Key facts
| Company | Goldgroup Mining Inc. (TSXV: GORO) |
|---|---|
| Commodity | Gold |
| Location | Mexico |
| Stage | Early exploration |
News releases6 on file
Goldgroup Reports Strong First Results from 26,000 Metre San Francisco Drill Program
Assay results from the first six drillholes of a 26,000 metre diamond drilling program at the formerly producing San Francisco Gold Project in Sonora, Mexico included GGD-174 with 23.4 metres at 1.71 g/t gold (including 6.4 metres at 4.84 g/t), GGD-178 with 16.8 metres at 4.36 g/t gold (including 10.9 metres at 6.34 g/t), and GGD-179 with 51.0 metres at 0.58 g/t gold. The drilling is budgeted at a
Drill resultsGoldgroup Advances San Francisco Toward Potential Production Restart
A 26,053-metre diamond drilling program has commenced at the 100%-owned San Francisco gold project in Sonora, Mexico, with completion expected in the fourth quarter of 2026, alongside a technical study evaluating a restart of mining and processing. The April 30, 2026 resource estimate totals 48.3 Mt at 0.37 g/t gold (582,000 oz) measured, 56.8 Mt at 0.35 g/t (645,000 oz) indicated, and 17.3 Mt at
Corporate