Cobrasco Project

Copper · Canada

Cobrasco Project is a copper project in Canada, at the early exploration stage, held by Andina Copper Corp (TSXV: ANDC).

9 news releases are filed under it here.

← Andina Copper Corp profileCompany website ↗

Key facts

CompanyAndina Copper Corp (TSXV: ANDC)
CommodityCopper
LocationCanada
StageEarly exploration

About Cobrasco Project

The Cobrasco Project in Colombia’s Chocó Copper Belt is a significant new copper-molybdenum porphyry discovery by Rugby Resources. The first drill hole returned up to 808m at 0.42% Cu with high-grade bornite mineralization. The project covers a 3 km² geochemical anomaly and remains open in all directions.

News releases9 on file

  1. Sep 23, 2026

    Andina Copper Intersects High-Grade, Near-Surface Copper in Step-Out Hole >

    Step-out drillhole CDH013 at the Cobrasco copper-molybdenum project in Chocó, Colombia returned 322m at 0.51% Cu, 70ppm Mo and 1.6g/t Ag from 74m, including 200m at 0.65% Cu and 84ppm Mo from 82m and 44m at 0.81% Cu and 110ppm Mo from 204m. Collared 350m northwest of Pad 3, the hole extends the drill-defined mineralized footprint to approximately 1,300m x 550-700m. CDH012 returned 12m at 0.41% Cu

    Drill results
  2. Aug 25, 2026

    Andina Copper Intersects 206m at 0.67% Cu from 32m within 400m at 0.46% Cu >

    Drillhole CDH011 at the Cobrasco copper-molybdenum porphyry project in Chocó, Colombia returned 400m @ 0.46% Cu, 60ppm Mo and 1.1g/t Ag from 32m, including 206m @ 0.67% Cu, 35ppm Mo from 32m, 40m @ 0.87% Cu from 32m and 54m @ 0.76% Cu from 184m. A further 290m @ 0.25% Cu and 93ppm Mo was intersected from 302m. Eleven holes have delineated a footprint of about 1,200m by 550–700m; a second rig is to

    Drill results
  3. Aug 11, 2026

    Andina Copper Intersects 264m at 0.63% Cu from 36m within 504m at 0.48% Cu, Further Expands Mineralized Footprint >

    Hole CDH010 at the Cobrasco porphyry copper-molybdenum discovery in Chocó, Colombia returned 504m at 0.48% Cu and 37ppm Mo from 36m, including 264m at 0.63% Cu and 35ppm Mo from 36m, plus 36m at 0.62% Cu from 486m and 84m at 0.40% Cu, 91ppm Mo from 660m; the hole ended at 844.65m. Ten drillholes totalling approximately 11,000m have defined a mineralized footprint of roughly 1,200m by 550-700m. CDH

    Drill results
  4. Jun 24, 2026

    Andina Copper Intersects 186m at 0.50% Cu from 38m, within 502m at 0.40% Cu. Extends Shallow Mineralization to the NW>

    Drillhole CDH009 at the Cobrasco Project in Chocó, Colombia returned 502m at 0.40% Cu, 73ppm Mo and 1.22g/t Ag from 38m, including 388m at 0.44% Cu, 36ppm Mo and 1.28g/t Ag from 38m and 186m at 0.50% Cu, 22ppm Mo and 1.48g/t Ag from 38m. The hole was drilled northwesterly to 954m, extending the Cobrasco Central footprint to roughly 1,200m by 550m. Assays for CDH010 and CDH011 are pending and a sec

    Drill results
  5. May 13, 2026

    Andina Copper Intersects 152m at 0.67% Cu from 54m, within 272m at 0.50% Cu>

    Drillhole CDH008 at the Cobrasco Project in Chocó, Colombia returned 272m @ 0.50% Cu, 75ppm Mo, 1.92g/t Ag from 52m, including 152m @ 0.67% Cu, 68ppm Mo, 1.90g/t Ag from 54m, to a downhole depth of 652.25m. The hole extends the Cobrasco Central Cu-Mo porphyry system to the north; the mineralized footprint now spans about 1,100m along strike and 550m laterally and remains open. CDH009 assays are pe

    Drill results
  6. Apr 14, 2026

    Andina Copper Reports 232m at 0.68% Cu, 75ppm Mo from 38m>

    Drillhole CDH006 at the Cobrasco Project in Chocó, Colombia returned 486m at 0.42% Cu, 51ppm Mo, 1.20g/t Ag, including 336m at 0.51% Cu, 53ppm Mo, 1.50g/t Ag and 232m at 0.68% Cu, 75ppm Mo, 2.0g/t Ag from 38m. The hole was collared about 400m northwest of the previous drill pads and drilled to 898.90m, with mineralization continuing to a faulted contact at 808m. Step-out holes CDH007 and CDH008 ar

    Drill results
  7. Mar 24, 2026

    Andina Copper Extension Drilling Intersects 198 m at 0.51% Cu, 78 ppm Mo within 454 m at 0.43% Cu, 66 ppm Mo>

    Hole CDH005 at the Cobrasco Project in Chocó, Colombia returned 454 m at 0.43% Cu and 66 ppm Mo, including 198 m at 0.51% Cu and 78 ppm Mo, in a step-out testing the southern extension of the system; the hole was terminated at 934 m and mineralization remains open to the south. Step-out holes CDH006 and CDH007 are complete with assays pending, and CDH008 is underway targeting the northern extensio

    Drill results
  8. Feb 17, 2026

    Andina Copper Intersects 620 m @ 0.46% Cu from 62 m, including 146 m @ 0.76% Cu>

    Drillhole CDH004 at the Cobrasco copper-molybdenum project in Chocó, Colombia returned 620 m @ 0.46% Cu from 62 m, including 146 m @ 0.76% Cu, with the 579–686 m magmatic-hydrothermal breccia interval averaging 0.75% Cu and a peak 2 m assay of 1.70% Cu; sporadic gold values reached 1.06 g/t. The hole was completed to 900.25 m. CDH005, drilled to 934.00 m to the southwest, has assays pending, and s

    Drill results
  9. Jan 22, 2026

    Andina Copper Exploration Update>

    Approximately 2,275 m of diamond drilling in three holes has been completed at the Cobrasco Central target, Chocó Department, Colombia, including the continuation of CDH003 to a final depth of 774.80 m, with assays expected shortly; wide intervals of porphyry-style copper-molybdenum mineralization were logged in all holes. Surface work at Cobrasco East returned 54 stream sediment samples with up t

    Drill results

Related

Other Andina Copper Corp projects

  • Mantau Project · Copper · Canada
  • Piuquenes Project · Copper · Canada
Andina Copper Corp profile →Andina Copper Corp news →Reading an NI 43-101 →