Key facts
| Company | Torr Metals Inc. (TSXV: TMET) |
|---|---|
| Commodity | Copper |
| Location | Canada |
| Stage | Early exploration |
News releases13 on file
Torr Metals Intersects Extensive Hydrothermal Brecciation and Multi-Stage Veining at Bertha North, Advancing Cu-Au Porphyry ModelResults
The first hole (26-KO-01) of a fully funded Phase II program of up to 6,000 m at the Bertha North target, part of the 332 km² Kolos Copper-Gold Project in southern British Columbia, confirmed a hydrothermal system to approximately 563 m depth, including a roughly 142 m core-length interval from 318.5 m to 460.9 m of multi-stage quartz-carbonate veining, crackle to hydrothermal brecciation and seri
Drill resultsTorr Metals Commences Fully Funded 6,000Metre Drill Program Beginning at Bertha North, Following New Geophysical Targeting and 2.4% Copper Surface Sample ResultsDrilling
Drill site preparations are underway at the Bertha North copper-gold porphyry target ahead of contractor mobilization for a fully funded Phase II 2026 program of up to 6,000 metres at the 332 km² Kolos Copper-Gold Project, about 35 km southwest of Kamloops, British Columbia, with at least 1,500 metres allocated to Bertha North. Spring 2026 rock grab sampling returned up to 2.4% copper and 9.4 g/t
Drill resultsTorr Metals - Completes Surface Sampling at Kolos and Initiates Geophysical Surveys in Preparation for Drilling
Surface geochemical sampling has been completed across the Bertha–Bertha North and Kova target areas on the 332 km² Kolos Copper-Gold Project, about 35 km southwest of Kamloops, British Columbia, with 521 soil samples and 50 rock grab samples collected and assays pending. High-resolution drone magnetic surveys are underway, followed by induced polarization surveys, ahead of a fully funded Phase II
Drill resultsTorr Metals Targets Potential Porphyry Source at Bertha Zone and Expands District-Scale Cu-Au Corridor with New Kova Target
Field crews have mobilized to the 332 km² Kolos Copper-Gold Project in southern British Columbia for reconnaissance sampling, drone magnetics and IP surveys ahead of Phase II drilling planned for Q2 2026, which will initially target a moderate to high-resistivity intrusive body with coincident chargeability at depth at Bertha North. Phase I drilling intersected 68 intervals of native copper minera
Drill resultsTorr Metals Significantly Expands Sonic Copper–Gold Soil Anomaly to ~8 km², Reinforcing Kolos as a Multi-Target Porphyry District
A 1,572-sample soil geochemical program completed in late 2025 at the undrilled Sonic Zone, part of the 275 km² Kolos Copper-Gold Project in south-central British Columbia, returned up to 3,090 ppm copper and 420 ppb gold and expanded the anomalous soil footprint from 4.5 km² to approximately 8.0 km², outlining a corridor 4.6 km long and up to 1.7 km wide. Drill permitting is underway, with an IP
Drill resultsTorr Metals Advances Bertha into a Multi-Porphyry Cu–Au District with Second Permitted Porphyry Target
A new porphyry-style copper-gold target, Bertha North (formerly Target 2), has been outlined about 1.7 km northwest of the Bertha Zone at the 332 km² Kolos Copper-Gold Project in south-central British Columbia. The target is defined by moderate-to-high resistivity (approximately 300–930 ohm-m) coincident with a strong magnetic anomaly, overlapping an ~800 m by 500 m historical soil anomaly with va
CorporateTorr Metals Confirms Large, Structurally Controlled Copper–Gold System at Bertha with Strong Vectoring Toward Untested Northeast Target
Phase I drilling of 2,733 metres at the Bertha Target on the 332 km² Kolos Copper-Gold Project in south-central British Columbia delineated a structurally controlled hydrothermal copper-gold-silver system spanning more than 350 m of strike and 580 m vertical depth, with 68 native copper occurrences, 21 above 500 ppm Cu and 10 above 1,000 ppm Cu. Hole 25-KO-07 returned 0.24 g/t Au over 3 metres (33
Drill resultsTorr Metals Completes Initial Drilling at Bertha, Outlining a Large-Scale Supergene System in Southern British Columbia
2,733 metres of diamond drilling in 8 holes has been completed at the Bertha Target within the 332 km² Kolos Copper-Gold Project in south-central British Columbia, testing about 400 metres of strike length and nearly 900 metres of down-plunge extent across an IP chargeability anomaly, with the supergene system confirmed to greater than 580 metres vertical depth. Assays for all eight holes are pend
Drill resultsTorr Metals Announces Drill Update: Advancing Toward 2,800 m and Expanding Strike Potential at Bertha
Approximately 2,100 metres of diamond drilling in 7 holes has been completed at the Bertha Target within the 332 km² Kolos Copper-Gold Project in south-central British Columbia, with the program to be extended to 2,800 metres. Holes tested an IP chargeability anomaly and a picrite contact to depths greater than 400 vertical metres; assays for holes 25-KO-01 to 25-KO-06 are pending and a step-out o
Drill resultsTorr Metals Highlights Historical Soil Anomalies Linked to Sonic Porphyry Target, Including up to 4,510 ppm Cu and 700 ppb Au
Compilation of historical soil and rock sampling on the adjoining 57 km² Bertha Property and ground north of the Sonic Zone at the 275 km² Kolos Copper-Gold Project in south-central British Columbia outlined a 4.5 km² Cu-Au soil anomaly over 3.7 km strike by 1.2 km width, with peaks of 4,510 ppm Cu and 590 ppb Au. A >4.0 km Au-Ag-Cu epithermal corridor returned up to 700 ppb Au in soil and 2.24 g/
Drill resultsTorr Metals Secures Drill Permit for the Kirby, Lodi, and Clapperton Targets at the Kolos Copper-Gold Project
A five-year Multi-Year, Area-Based (MYAB) drill permit has been received covering the Kirby, Lodi and Clapperton targets within the 100%-owned 275 km² portion of the 332 km² Kolos Copper-Gold Project in south-central British Columbia. The three undrilled targets form a 7 km-long porphyry trend, with geophysical anomalies of 2,500 m and 1,850 m strike length at Kirby and Lodi, soil values up to 1,1
CorporateTorr Metals Outlines Historical Copper-Gold-Silver Soil Anomalies with 3 Kilometer Strike-Length at the Bertha Zone
Compilation of 2,090 historical soil and 27 rock grab samples at the Bertha, Bertha South, JHC and Rhyolite occurrences on the Kolos Copper-Gold Project in southern-central British Columbia outlined copper-silver-gold anomalies, with a 1 km northeast-southwest trend in the ~2 km² Bertha Zone plus a secondary northwest-southeast trend extending a further 2 km. Historical rock grabs returned up to 8
Drill resultsTorr Metals Adds Multiple New Exploration Targets with 75% Expansion of Kolos Copper-Gold Project
Staking has expanded the 100%-owned Kolos Copper-Gold Project in British Columbia by 75%, from approximately 140 km² to 240 km², with new claims focused northward along an extension of the north-trending Fanta Fault. The claims cover the historical Ram soil anomaly, defined by a >200 ppm Cu footprint measuring 900 m by 500 m, and the newly discovered Vik Zone, where a 2023 rock grab sample returne
Drill results