Key facts
| Company | Resouro Strategic Metals (TSXV: RSM) |
|---|---|
| Location | Brazil |
| Stage | Resource definition |
Mineral resource estimates
6 reported estimates, newest first. Categories are as disclosed by Resouro Strategic Metals; inferred material carries the lowest confidence and cannot support a reserve.
| Category | Tonnes | Effective |
|---|---|---|
| MeasuredNI 43-101 | 30.0 Mt | Aug 19, 2026 |
| MeasuredNI 43-101 | 340.0 Mt | Aug 19, 2026 |
| IndicatedNI 43-101 | 74.0 Mt | Aug 19, 2026 |
| IndicatedNI 43-101 | 930.0 Mt | Aug 19, 2026 |
| InferredNI 43-101 | 470.0 Mt | Aug 19, 2026 |
| InferredNI 43-101 | 33.0 Mt | Aug 19, 2026 |
How the categories differ: Inferred vs Indicated vs Measured. Compare reports over time with the Resource Growth Tracker.
News releases27 on file
Completes Final Tranche of Private Placement
The final tranche of Resouro Strategic Metals' non-brokered private placement closed with the issuance of 2,560,000 common shares at $0.25 per share for gross proceeds of $640,000. Including the first tranche, which closed August 6, 2026 in Canada (August 7, 2026 in Australia), the company issued 10,000,000 shares at $0.25 for aggregate gross proceeds of $2,500,000, with a $4,500 cash finders' fee
FinancingProposed issue of securities - RAU
A placement of 10,000,000 common stock shares at CAD 0.25 per security (AUD 0.253525 equivalent) is proposed, with an issue date of 7 August 2026. The shares will be issued without security holder approval under the company's 15% placement capacity, subject to standard TSX Venture Exchange approvals estimated by 14 August 2026, with a cash finders fee of $4,500. Proceeds will advance the environme
FinancingCompletes T1 of Upsized Private Placement Raising $2.5m
A first closing of a non-brokered private placement issued 7,440,000 common shares at $0.25 per share for gross proceeds of $1,860,000, with a $4,500 cash finders' fee paid. The placement was upsized from 8,000,000 shares for $2,000,000 to 10,000,000 shares at $0.25 for aggregate gross proceeds of $2,500,000, subject to TSX Venture Exchange acceptance, with a second closing expected shortly. Proce
FinancingResouro files technical report for Tiros project
An independent NI 43-101 technical report dated July 29, 2026 and effective July 10, 2026 has been filed for the Tiros Titanium and Rare Earths Project in Minas Gerais, Brazil, prepared by a team led by Norda Stelo Inc. The report supports the previously announced PEA, which outlines a 500,000 tonne per annum starter operation over a 20-year mine life with after-tax NPV (8%) of US$714.9 million, a
Study resultsPrivate Placement to raise up to C$2M
A non-brokered private placement of up to 8,000,000 common shares at C$0.25 per share will raise gross proceeds of up to C$2,000,000. Proceeds will fund scoping of a pre-feasibility study and further metallurgical testwork on titanium and rare earth recoveries at the Tiros project in Minas Gerais, Brazil, and general working capital, following the June 15, 2026 PEA. Shares carry a four-month resal
FinancingManagement Discussion & Analysis
NPV of US$715 million post-tax at an 8% discount rate and a post-tax IRR of 44.2% over an initial 20-year mine life were reported in the NI 43-101 technical report filed July 29, 2026 supporting the Tiros Rare Earths and Titanium Project PEA in Minas Gerais, Brazil, based on a 500,000 tpa operation processing 9.5 Mt of high-grade material with initial capex of US$191.2 million. A non-brokered priv
CorporateA Robust PEA for Tiros
Study resultsAnnual Report to shareholders
The FY26 annual report for the year ended 31 March 2026 reports a total comprehensive loss of $4,035,643 (2025: $6,288,396), cash of $1,091,663, an accumulated deficit attributable to shareholders of $19,727,294, and a working capital surplus of $735,688, with the auditor noting a material uncertainty regarding going concern. The year included an updated Measured and Indicated resource of 1.4 bill
CorporateManagement's Discussion & Analysis
Preliminary Economic Assessment results for the Tiros rare earths and titanium project in Minas Gerais, Brazil show an after-tax NPV of US$714.9 million at an 8% discount rate and an after-tax IRR of 44.2%, based on 500,000 tpa throughput over a 20-year mine life, 9.5 Mt ROM feed at 26.3% TiO2 and 10,832 ppm TREO, a 2.7 strip ratio, initial capital of US$191 million and operating costs of about US
CorporatePEA Supplementary Information
Supplementary ASX Listing Rule 5.16 disclosure has been provided for the Tiros Rare Earths and Titanium Project PEA in Minas Gerais, Brazil, released 14/15 June 2026, covering mining, metallurgical, infrastructure and economic modifying factors behind the 500,000tpa ROM production target and 20-year mine life. Of the high-grade ROM basis, 51.6% is Measured, 47.6% Indicated and 0.8% Inferred, with
Study resultsResouro Tiros PEA Presentation
A preliminary economic assessment for the Tiros titanium–rare earth project in Minas Gerais, Brazil outlines a post-tax NPV₈ of US$714.9M and IRR of 44.2% (pre-tax US$1,138.8M and 62.7%), with US$191.1M gross upfront capital, 1.9-year post-tax payback and US$1,673.9M post-tax cash flow over a 20-year mine life. The 500,000 tpa starter operation uses about 0.7% of the 1.4Bt M&I resource grading 12%
Study resultsResouro sees $1B rare earth, titanium project in Brazil
A preliminary economic assessment for the Tiros rare earths and titanium project in Minas Gerais, Brazil outlines a post-tax net present value of $714.9 million (C$1 billion) at an 8% discount rate and a 44% post-tax internal rate of return. The 500,000 tonne per annum starter operation would produce about 90,000 tonnes of TiO2 concentrate and 3,636 tonnes of TREO products annually over 20 years,
NewsResouro’s Tiros PEA highlights billion-dollar rare earths and titanium potential
A preliminary economic assessment for the Tiros rare earths and titanium project in Minas Gerais, Brazil returned a post-tax NPV8 of US$714.9 million (~A$1.02 billion) and post-tax IRR of 44.2% (pre-tax 62.7%), with initial capital of US$159.6 million (A$227.8 million). The starter operation would treat 500,000tpa, producing about 90,000t of TiO2 concentrate and 3,636t of TREO products annually ov
Study resultsPEA milestone for Tiros Project
PEA completed for the Tiros Rare Earths and Titanium Project in Minas Gerais, Brazil, showing an after-tax NPV at an 8% discount rate of US$714.9 million and an after-tax IRR of 44.2%, with 1.9-year payback. The starter operation would process 500,000 tonnes per annum over 20 years, treating 9.5Mt at 26.3% TiO2 and 10,832 ppm TREO at a 2.7 strip ratio, with initial capital of about US$191 million
Study resultsASX:RAU completes PEA for Tiros Project in Brazil
Study resultsMetallurgical Testwork & PEA Update - Tiros Project
Metallurgical testwork on the Tiros Titanium and Rare Earths Project in Minas Gerais, Brazil returned 88.8% to 95.2% stage extraction of TREO and 71.2% to 94.2% TiO2 stage recovery from a fine (<20 micron) sulphuric acid flowsheet, and a 76.8% TiO2 concentrate grade at 39% stage recovery from the coarse (>75 micron) flowsheet. Preliminary sulphuric acid consumption ranged from 700kg/t to 1,320kg/t
Study resultsTitanium and Rare Earths in Brazil Presentation
An investor presentation on the Tiros titanium and rare earths project in Minas Gerais, Brazil, covering a 1.9 billion tonne mineral resource estimate, including Measured and Indicated resources of 1.4Bt at 12% TiO₂ and 4,000ppm TREO, with 103Mt at 23% TiO₂ and 9,100ppm TREO in the high-grade domain, and 165Mt total contained TiO₂. PEA metallurgical testwork and flowsheet are complete, with a Prel
CorporateResouro Selects Flowsheet for Tiros PEA
Study results