Key facts
| Company | Dryden Gold (TSXV: DRY) |
|---|---|
| Commodity | Gold |
| Location | Canada |
| Stage | Early exploration |
About Gold Rock Project
Dryden Gold is utilizing mapping and oriented drill core to piece together the history of structural controls at Gold Rock. The structural history is important because it created fluid pathways which would have brought in the gold mineralization. Understanding the pattern of these structural traps and their orientations is key for our geology team to predict and target high-grade gold mineralization.
News releases16 on file
Dryden Gold Continues to Expand the Gold Rock Gold System
Dryden Gold reports additional assay results from its ongoing drill campaign at the Gold Rock Gold System in the Dryden District of Northwestern Ontario. Highlights include hole DGR-078 returning 8.57 g/t gold over 1.10 meters and hole DGR-087 returning 3.23 g/t gold over 1.60 meters, with 12.62 g/t gold over 1.85 meters, including 54.40 g/t over 0.40 meters, from the Elora Hanging Wall area.
NewsDryden Gold Intersects 7.88 g/t gold over 12.70 meters at Gold Rock
Drill hole DGR-058 at the Gold Rock target in the Dryden District, Northwestern Ontario returned 7.88 g/t gold over 12.70 meters, including 46.05 g/t gold over 1.90 meters, at about 65 meters true depth, confirming high-grade continuity over 350 meters of strike on the Elora structure. DGR-075 returned 1.35 g/t over 12.0 meters on BM1 at about 300 meters depth, DGR-079 returned 9.91 g/t over 1.45
Drill resultsDryden Gold Reports on Deeper Drilling at Spyglass with 9.40 g/t gold over 4.60 meters at a True Depth of 330 Meters Provides Marketing Update
Four drill holes tested down-plunge extensions of the Spyglass and Buccaneer high-grade zones at Gold Rock in the Dryden District, Northwestern Ontario, with DGR-073 returning 9.40 g/t gold over 4.60 metres, including 78.40 g/t gold over 0.38 metres, and 0.95 g/t gold over 5.55 metres, including 7.70 g/t gold over 0.55 metres, at Buccaneer. Spyglass was extended from about 190 to 330 metres vertic
Drill resultsDryden Gold Closes Option Agreement for Lost Lake Property
TSX Venture Exchange approval has been received and the initial tranche closed on an option agreement dated June 29, 2026 with arm's length party Orebot Inc. to acquire a 100% interest in the Lost Lake Property, 122 tenured mineral claims in the Gold Rock Mining Camp, Northwestern Ontario. Dryden Gold paid $10,000 cash and issued 25,000 shares at a deemed price of $0.21. Full ownership requires $4
AcquisitionDryden Gold Discovers Two New Gold Bearing Structures Further Expanding the Mineralized Footprint at Gold Rock
Drilling at the Gold Rock project in the Dryden District of Northwestern Ontario identified two new gold-bearing structures: Elora 2, between the Elora and Big Master systems at 250-500 metres true depth, and a structure at the Paymaster target. DGR-060C returned 3.38 g/t gold over 4.30 metres, including 19.90 g/t over 0.50 metres, while DGR-065 returned 2.12 g/t over 1.02 metres, 500 metres along
Drill resultsDryden Gold Receives Drill Permit to Test High-Priority Mud Lake Discovery Target
An exploration drill permit has been received for the Mud Lake target in the Gold Rock Camp, Dryden District, Northwestern Ontario, also covering the Wamsley target. Surface samples from a high-grade shear zone at Mud Lake assayed 93.00 g/t gold. Two drills are currently operating at Gold Rock, with one rig to be deployed to Mud Lake in early August.
Drill resultsDryden Gold Acquires Additional Property in the Gold Rock Camp
An option agreement has been signed to acquire 100% of the 123-claim Lost Lake Property from arm's length Orebot Inc., located in the Gold Rock Mining Camp in Ontario's Dryden District and surrounded by Dryden Gold's existing claims. Terms are cash payments of $10,000 on signing, $40,000 at year one and $50,000 at year two, plus 125,000 common shares, and a 3% NSR to Orebot, half buyable for $1,00
AcquisitionDryden Gold intersects 3.24 g/t gold over 14.77 meters including 1.35 meters of 29.55 g/t gold at Gold Rock
Drilling at the Big Master Gold System at Gold Rock in Ontario returned 3.24 g/t gold over 14.77 meters, including 29.55 g/t over 1.35 meters, in hole DGR-051 at Sparrow 88.00 meters from surface, and 1.02 g/t over 13.50 meters, including 8.88 g/t over 1.00 meter, in DGR-052; hole DGR-057 expanded the Treasure and Barrelman zones. The 2026 drill program has been increased to 45,000 meters, with a
Drill resultsDryden Gold Delivers More High-grade Results at Jubilee and Expands to Two-Drill Strategy at Gold Rock
In-fill drilling at Jubilee on the Elora Gold System returned 2.92 g/t gold over 14.50 metres in DGR-054, including 6.79 g/t over 5.00 metres, with 28.80 g/t over 0.40 metres and 15.30 g/t over 0.60 metres, while DGR-056 returned 2.48 g/t over 12.65 metres including 33.50 g/t over 0.50 metres, and DGR-053 cut 0.73 g/t over 9.58 metres. Drilling tested 150 to 200 metres depth. A second drill rig wi
Drill resultsDryden Gold Corp. Announces Equity Financing
A proposed non-brokered flow-through equity financing of up to 17,951,996 shares for maximum aggregate proceeds of up to $7,500,000, with FT Shares priced at $0.41 and charity flow-through shares at $0.4521. Finders' fees of up to 6% of gross proceeds may be payable, and securities carry a four month and one day hold period. Proceeds will fund expanded drilling at Hyndman and Gold Rock plus summer
FinancingDryden Gold Discovers Three New High-Grade Zones with 4.25 Meters Grading 32.87 g/t Gold including 0.50 Meters of 252.00 g/t gold at Gold Rock
Three new gold zones were intersected on the Big Master Gold System at Gold Rock in the Dryden District of Northwestern Ontario. Hole DGR-048 cut 4.25 meters grading 32.87 g/t gold, including 0.50 meters of 252.00 g/t, on BM1 (Sparrow), and DGR-049 cut 4.00 meters of 6.51 g/t, including 1.50 meters of 16.10 g/t, on BM2 (Ruby), both 300-meter step-outs northeast of Treasure and Barrelman. Hole DRG-
Drill resultsDryden Gold Intersects 15 Gold Mineralized Structures in Single Hole at Gold Rock
Drill hole DGR-031 (Gap Hole 2) at the Gold Rock target in the Dryden District of Northwestern Ontario intersected 15 gold mineralized structures across 600 meters width, including Treasure at 460 meters true depth grading 2.64 g/t gold over 2.50 meters, with 10.80 g/t gold over 0.50 meters, and 77.90 g/t gold over 0.50 meters in a second footwall zone at Pearl. Hole DGR-036 returned 5.03 g/t gold
Drill resultsDryden Gold Announces Final Warrant Exercises
Effective December 29, 2025, 19,708,569 of the 38,489,148 (51%) warrants issued in connection with the Company's December 28, 2023 TSX Venture Exchange listing were exercised at $0.30 for gross proceeds of $5,912,570; the warrants expired December 28, 2025. Dryden Gold now has 213,134,590 common shares outstanding and $9,750,000 cash on hand. EuroPac Gold Fund holds control and direction over 5.79
FinancingDryden Gold Expands the Gold Rock Camp with High-Grade Discoveries at Mud Lake
A first-pass three-hole drill program at the Mud Lake target, 2 kilometres northeast of the main Gold Rock target area along the Manitou-Dinorwic Deformation Zone in northwestern Ontario, returned 43.10 g/t gold over 0.50 metres from 76.50m to 77.00m depth. Surface sampling on a shear zone returned 93.00 g/t gold, and mapping indicates a potential 1-kilometre mineralized footprint. Dryden Gold wil
Drill resultsDryden Gold More Than Triples the Scale of the Elora Gold System with its 2025 Exploration Program
Final results from the 2025 drill program at the Elora Gold System, part of the Gold Rock Target Area near Dryden, Northern Ontario, expanded the Elora Shear zone to over 800 metres along strike, with most drill holes still above the 200-metre vertical level. Holes DGR-25-029 and DGR-25-030A returned the widest intervals to date on the HW2 and HW3 hanging wall structures, and DGR-25-028 the widest
Drill resultsDryden Gold Advances District-Scale Discoveries with the Completion of its 2025 Exploration Campaign
The 2025 exploration campaign at the Dryden Gold District in Northwestern Ontario is complete, comprising 15,000 metres of drilling and summer fieldwork, with assays pending from 19 holes targeting the Gold Rock and Mud Lake areas. Channel sampling at Hyndman led to a drill decision for 2026, and an initial three-hole program at Sherridon intersected gold mineralization. A regional till and soil p
Drill results