JUNIOR MININGINTELLIGENCE
CompaniesNewsProspectors EXLive NowMedia
JUNIOR MININGINTELLIGENCE
CompaniesNewsProspectors EXLive NowMedia
  1. Home
  2. /
  3. Companies
  4. /
  5. Gold X2 Mining
  6. /
  7. Moss Gold Project

Moss Gold Project

Gold · Canada

Moss Gold Project is a gold project in Canada, at the early exploration stage, held by Gold X2 Mining (TSXV: AUXX).

21 news releases are filed under it here.

← Gold X2 Mining profileCompany website ↗

Key facts

CompanyGold X2 Mining (TSXV: AUXX)
CommodityGold
LocationCanada
StageEarly exploration

About Moss Gold Project

Active 50,000-meter drill program will focus on:resource expansion, grade control drilling, and an district exploration program across 23kms of mineralized under-explored structures

News releases21 on file

  1. Sep 8, 2026

    Gold X2 Discovers Extension to the Span Prospect with Intersection of 40.4m of 2.05 g/t Au from 343.6m Indicating the Potential NE Extension of the Moss Deposit

    Phase one drilling at the Span Prospect, about 2 km northeast of the Moss Gold Deposit's eastern edge in Northwest Ontario, returned 40.4m of 2.05 g/t Au from 343.6m in MSD-26-404, including 24.05m of 3.17 g/t Au from 345.95m. The 11-hole, 4,581m program also intersected a parallel shear in a narrow diorite with 5.0m of 5.34 g/t Au from 161.0m (including 2.0m of 12.7 g/t Au) and 11.0m of 1.22 g/t

    Drill results
  2. Aug 10, 2026

    Gold X2 Intersects 26.65m of 4.22 g/t Au Including 10.9m of 9.02 g/t in Infill Drilling at Moss Main

    Drill results
  3. Jun 2, 2026

    Gold X2 Intersects 86.0m of 1.37 g/t Au from 314.0m at QES During Infill Drilling at the Moss Gold Project

    Drill results
  4. May 13, 2026

    Gold X2 Intersects 60.7m of 1.51 g/t Au from 47.0m at QES as Part of the Moss Gold Project Infill Drilling Program

    Infill drilling at the shallow QES Zone of the Moss Gold Project in Northwest Ontario returned 60.7m of 1.51 g/t Au from 47.0m in MQD-26-343, including 22.2m of 2.42 g/t Au from 64.0m, plus 27.0m of 1.70 g/t Au from 99.0m in MQD-26-336 and 22.0m of 1.71 g/t Au from 96.0m in MQD-26-344. Ten holes were drilled to upgrade near-surface Inferred resources to Indicated within the current RPEEE open pit

    Drill results
  5. Mar 13, 2026

    Gold X2 Announces Filing of NI 43-101 Technical Report for the Moss Gold Project Preliminary Economic Assessment

    An independent NI 43-101 technical report covering the Preliminary Economic Assessment for the 100%-owned Moss Gold Project in Northwest Ontario has been filed, dated March 12, 2026 with an effective date of January 26, 2026. The report was prepared by G Mining Services and is available on the company's website and SEDAR+. The 2026 updated mineral resource estimate for the Moss and East Coldstream

    Study results
  6. Mar 3, 2026

    Gold X2 Drills 117m of 1.21 g/t Au, Including 10m of 4.37g/t Au; High-Grade Zone Intersected 280m Beneath the Resource Pit Demonstrating Underground Potential at the Moss Gold Deposit

    Drilling at the Moss Gold Project in Northwest Ontario returned 117.0m of 1.21 g/t Au from 816m in hole MQD-25-326, including 19.0m of 3.33 g/t Au, 10.0m of 4.37 g/t Au and 5.0m of 7.24 g/t Au, intersected about 280m below the RPEEE pit shell; the same hole cut 23.0m of 1.01 g/t Au from 183.0m in the Superion Zone. Hole MQD-25-330 returned 28.95m of 1.18 g/t Au from 730.05m. Follow-up step-out dri

    Drill results
  7. Jan 26, 2026

    Gold X2 Mining Delivers Preliminary Economic Assessment and Updated Mineral Resource Estimate for the Moss Gold Project

    Study results
  8. Nov 7, 2025

    Gold X2 Provides an Update to the Environmental Baseline Studies at the Moss Gold Project and Issues Equity Grant

    Environmental baseline studies at the Moss Gold Project in Northwest Ontario, begun in 2021 and led by CSL Environmental & Geotechnical Ltd., were expanded in 2025 with Stage 2 archaeological, waste geochemical, fisheries, hydrogeological, seismic, hydrological (25 hydrometric stations), lidar (over 80 km2) and terrestrial biology work, with air, noise, socio-economic and closure studies to start

    Corporate
  9. Oct 16, 2025

    Gold X2 Delineates 5 Kilometer Anomalous Mineralized Trend South of the Moss Gold Deposit

    Drill results
  10. Sep 11, 2025

    Gold X2 Receives the 2025 Rising Star Award for the Moss Gold Project at the Central Canada Resource Expo

    Corporate
  11. Jun 3, 2025

    Goldshore Announces $25 Million Bought Deal Private Placement to Drive On-Going Development at the Moss Gold Deposit

    Financing
  12. Jun 3, 2025

    Goldshore Announces Upsize to Bought Deal Private Placement to $36.08M to Drive On-Going Development at the Moss Gold Deposit

    Financing
  13. Mar 3, 2025

    Goldshore Discovers Shallow New Zone at Moss Gold with 17.6m of 3.03 g/t Au Including 6.8m of 7.06 g/t Au at 60m Depth Below Surface

    Drill results
  14. Jul 24, 2024

    Goldshore Completes 2,780-Meter Summer Drilling Program at Moss Gold Project

    Drill results
  15. Jul 10, 2024

    Goldshore Engages Key Consultants to Advance the Moss Gold Project

    Management
  16. Mar 21, 2024

    Goldshore Announces Filing of Updated Technical Report for the Moss Gold Project

    Study results
  17. Feb 6, 2024

    Goldshore Announces an Indicated Mineral Resource Estimate of 1,535Koz Contained Gold at 1.23 g/t Au and an Inferred Mineral Resource Estimate of 5,198Koz Contained Gold at 1.11 g/t Au at the Moss Gold Project

    Resource update
  18. Jun 20, 2023

    Goldshore Announces Filing of Updated Technical Report for the Moss Gold Project

    Study results
  19. May 17, 2023

    Goldshore Announces Ausenco Selected as Lead Engineering Firm to Conduct the Preliminary Economic Assessment at the Moss Gold Project

    Study results
  20. May 8, 2023

    Goldshore Announces Inferred Mineral Resource Estimate of 6.00Moz Contained Gold at 1.02 g/t Au within 183.6Mt at the Moss Gold Project

    Resource update
  21. May 3, 2023

    Goldshore Announces Preliminary Metallurgy Results for the Moss Gold Project

    Study results

Related

Gold X2 Mining profile →Gold X2 Mining news →Reading an NI 43-101 →