JUNIOR MININGINTELLIGENCE
CompaniesNewsProspectors EXLive NowMedia
JUNIOR MININGINTELLIGENCE
CompaniesNewsProspectors EXLive NowMedia
  1. Home
  2. /
  3. Companies
  4. /
  5. Yukon Metals Corp.
  6. /
  7. Birch

Birch

Gold · Canada

Birch is a gold project in Canada, at the early exploration stage, held by Yukon Metals Corp. (CSE: YMC).

13 news releases are filed under it here.

← Yukon Metals Corp. profileCompany website ↗

Key facts

CompanyYukon Metals Corp. (CSE: YMC)
CommodityGold
LocationCanada
StageEarly exploration

About Birch

The Birch property has potential for porphyry-style mineralization and is located close to the Alaska Highway.

News releases13 on file

  1. Oct 1, 2026

    Yukon Metals Intersects 23.5 Metres of 0.48 G/T Gold and 0.11% Copper Near Surface, Extending Birch Skarn System to Approximately 1 Kilometre of Drilled Strike

    Hole BR26-007 at the 100%-owned Birch Copper-Gold Project, 65 kilometres northeast of Burwash Landing, Yukon, returned 23.5 metres grading 0.48 g/t gold, 0.11% copper and 1.47 g/t silver from 39.5 metres, including 1.3 m of 4.05 g/t gold, plus 0.8 m of 12.1 g/t gold from 261.0 metres. Drilled roughly 200 metres east of BR25-003, it extends drilled near-surface skarn strike to about 1 kilometre. Th

    Drill results
  2. Sep 15, 2026

    Yukon Metals Identifies New IP Targets 2 km South of Birch Skarn Discovery

    An induced polarization survey at the 100%-owned Birch Project in western Yukon identified chargeability anomalies about 2 kilometres south of known skarn mineralization, coinciding with a mapped intrusive body, magnetic high and elevated molybdenum-in-soil geochemistry. The survey, completed by Aurora Geosciences in June 2026, covered 12.7 line-kilometres across four north-south lines spaced abou

    Drill results
  3. Jun 11, 2026

    Yukon Metals Closes C$13 Million Financing

    A private placement closed for aggregate gross proceeds of approximately C$13 million, consisting of 6,885,964 flow-through units at C$0.57 and 18,050,000 units at C$0.50, each with one common share and half a warrant exercisable at C$0.75 until June 11, 2028. Net proceeds from the unit sale will fund a drilling campaign on the AZ and Birch properties in Yukon plus working capital. Insiders acquir

    Financing
  4. Jun 8, 2026

    Yukon Metals Files Technical Report for the Birch Project, Yukon

    An independent NI 43-101 technical report on the Birch Property, southwest Yukon, with an effective date of January 19, 2026, has been filed on SEDAR+, supporting technical information previously disclosed on December 8, 2025, with no material differences. The 7,000-hectare, 100%-owned copper-gold project saw a 1,685-metre, six-hole HQ diamond drill program in 2025, including hole BR25-003 with 47

    Study results
  5. Jun 1, 2026

    Yukon Metals Breaks Ground on 5,000-Metre Drill Program at AZ and Birch

    Drilling has started on a fully funded 5,000-metre program at the AZ and Birch copper-gold properties in Yukon, Canada, with first core produced at AZ on May 28, 2026. About 2,000 metres of diamond drilling is planned at AZ and 3,000 metres at Birch, alongside 3D induced polarization geophysics now underway at AZ, drone aeromagnetic surveying, surface geochemical sampling and alteration mapping. D

    Drill results
  6. May 28, 2026

    Yukon Metals Announces Upsize of Previously Announced Private Placement to C$12M

    A previously announced best efforts private placement has been upsized to aggregate gross proceeds of up to C$12 million, comprising flow-through units at C$0.57 for up to C$3,000,000 and units at C$0.50 for up to C$9,000,000, each with one common share and one-half warrant exercisable at C$0.75 for two years. Agents, co-led by ATB Cormark and Canaccord Genuity, hold an option for an additional C$

    Financing
  7. May 27, 2026

    Yukon Metals Announces C$10M Private Placement

    A best efforts private placement for aggregate gross proceeds of up to C$10 million has been agreed with ATB Cormark Capital Markets and Canaccord Genuity Corp. as co-lead agents, comprising flow-through units at C$0.57 for up to C$2,500,000 and units at C$0.50 for up to C$7,500,000, each with one common share and one-half warrant exercisable at C$0.75 for two years. Net proceeds from the unit sal

    Financing
  8. May 12, 2026

    Yukon Metals Expands Porphyry Portfolio With New Northern BC Property Near Yukon Border

    A 100% interest in the KLM Property in northern British Columbia near the Yukon border has been acquired, comprising 8 mineral claim groups covering approximately 11,761 hectares. The claims were staked on the Company's behalf under a grubstake arrangement with an arm's length third party and later transferred to the Company. Planned work includes a compilation of available data followed by reconn

    Acquisition
  9. Apr 27, 2026

    Yukon Metals Options Copper-Gold Project from Renowned Yukon Prospector Ryan Burke, Solidifying Position in Emergent Birch District

    An option agreement with Yukon geologist and prospector Ryan Burke grants Yukon Metals the right to acquire a 100% interest in the Sumo copper-gold property, 75 quartz claims totalling about 1,875 hectares located roughly 10 km east of the Company's Birch Project in southwestern Yukon. Terms total $395,000 in cash, 1,500,000 shares and $3,600,000 in work expenditures through April 13, 2031, with B

    Acquisition
  10. Dec 8, 2025

    14 G/T Au Within 47m of Gold-Bearing Skarn from 26m Depth in 300m Step-Out at Birch Cu-Au Project

    Hole BR25-003, collared 300 metres northeast of Hole 1 at the 100%-owned Birch Copper-Gold Project in Yukon, returned 47.4 m of 0.43 g/t Au from 26.6 m, including 1.0 m of 14.35 g/t Au from 71.0 m, plus 33.8 m of 0.19 g/t Au from 278.7 m. Hole BR25-006 returned 0.6 m of 1.22% Cu and 40.1 g/t Ag from 84.5 m. Prospecting 2 km south returned up to 16 g/t Au, 1,825 g/t Ag and 0.43% Cu.

    Drill results
  11. Nov 20, 2025

    Drilling Expands Near-Surface Copper-Gold Mineralization at the Birch Project

    Assays from two further holes at the 100%-owned Birch copper-gold project, 65 km northeast of Burwash Landing, Yukon, extended skarn mineralization 500 m laterally. BR25-002 returned 10.1 m of 0.21% Cu (0.30% CuEq) from 58.6 m, including 1.8 m of 1.12% Cu (1.51% CuEq), while BR25-004 cut 16.0 m of 0.20% Cu (0.28% CuEq), including 1.0 m of 0.89% Cu (1.13% CuEq). The 2025 program totalled 1,685 m in

    Drill results
  12. Oct 15, 2025

    First Drill Hole Confirms High-Grade Copper Skarn Mineralization at the Birch Project

    The first hole of the 2025 drill program at the 100%-owned Birch copper-gold project, 65 km northeast of Burwash Landing, Yukon, returned 21.2 m of 0.30% Cu (0.41% CuEq) from 138.8 m, including 2.50% Cu, 0.55 g/t Au and 18.5 g/t Ag (3.20% CuEq) over 0.6 m and 2.70% Cu, 0.55 g/t Au and 24.1 g/t Ag (3.45% CuEq) over 1.0 m. Prospecting 2 km south returned rock samples up to 16.0 g/t Au, 1,825 g/t Ag

    Drill results
  13. Sep 3, 2025

    Multiple Mineralized Skarn Horizons Intersected At The Birch Copper-Gold Project

    Drill results

Related

Other Yukon Metals Corp. projects

  • AZ Copper-Gold Project · Copper · Canada
  • Expo · Canada
  • Fairway · Copper · Canada
  • Nut · Canada
  • Risby · Canada
  • Star River · Lead · Canada
  • Talbot · Canada
Yukon Metals Corp. profile →Yukon Metals Corp. news →Reading an NI 43-101 →