Key facts
| Company | Pacific Empire Minerals Corp. (TSXV: PEMC) |
|---|---|
| Commodity | Copper |
| Location | British Columbia, Canada |
| Stage | Early exploration |
News releases24 on file
Pacific Empire Reports Final Results from DD25-TRI-001, Confirming 240 Metres Grading 0.93% CuEq
Final assays for diamond drill hole DD25-TRI-001 at the Trident copper-gold project in north-central British Columbia returned 240.0 m grading 0.93% CuEq from 9.0 m, including 183.0 m at 1.13% CuEq previously reported, with mineralization continuing from 192.0 m to 249.0 m; three further zones between 249.0 m and the 503 m end of hole averaged 0.1-0.3% CuEq over 5-10 m. Pacific Empire has also com
Drill resultsPacific Empire Intersects 183.0 Metres of 1.23% CuEq Starting at 9.0 Metres, Including 71.5 Metres of 1.80% CuEq at Trident A Zone, British Columbia
Hole DD25-TRI-001 at the A Zone of the Trident copper-gold project in north-central British Columbia returned 183.0 metres grading 1.23% CuEq (0.772% Cu, 0.51 g/t Au, 3.4 g/t Ag) from 9.0 to 192.0 metres, including 71.5 metres at 1.80% CuEq from 21.0 metres and 1.25 metres at 11.01% CuEq from 59.0 metres. The results cover only the upper portion of the hole; assays for the remainder and for five o
Drill resultsPacific Empire Reports Strong Market Interest and Completion of First Hole at Trident Gold-Enriched Copper Project
The first diamond drill hole (DD25TRI001) at the 100%-owned Trident copper-gold project in north-central British Columbia was completed to 503 metres, with visible sulphides and copper mineralization observed in portions of the hole, correlating with hornblende-feldspar porphyry intrusive units. Core is being prepared for shipment to ALS Laboratories in North Vancouver for geochemical analysis. Ho
NewsPacific Empire Closes Second Tranche of Private Placement and Announces Arrival of Omineca Drilling at Trident
The second and final tranche of a non-brokered private placement closed for gross proceeds of C$140,702, bringing the total raised to C$1,526,991.95, through 22,999,770 Hard Dollar Units at C$0.035 and 18,050,000 Flow-Through Units at C$0.04, with finder's fees of C$56,611.94 cash and 1,539,984 warrants. Omineca Drilling Ltd. has arrived at the Trident Copper-Gold Project in north-central British
FinancingPacific Empire Announces Closing of First Tranche of Financing, Mobilization of Crews to Trident, and Grant of Options
The first tranche of a non-brokered private placement closed for gross proceeds of C$1,386,289.95, with 21,122,570 Hard Dollar Units at C$0.035 and 16,175,000 Flow-Through Units at C$0.04 issued; finders' fees of C$48,862.80 cash and 1,329,830 finder warrants were paid. Field crews have mobilized to the Trident copper-gold-silver project in north-central British Columbia, with the fully permitted
FinancingPacific Empire Announces Private Placement
A non-brokered private placement of up to 15,000,000 units at C$0.035 for up to C$525,000 and up to 15,000,000 flow-through units at C$0.04 for up to C$600,000 is planned, each unit including one warrant exercisable at C$0.05 (hard dollar) or C$0.06 (flow-through) for two years. Closing is expected on or around October 10, 2025, subject to TSX Venture Exchange approval. Proceeds will fund a five-h
FinancingPacific Empire Announces Oversubscription of Private Placement and CFO Appointment
A previously announced non-brokered private placement dated September 17, 2025 has been increased from up to C$1,125,000 to up to 23,000,000 Hard Dollar Units and 18,000,000 Flow-Through Units for gross proceeds of up to C$1,525,000, with Hard Dollar Units at C$0.035 (warrant at C$0.05 for two years) and Flow-Through Units at C$0.04 (warrant at C$0.06 for two years). Proceeds will fund the permitt
FinancingPacific Empire Outlines High-Priority Drill Targets for 2025 at Trident Copper-Gold Project
A five-hole, approximately 2,500-metre diamond drill program (about 500 m per hole) is planned at the Trident copper-gold property in north-central British Columbia, with drilling scheduled to begin in September 2025. The plan includes one porphyry confirmation hole at the historical A Zone, two porphyry discovery holes and two breccia discovery holes north of a creek, an area never drilled despit
Drill resultsPacific Empire Retains Omineca Drilling for September Diamond Drill Program at Trident Copper-Gold Property
Omineca Drilling Ltd. has been retained to complete a roughly 2,500-metre diamond drill program at the 100%-owned Trident copper-gold property in north-central British Columbia, with drilling scheduled to start in September 2025. An excavator has been mobilized to clear and re-establish existing access roads, and a multi-year Mines Act permit authorizes surface drilling from 20 permitted drill sit
Drill resultsPacific Empire Receives 3-Year Permit to Drill High-Priority Trident Copper-Gold Targets
A multi-year Mines Act Permit (MX-100000345) has been issued by British Columbia's Ministry of Mining and Critical Minerals for the 100%-owned Trident property in north-central BC, valid until September 30, 2028. It authorizes surface diamond drilling from 20 permitted drill sites, camp and staging area construction, exploration access and road work, and fuel storage. Pacific Empire plans its inau
CorporatePacific Empire Reports Re-Assay Results up to 1.57m @ 0.93% Cu & 1.06 g/t Au, Updates Exploration Plan and Launches LiDAR Survey at Trident Copper-Gold Project
Re-assay of quarter core from historical drillhole 2008-01 at the Trident copper-gold property in north-central British Columbia returned 1.57 metres grading 0.93% Cu and 1.06 g/t Au (20.43–22.00 m), plus 0.48 g/t Au and 0.45% Cu over 12.57 metres and 0.58 g/t Au and 0.42% Cu over 16.0 metres. Eagle Mapping has been engaged for a high-resolution LiDAR survey to finalize drill pad locations for the
Drill resultsPacific Empire Announces Closing of $300,000 Non-Brokered Private Placement of Units
A non-brokered private placement announced July 21, 2025 has closed, with 15,000,000 units issued at $0.02 for gross proceeds of $300,000; each unit comprises one common share and one warrant exercisable at $0.05 for 24 months. Finder's fees went to Haywood Securities ($7,000 cash, 350,000 warrants), Research Capital ($490, 24,500) and Ventum Financial ($1,960, 98,000), with directors and officers
FinancingPacific Empire Arranges $300,000 Non-Brokered Private Placement
A non-brokered private placement of up to 15,000,000 units at C$0.02 per unit for gross proceeds of up to C$300,000 is planned, with each unit including one common share and one warrant exercisable at C$0.05 for 24 months. Proceeds will fund general working capital, exploration at the Trident copper-gold project in British Columbia, and marketing. Haywood Securities Inc. will receive a 7% finder's
FinancingPacific Empire Outlines 2025 Exploration Plans and Permitting for Trident
An initial 3–5 hole diamond drill program is planned for 2025 at the Trident copper-gold property in north-central British Columbia, with holes to depths of approximately 500 to 600 metres targeting the area north of the historic A-Zone. A multi-year exploration permit application covering 20 diamond drill holes, geophysical surveys and additional road construction has been submitted to the Inspec
CorporatePacific Empire Presents Final Results of Drill Target Generation at Trident
Drill targets and a diamond drilling strategy have been finalized at the Trident copper-gold property, located 50 km west of Centerra Gold's Mt. Milligan Mine in British Columbia. The program proposes an initial fence of 3-5 drill holes running south to north across the target area, plus one hole testing a potential high-grade breccia pipe. Updated targeting indicates regional stratigraphy dips ab
Drill resultsPacific Empire Assays to 2.95 g/t Gold & 0.65% Copper from Outcrop at Trident
Rock chip and historical drill core sampling at the Trident copper-gold property in north-central British Columbia returned 2.95 g/t gold and 0.65% copper from outcrop at Campbell's Trench, located 1,000 metres northwest of the A Zone. Historical hole DDH2007-01 assayed 0.98% copper and 0.38 g/t gold over 10.6 metres, including 1.53% copper and 0.62 g/t gold over 2.4 metres, while DDH2007-04 retur
Drill resultsPacific Empire Announces Appointment of Mr. Andrew Lee to the Board of Directors
Andrew Lee has been appointed to the Board of Directors of Pacific Empire Minerals Corp., effective immediately. Lee is Director of Finance at Wheaton Precious Metals Corp. and previously held analytical positions at BHP Group Limited in Singapore, with over 15 years of experience in mining finance. Pacific Empire is a copper-gold explorer with a 22,541-hectare land position in north-central Briti
ManagementPacific Empire Announces Closing of Oversubscribed Non-Brokered Private Placement Financing
A non-brokered private placement of 14,450,000 units at $0.05 per unit closed for gross proceeds of $722,500, with each unit comprising one common share and one warrant exercisable at $0.08 for 36 months from closing. Proceeds are for exploration at the Trident copper-gold-silver porphyry project in British Columbia and general working purposes. Finder's fees of C$26,075 and 521,500 finder's warra
FinancingPacific Empire Announces Upsizing of Private Placement Financing
A previously announced non-brokered private placement has been increased from C$500,000 to C$722,500 due to excess demand, comprising up to 14,450,000 units at C$0.05 per unit. Each unit includes one common share and one warrant exercisable at C$0.08 for 36 months. Proceeds will fund exploration at the Trident copper-gold-silver porphyry project in British Columbia and general working purposes, wi
FinancingPacific Empire Announces Fully Subscribed Private Placement Financing
A fully subscribed, non-brokered private placement of 10,000,000 units at $0.05 per unit for gross proceeds of $500,000 has been arranged, with each unit comprising one common share and one warrant exercisable at $0.08 for 36 months from closing. Proceeds will fund exploration at the Trident copper-gold-silver porphyry project and general working purposes. Closing is expected on or around April 30
FinancingPacific Empire Presenting at Metals Investor Forum in Toronto and Provides Update on Airborne MobileMT™ Survey at Trident
An airborne MobileMT™ survey is planned at the Trident copper-gold-silver property in north-central British Columbia, to be initiated as soon as possible after the PDAC conference held in Toronto March 3-6, 2024. CEO Brad Peters will present at the Metals Investor Forum in Toronto, held March 1-2 at the Delta Hotels Toronto, on March 2 at 10:00 am EST. The Company also granted 5,000,000 incentive
CorporatePacific Empire Closes First Tranche of Private Placement Financing
The first tranche of a non-brokered private placement announced December 19, 2023 has closed, with 9,000,000 common shares issued at $0.01 and 10,999,999 flow-through shares at $0.015 for aggregate gross proceeds of approximately $255,000. Flow-through proceeds will fund exploration at the Trident copper-gold-silver project in north-central British Columbia, with share proceeds for general corpora
FinancingPacific Empire Announces Appointment of Mr. Chris Tucker to the Board of Directors
Chris Tucker has been appointed to the board of directors of Pacific Empire Minerals, effective immediately. Tucker holds a BSc (Environment) from Simon Fraser University and a Master of Applied Science (Mining Engineering) from the University of British Columbia, with over 10 years of mining industry experience in project finance, risk management and ESG strategy and reporting. The company is tar
ManagementPacific Empire Provides Corporate and Exploration Update
A 100% interest has been acquired in the Trident copper-gold porphyry project in British Columbia, covering 6,618 hectares, subject to a 2% NSR, with PAC credits used to maintain claims in good standing until 2027; historical A Zone drilling included 0.84% Cu over 45.7 metres and 0.70% Cu over 51.8 metres. An airborne Mobile Magneto Telluric survey is planned northeast of the A Zone. Exploration a
Corporate