Key facts
| Company | Revival Gold (TSXV: RVG) |
|---|---|
| Commodity | Gold |
| Location | Idaho, USA |
| Stage | Early exploration |
News releases7 on file
Revival Gold Intersects 8.4 g/T gold over 6.2 Meters and 8.5 g/T gold over 3.4 Meters Supporting Overall Continuity of Mineralization at the Beartrack-Arnett Joss Target
Wedge hole drilling at the Joss target of the Beartrack-Arnett Project in Idaho returned 2.2 g/T gold over 49.5 meters drilled width in BT26-254DW, including 8.4 g/T over 6.2 meters, and in BT26-255DW 7.9 g/T over 2.2 meters plus 4.3 g/T over 21.6 meters, including 8.5 g/T over 3.4 meters. True widths are estimated at 40-55% of drilled width. Revival Gold contracted EngComp Engineering for undergr
Drill resultsRevival Gold Intersects 3.43 g/t Gold Over 131.7 Meters, Including 6.6 g/t Gold Over 42.5 Meters at Beartrack-Arnett in Idaho
Drill hole BT26-255D at the Joss area of the Beartrack-Arnett Project in Idaho returned 3.43 g/t gold over 131.7 meters drilled width from 543 meters downhole, including 6.56 g/t gold over 42.5 meters and 11.58 g/t gold over 12.1 meters; true widths are estimated at 40-50% of drilled width. All five primary and three wedge holes in the 5,500-meter program intersected the Panther Creek Shear Zone,
Drill resultsDrilling Intersects 14.9 g/t Gold Over 5.9 Meters and Extends Depth of Mineralization by 240 Meters at Joss
Drilling in the Joss area of the Beartrack-Arnett Project in Idaho returned 2.37 g/t gold over 147.2 meters drilled width in hole BT26-254D, including 14.9 g/t over 5.9 meters and 9.3 g/t over 4.7 meters, extending drilled mineralization about 240 meters deeper to roughly 850 meters below surface. Other holes returned 4.0 g/t over 6.8 meters (BT26-253D) and 4.5 g/t over 4.1 meters (BT26-251DA). Th
Drill resultsRevival Gold Expands Drilling Program After Intersecting 6.4 g/T Gold Over 19 Meters at Beartrack-Arnett
Drilling at the Joss area of the Beartrack-Arnett Project in Idaho returned 5.4 g/T gold over 32.6 meters drilled width at 568 meters downhole in hole BT26-252D, including 6.4 g/T over 19.1 meters and 8.0 g/T over 4.3 meters, in a 100-meter step-out to the south. Two further holes, BT26-251DA and BT26-253D, intercepted the target shear zone with assays pending. The drill program has been extended
Drill resultsRevival Gold Targets Underground Resource Growth With Drilling At Beartrack-Arnett Gold Project In Idaho
2,300 meters of core drilling have been completed of a planned 3,900-meter winter program at the Beartrack-Arnett Gold Project in Idaho, which began in October 2025. At the Sharkey target, hole BT25-247D intersected alteration and shearing near the bedrock contact but returned no significant multi-element geochemical results. Two rigs are now drilling at Joss to test extensions of the underground
Drill resultsRevival Gold Provides Exploration Drilling Update on Beartrack-Arnett Gold Project in Idaho
1,150 meters of core have been completed in four exploration holes at the Beartrack-Arnett Gold Project in Idaho, targeting the greenfield Sharkey area, a two-kilometer step-out, and extensions of high-grade Joss mineralization. Target stratigraphy was intercepted in one of three Sharkey holes, with hole BT25-247D encountering alteration and shearing near the bedrock-overburden contact; assays are
Drill resultsRevival Gold Intersects 3.0 g/T Gold Over 21.1 Meters At Mercur And Mobilizes Fourth Rig To Beartrack-Arnett
Drilling at the Mercur Gold Project in Utah returned 3.02 g/t gold over 21.1 meters in RMC25-011, 0.78 g/t gold over 70.1 meters plus 3.93 g/t over 3 meters in RM25-099, and 0.77 g/t over 38.1 meters in RM25-093, from 16 additional holes. As of October 26, 2025, 70 holes and 7,500 meters of the planned 13,000-meter program are complete, supporting a planned 2026 pre-feasibility study. A fourth rig
Drill results