Key facts
| Company | McFarlane Lake Mining (CSE: MLM) |
|---|---|
| Commodity | Gold |
| Stage | Early exploration |
News releases6 on file
Continued Positive Results From Exploration Drilling, McFarlane Intersects Second Wide Zone of Gold Mineralization at McMillan Returning 51.6 Meters (M) of 2.0 Grams per Tonne (GPT) Gold, Containing a Higher-Grade Zone of 5.5 GPT Gold Over 7.55 M That Included 16.1 GPT Gold Over 1.8 M
Drill hole MLMM-25-04 at the past-producing McMillan Gold Mine, 70 km west of Sudbury, Ontario, returned 2.0 gpt gold over 51.65 m, including 3.1 gpt over 21.15 m, with higher-grade intervals of 5.5 gpt over 7.55 m (including 16.1 gpt over 1.6 m and 56.3 gpt over 0.3 m), 4.8 gpt over 4.4 m and 5.5 gpt over 2.8 m. The hole was drilled as a 50 m step-out about 300 m below surface, testing a borehole
Drill resultsMcFarlane Intersects 5.6 GPT Gold Over 13 Metres Including 10.7 GPT Gold Over 5 Metres on Its McMillan Property Property
Drilling at the 100%-owned past-producing McMillan Gold Mine, 70 km west of Sudbury, Ontario, returned 2.7 gpt gold over 31.35 metres in hole MLMM-08-05W1, including 5.6 gpt over 13 metres and 10.7 gpt over 5 metres. Follow-up hole MLMM-24-04, drilled about 50 metres below and 20 metres west, cut a 54-metre quartz-sulphide stockwork zone from 336 to 390 metres core length, roughly 300 metres below
Drill resultsMcFarlane Lake Mining Presenting at the Red Cloud Fall Mining Conference
McFarlane Lake Mining will attend the Red Cloud Securities Fall Mining Conference in Toronto on October 16 and 17. CEO Mark Trevisiol is scheduled to present exploration plans for the past-producing McMillan Gold Mine on October 17 at 4:00 p.m. at the Sheraton Centre Hotel. The company will also hold one-on-one investor meetings at its conference booth.
CorporateMcFarlane Lake Receives Exploration Permit on Its McMillan Gold Mine Property
An exploration permit has been granted by the Ontario Ministry of Mines for the McMillan Mine property, located approximately 70 kilometres east of Sudbury, Ontario, allowing line-cutting, geophysical surveys and diamond drilling. McFarlane Lake is planning an initial 3,000-metre diamond drilling program, with field preparations beginning in September and drilling expected to start in November and
CorporateMcFarlane Samples 87.4 Grams per Tonne(GPT) Gold Containing 0.59% Copper at Its Past Producing McMillan Gold Mine; Provides Exploration Update on Upcoming Drill Program
A field sample interpreted as historic ore from the past-producing McMillan Gold Mine, 70 km west of Sudbury, Ontario, returned 87.4 gpt gold, 0.59% copper and anomalous cobalt and nickel. A fully funded 3,000 metre drill program is planned to begin in Q4 2024, pending an exploration permit, to test historic intercepts including 27.9 metres of 6.4 gpt gold with 8.1 metres of 15.7 gpt gold. Regiona
Drill resultsMcFarlane Completes Geophysical Survey at Its Past Producing McMillan Gold Mine.
An induced polarization geophysical survey covering 1.4 square kilometres around the past-producing McMillan Gold Mine, 70 km west of Sudbury, Ontario, has been completed by contractor Dan Patrie Exploration Ltd., with results pending. The property is traced by the 10 km east-west House Lake Fault. Historic intercepts include 7.2 g/t gold over 21.3 metres in hole MM-05-13 and 11.2 g/t over 4.7 met
Drill results