivity Assessment at Treaty Creek
An AI-assisted mineral prospectivity assessment has been launched at the Treaty Creek gold-copper-silver project in British Columbia's Golden Triangle, to be conducted by ZEMÎ Technologies using machine-learning-based prospectivity mapping to refine drill targets for later in the 2026 program and for 2027. The 2026 exploration program is underway with two diamond drills turning. Tudor also granted
NewsTudor Gold Commences 2026 Exploration Drill Program At Treaty Creek
A minimum 10,000-metre 2026 drill program has begun with two diamond drills at the Treaty Creek gold-copper-silver project in British Columbia's Golden Triangle. Phase One targets the CBS Zone with 2,000 metres, following CBS-21-02 which returned 0.78 g/t gold and 2.34 g/t silver over 155 metres, including 1.24 g/t gold and 4.35 g/t silver over 53 metres. Phase Two allocates 8,000 metres to the Pe
Drill resultsTudor Gold Reports Positive Metallurgical Test Results for Treaty Creek
Metallurgical locked-cycle testing on the Goldstorm Deposit at Treaty Creek, British Columbia, produced saleable concentrates from all three zones: the Upper Zone recovered 86% of gold at 26.1 g/t and the Lower Zone 87% at 19.0 g/t, while the Central Zone achieved combined recoveries of 82.1% gold, 88.7% silver and 94.1% copper. A blended composite of all three zones returned combined recoveries o
Study resultsTudor Announces Plans for 2026 Exploration Program at Treaty Creek; Comments on Positive Outcome for Treaty Creek Project Permitting Overlap
A 10,000-metre-plus drill program is planned at the Treaty Creek project in British Columbia, with two drills mobilizing by mid-May and drilling through late September/early October: 2,000 metres at the CBS Zone and 8,000 metres at the Perfectstorm Zone, with more dependent on success. Separately, the Major Mines Office advised Seabridge in an April 9, 2026 letter that it would not deliberate on K
Drill resultsTudor Gold Announces Filing of Treaty Creek Project, NI 43-101 Technical Report
An NI 43-101 technical report titled "NI 43-101 Technical Report, Treaty Creek Project, British Columbia," with an effective date of November 30, 2025, has been filed on SEDAR+ and the company website. The report was prepared by independent qualified persons Garth Kirkham, P.Geo. of Kirkham Geosystems Ltd. and Renee Goold (Morrison), P.Eng. of Fuse Advisors Inc. Tudor Gold holds an 80% interest in
Study resultsTudor Gold Launches Preliminary Economic Assessment on Treaty Creek Project
Fuse Advisors Inc. of Vancouver has been retained to prepare a preliminary economic assessment on the Goldstorm Deposit at the Treaty Creek Project in British Columbia's Golden Triangle, targeting an underground mine plan of up to 10,000 tonnes per day and defining approximately 50 million to 100 million tonnes grading above 2.5 g/t gold. Preliminary metallurgical testwork indicates concentrate gr
Study resultsTudor Gold Announces Updated Mineral Resource Estimate for Treaty Creek Project, with Higher-Grade Sensitivities
An updated mineral resource estimate for the Goldstorm Deposit at the Treaty Creek Project in British Columbia's Golden Triangle reports, at a US$50 per tonne NSR cut-off, indicated resources of 912.3 million tonnes grading 0.85 g/t gold, 5.07 g/t silver and 0.15% copper (24.9 million ounces gold, 148.7 million ounces silver, 3.048 billion pounds copper) plus inferred resources of 86.1 million ton
Resource updateTudor Gold Provides 2025 Year End Review and Strategy for 2026
An updated Mineral Resource estimate for the Goldstorm Deposit at Treaty Creek, British Columbia, is targeted for January 2026, incorporating roughly 15,000 meters of 2024 and 2025 drilling and a sub-domained 0.5 m block model; metallurgical results on the 300H/N, CS600 and DS5 zones are expected in Q1 2026. The 2025 program drilled 5,052 meters in five holes, including 2.31 g/t gold, 16.98 g/t si
CorporateTudor Upsizes Flow-Through Financing
Tudor Gold intends to increase its non-brokered private placement to up to 12.75 million flow-through units, from 8.5 million units, at $0.95 per unit for gross proceeds of up to approximately $12 million. Each unit comprises one flow-through common share and one-half warrant exercisable at $1.20 for two years. Proceeds will fund exploration at the Treaty Creek Project in British Columbia, with ex
FinancingTudor Announces Flow-Through Financing
A non-brokered private placement of up to 8.5 million flow-through units at $0.95 per unit for gross proceeds of up to approximately $8 million is planned. Each unit includes one flow-through common share and one-half warrant exercisable at $1.20 for two years. Proceeds will fund exploration at the Treaty Creek Project in British Columbia and other Canadian exploration expenses, to be incurred on
FinancingTudor Gold Completes 2025 Exploration Program at Treaty Creek
The 2025 exploration program at the 80%-owned Treaty Creek project in British Columbia's Golden Triangle is complete, with final hole GS-25-191-W1 returning 1.37 g/t gold, 4.09 g/t silver and 0.01% copper (1.43 g/t AuEQ) over 23.80 m, including 1.63 g/t gold over 10.70 m, plus intercepts of 1.76 g/t gold over 6.80 m and 1.88 g/t gold over 5.90 m. An updated Mineral Resource estimate using 5m block
Drill resultsTudor Gold Provides Proposal to Resolve Golden Triangle Permitting Overlap
A proposal has been set out to resolve a land use conflict in British Columbia's Golden Triangle, where roughly 12 kilometers of Seabridge Gold's planned 22-kilometer Mitchell-Treaty Twinned Tunnels for the KSM project would run through Tudor's Goldstorm Deposit and Perfectstorm Zone at Treaty Creek. Tudor's May 2025 alternative would shift the route about one kilometer north, adding roughly 2.5 k
CorporateTudor Gold Intersects 1.70 g/t Gold Over 46.00 Meters at Treaty Creek
Drillhole GS-25-191 at the 80%-owned Treaty Creek Project in British Columbia's Golden Triangle returned 1.70 g/t gold, 12.56 g/t silver and 0.02% copper (1.85 g/t AuEQ) over 46.00 m, including 4.12 g/t gold over 8.90 m and 1.91 g/t gold over 7.40 m. The hole links the 300 North and 300 Horizon zones along a corridor now measuring about 350 m by 150 m, expanding 300N by 55 m southwest and 300H by
Drill resultsTudor Gold Intersects 1.70 g/t Gold Over 73.50 Meters at Treaty Creek
Drillhole GS-25-190 at the 80%-owned Treaty Creek Project in British Columbia's Golden Triangle returned 1.70 g/t gold, 3.46 g/t silver and 0.01% copper (1.75 g/t AuEQ) over 73.50 m, including 2.03 g/t gold over 38.0 m and 4.41 g/t gold over 10.50 m. The hole extends the 300 Horizon Zone 70 m east and the 300 North Zone 45 m southwest, connecting the two zones. Results from the remaining two 2025
Drill resultsTudor Gold Intersects 2.57 g/t Gold Equivalent Over 54.00 Meters at Treaty Creek, Northwest British Columbia
Hole GS-25-188 at the 80%-owned Treaty Creek Project in British Columbia's Golden Triangle returned 2.57 g/t AuEQ over 54.00 m (2.31 g/t Au, 16.98 g/t Ag, 0.07% Cu), including 5.64 g/t AuEQ over 6.00 m, stepping out 45 m north of the 300N Zone. Hole GS-25-189 cut 7.06 g/t AuEQ over 3.00 m, 1.29 g/t AuEQ over 204.00 m and 4.14 g/t AuEQ over 10.20 m. Tudor will also issue 422,874 shares at $0.69 to
Drill results