Key facts
| Company | Alkane Resources (TSX: ALK) |
|---|---|
| Commodity | Gold |
| Location | New South Wales, Australia |
| Stage | Early exploration |
About Northern Molong Porphyry Project
Alkane’s Northern Molong Porphyry Project (NMPP) is located in Central West NSW, centred about 20km north of Wellington and about 35km east of Dubbo.
News releases6 on file
NMPP Regional Exploration Update: Potential For New Au-Cu Porphyry Deposits Demonstrated
Drilling at the Northern Molong Porphyry Project in Central New South Wales returned 65.5m grading 1.78g/t AuEq (1.22g/t Au, 0.41% Cu) from 1154.5m in BOD159 at Boda 2-3, including 2.6m at 15.1g/t AuEq (10.9g/t Au, 3.06% Cu) from 1211m, while BOD158 intersected 452.6m at 0.40g/t AuEq from 852m. At the Driell Creek prospect, DRC004 returned 130m grading 0.25g/t Au and 0.11% Cu from 174m to end of h
Drill resultsRevised Kaiser Resource Estimate Improves Confidence and Grade of Resource Base at Boda District
An updated Mineral Resource Estimate for the Kaiser Deposit at the Northern Molong Porphyry Project in central New South Wales stands at 213 Mt at 0.55g/t AuEq for 3.74Moz AuEq (0.28g/t Au, 0.20% Cu, 1.90Moz Au, 0.42Mt Cu), with 89% now Indicated and gold grade up 15% and copper up 10%. The Boda District global resource totals 796Mt at 0.58g/t AuEq for 14.7Moz AuEq (8.3Moz Au, 1.5Mt Cu). A scoping
Resource updateKaiser Resource Drilling Includes High Grades Near Surface
Infill drilling results from 12,000m of RC and diamond core drilling at the Kaiser deposit, part of the Northern Molong Porphyry Project in Central New South Wales, included 41m grading 3.05g/t AuEq (1.39g/t Au, 1.21% Cu) from 1m in KAI198, 62m at 1.31g/t AuEq from surface in KAI206, and 257m at 0.76g/t AuEq from 270m in KAI122. Drilling is complete on a 50m x 50m grid over the 2.1Moz gold and 0.5
Drill resultsKaiser Drilling Update Confirms Extensive Mineralisation
Results from a further 12,000m of the 45,000m infill drilling campaign at the Kaiser deposit, part of the Northern Molong Porphyry Project in Central New South Wales, included KAI106 with 501m grading 0.45g/t AuEq (0.19g/t Au, 0.19% Cu) from 228m, and KAI146 with 49m at 1.00g/t AuEq from 109m. Kaiser's Inferred Resource contains 2.1Moz Au and 0.5Mt Cu, with an updated estimate including an Indicat
Drill resultsBoda and Kaiser Metallurgical Testwork Delivers Strong Recoveries Based on a Simple Flowsheet
Metallurgical testwork on the Boda and Kaiser gold-copper prospects at the Northern Molong Porphyry Project in Central New South Wales has been completed, including locked cycle tests. Estimated overall recoveries are 87.4% copper and 80.9% gold for Boda, and 79.6% copper and 70.7% gold for Kaiser. The flowsheet comprises conventional crushing, grinding and flotation to produce a saleable concentr
Study resultsKaiser Infill Drilling Results, Further Exploration Scheduled
Assay results from an initial 11,000m of infill drilling at the Kaiser deposit, part of the Northern Molong Porphyry Project in Central New South Wales, included 161m at 1.02g/t AuEq (0.38g/t Au, 0.47% Cu) from 135m in KAI103, 242m at 0.55g/t AuEq from 120m in KAI109 and 110m at 0.69g/t AuEq from 101m in KAI115, including 2m at 17.1g/t AuEq. The Kaiser Inferred Resource contains 2.1Moz Au and 0.5M
Drill results