Key facts
| Company | Brixton Metals (TSXV: BBB) |
|---|---|
| Commodity | Gold |
| Location | Ontario, Canada |
| Stage | Early exploration |
News releases19 on file
Brixton Metals Drills 4 m of 1,975 g/t Silver within 23.50 m of 348 g/t Silver in Hole 449 at its Langis Project in Ontario
Silver assays from 28 holes at the wholly owned Langis Silver Project in the Cobalt camp, Ontario included hole LM-26-449 with 23.50 m of 348.11 g/t silver from 203.00 m, including 4.00 m of 1,974.88 g/t and 2.00 m of 3,386.25 g/t; LM-26-412 returned 6.45 m of 666.95 g/t, including 3.19 m of 1,339.39 g/t; and LM-26-442 returned 9.00 m of 221.91 g/t. A third rig has been added, targeting 9,000 m pe
Drill resultsBrixton Metals Reports Consistent Silver Grades Across All 85 Holes from Maiden Tailings Drill Program at the Langis Silver Project
All 85 sonic drill holes from the maiden tailings characterization program at the wholly owned Langis Silver Project in Ontario's Cobalt camp returned silver-mineralized tailings, with a length-weighted average of 61.7 g/t silver over 119.5 m intersected and a median hole grade of 56.0 g/t. The best hole, LT-26-051, averaged 311.7 g/t silver over 1.53 m, including 810 g/t over 0.50 m; six holes ex
Drill resultsBrixton Metals Drills 6,199 g/t Silver over 1.00 m including 0.50 m of 12,386 g/t Silver in Hole 432 at its Langis Project in Ontario
Drilling at the wholly owned Langis Silver Project in the Cobalt camp, Ontario returned 1.00 m of 6,199 g/t silver from 116.05 m in hole LM-26-432, including 0.50 m of 12,386 g/t silver. Hole LM-26-399 cut 41.00 m of 79.2 g/t silver from 208.00 m, including 4.60 m of 503 g/t, and hole LM-26-408 returned 7.00 m of 290 g/t. Results cover 33 holes; 33,858 m across 155 holes completed in 2026, with tw
Drill resultsBrixton Metals Announces Closing Of Final Tranche Of Private Placement For Aggregate Gross Proceeds Of $9.1 Million
A third and final tranche of a non-brokered private placement closed with 264,800 units issued at $0.66 per unit for gross proceeds of $174,768.00, bringing total gross proceeds across all tranches of the unit offering and the flow-through share offering to $9,131,422.02. Each unit includes one warrant exercisable at $0.90 until August 27, 2029, subject to accelerated expiry. Net proceeds will fun
FinancingBrixton Metals Announces Closing Of Second Tranche Of Its Private Placement
A second tranche of the non-brokered private placement has closed, with 650,000 units issued at $0.66 per unit for gross proceeds of $429,000, alongside a concurrent flow-through offering of 5,332,905 FT shares at $0.76 for $4,053,007.80. Total gross proceeds across the first two tranches reach $8,956,654.02. Each unit includes one warrant exercisable at $0.90 until August 25, 2029, with unit proc
FinancingBrixton Metals Announces Closing of First Tranche of Private Placement
The first tranche of a non-brokered private placement closed with the issuance of 6,779,767 units at $0.66 per unit for gross proceeds of $4,474,646.22. Each unit includes one common share and one warrant exercisable at $0.90 until August 15, 2029, subject to accelerated expiry if the share price is at or above $1.40 for ten consecutive trading days. Proceeds will fund exploration at the Langis Si
FinancingBrixton Metals Announces Non-Brokered Private Placement of up to $5 Million
A non-brokered private placement of up to 7,575,757 units at $0.66 per unit for gross proceeds of up to $5,000,000 has been launched. Each unit comprises one common share and one warrant exercisable at $0.90 for three years, subject to accelerated expiry if the shares close at or above $1.40 for ten consecutive trading days. Proceeds will fund exploration at the Langis Silver Project and general w
FinancingBrixton Metals Drills 5,015 g/t Silver over 20m in a New Brownfields Discovery Area at Its Langis Project
Hole LM-26-377 at the Shaft 6 Southeast area of the wholly owned Langis Silver Project in Cobalt, Ontario returned 20.00m of 5,015 g/t silver from 165.00m depth, including 14.00m of 7,150 g/t, 1.15m of 74,137 g/t and 0.65m of 89,125 g/t silver. Other holes returned 13.00m of 287.8 g/t and 7.00m of 275.0 g/t silver. The 2026 program has completed 24,016.90m in 105 holes, plus 261.35m in the tailing
Drill resultsBrixton Metals Commences Drilling for Maiden Tailings Mineral Resource Estimate at the Langis Silver Project
A dedicated sonic-drilling campaign has begun on the historic tailings at the wholly owned Langis Silver Project in Ontario's Cobalt camp, aiming to define a maiden Mineral Resource Estimate and advance a Recovery and Remediation Plan under Ontario's Recovery of Minerals regime effective July 1, 2025. Two additional rigs are drilling the fully funded 60,000-metre 2026 bedrock program, bringing thr
Drill resultsBrixton Metals Drills 906 g/t Silver over 4.3 m, including 1,329 g/t Silver over 1.8 m, all within 23.7 m of 206.6 g/t Silver at its Langis Project And 4.95 m of 493 g/t silver, including 1,798 g/t silver over 1.0 m
Drilling at the wholly owned Langis Silver Project in the Cobalt camp, Ontario returned 23.70 m of 206.6 g/t silver from 109.80 m in hole LM-26-342, including 4.30 m of 905.6 g/t and 1.80 m of 1,329 g/t. Hole LM-26-355 cut 4.95 m of 492.8 g/t silver from 146.10 m, including 1.00 m of 1,798 g/t, and LM-26-348 returned 2.00 m of 624.0 g/t. A total of 18,678.05 m in 90 holes has been completed in 202
Drill resultsBrixton Metals Drills 2.3 m of 1,811 g/t Silver within 27.7 m of 166.45 g/t Silver at its Langis Project
Hole LM-26-341 at the wholly owned Langis silver project in the Cobalt camp, Ontario returned 27.7 m of 166.45 g/t silver from 99.3 m, including 2.3 m of 1,811 g/t and 0.5 m of 5,580 g/t, plus 2.0 m of 700 g/t from 149.0 m. Hole LM-26-338 cut 17.5 m of 170.8 g/t silver including 1.0 m of 1,150 g/t, and LM-26-337 cut 7.5 m of 404.35 g/t. To date 14,760.65 m in 72 holes has been drilled in 2026, tow
Drill resultsBrixton Metals Drills 13.0m of 594 g/t Silver Including 0.5m of 7,900 g/t Silver at its Langis Project
Hole LM-26-350 at the Shaft 6-Southeast target of the wholly owned Langis Silver Project in Cobalt, Ontario returned 40.00m of 200.11 g/t silver, including 13.00m of 594.43 g/t silver, 2.00m of 873 g/t silver and 0.50m of 7,900 g/t silver, about 150m from the Shaft 6-South area. Other holes included LM-26-289 with 6.00m of 115.40 g/t silver. A total of 13,845 metres in 68 holes has been drilled in
Drill resultsBrixton Metals Drills 82,334 g/t Silver (2,647 Ounces Per Tonne Silver) Over 0.5m within 11.35m of 4,560 g/t Silver at its Langis Project
Drilling at the wholly owned Langis Silver Project in the Cobalt camp, Ontario returned 82,334 g/t silver over 0.5m from 115.25m in hole LM-26-290, within 11.35m grading 4,559.92 g/t silver from 112.0m. Hole LM-26-292 cut 18.6m of 155.4 g/t silver from 106.4m, including 1.2m of 1,166 g/t, and LM-26-291 returned 8.6m of 96.7 g/t silver from 158.0m. The 2026 program has completed 8,282 metres in 43
Drill resultsBrixton Metals Reports Record Silver Intercepts of 18.2m of 3,638 g/t Ag Including 6.8m of 9,421 g/t Ag at its Langis Project in Ontario
Drilling at the wholly owned Langis Silver Project in the Cobalt camp, Ontario returned 18.2 m of 3,637.99 g/t Ag from 113.8 m in hole LM-26-305, including 6.8 m of 9,421.03 g/t Ag from 121.2 m, within a broader 77 m interval averaging 862.23 g/t Ag. Hole LM-26-307 returned 13.6 m of 367.01 g/t Ag and LM-26-302 returned 9.0 m of 406.91 g/t Ag. A total of 7,510.25 m in 39 holes has been completed i
Drill resultsBrixton Metals Drills 5,791 g/t Silver Over 1.75m within 14.45m of 721.4 g/t Silver And 15,522 g/t Silver Over 0.5m within 14.35m of 708.7 g/t at its Langis Silver Project
Drilling at the wholly owned Langis Silver Project in Ontario, about 500 kilometres north of Toronto, returned 14.35 m of 708.7 g/t silver from 116.00 m in hole LM-26-296, including 0.5 m of 15,522 g/t, and 14.45 m of 721.4 g/t silver from 109.55 m in hole LM-26-301, including 1.75 m of 5,791 g/t. Approximately 6,226 metres in 32 holes have been completed in 2026, with results from 9 holes reporte
Drill resultsBrixton Metals Commences Drilling At Its Langis Silver Project
Drilling has begun at the wholly owned Langis Silver Project in Ontario's Cobalt Camp, about 500 km north of Toronto. The fully funded 2026 phase one campaign comprises approximately 15,000 metres of shallow near-surface drilling to expand and infill known high-grade silver zones and test new targets along structural trends, with the goal of supporting a potential maiden resource estimate. Prior B
Drill results