Key facts
| Company | Silver47 (TSXV: AGA) |
|---|---|
| Commodity | Gold |
| Location | Nevada, USA |
| Stage | Early exploration |
About Hughes Project
Opportunity is waitingin Nevada
News releases13 on file
Silver47 Auger Program Confirms 2.74 Moz Silver Equivalent Tailings Resource at Surface, Hughes Project, Nevada
All 21 auger holes drilled into the Belmont mine tailings at the Hughes Project in Tonopah, Nevada returned silver-gold mineralization from surface to the base of the tailings, over an average thickness of 3.3 m, with the program totalling approximately 68.6 metres and hole depths of 1.05 to 5.75 metres. The tailings host an inferred resource of 1.8 Moz silver and 11 koz gold (44 g/t Ag, 0.3 g/t A
Resource updateSilver47 Launches Drilling on the Eastern Extension of the Tonopah High Grade Silver District, Hughes Project, Nevada
Drilling has started on the eastern extension of the Tonopah Mining District at the Hughes Project near Tonopah, Nevada, with a core rig advancing an existing pre-collared hole and an RC rig expected shortly. The 2026 campaign comprises a minimum 7,000 metres of combined RC and diamond drilling at the Ruby, Sapphire and Emerald targets, 1.3–4+ km east of the historic district edge, beginning with
Drill resultsSilver47 Unveils Plans for Aggressive Drill Program Across the Eastern Extension of the Prolific Tonopah Mining District, Hughes Project, Nevada
A minimum 7,000 metres of combined RC and diamond drilling is planned for March at the Hughes Project near Tonopah, Nevada, targeting the Ruby, Sapphire and Emerald discoveries 1.3–4+ km east of the historic Tonopah district edge. Drilling begins with at least four angled holes on 200 m step-outs along a north-south fence at Ruby, following prior results including 1,450 g/t AgEq (8.41 g/t Au, 813
Drill results