JUNIOR MININGINTELLIGENCE
CompaniesNewsProspectors EXLive NowMedia
JUNIOR MININGINTELLIGENCE
CompaniesNewsProspectors EXLive NowMedia
  1. Home
  2. /
  3. Companies
  4. /
  5. Thunder Gold Corp.
  6. /
  7. Tower Mountain (Au)

Tower Mountain (Au)

Gold · Canada

Tower Mountain (Au) is a gold project in Canada, at the early exploration stage, held by Thunder Gold Corp. (TSXV: TGOL).

12 news releases are filed under it here.

← Thunder Gold Corp. profileCompany website ↗

Key facts

CompanyThunder Gold Corp. (TSXV: TGOL)
CommodityGold
LocationCanada
StageEarly exploration

About Tower Mountain (Au)

Tower Mountain is an emerging district-scale gold system located 50 km west of Thunder Bay, Ontario, in one of Canada’s most established mining jurisdictions. The 100%-owned, 2,500-hectare property hosts a large intrusion-related gold system with exceptional continuity, consistent grades, and strong expansion potential.

News releases12 on file

  1. Nov 3, 2026

    Thunder Gold Intersects Continuous Gold Mineralization Averaging 0.456 g/t Au Over 451.5 Metres at Tower Mountain, Ontario

    Drill results
  2. Oct 26, 2026

    Thunder Gold Intersects Continuous Gold Mineralization Averaging 0.407 g/t Au Over 336.0 Metres and 0.527 g/t Au Over 290.1 Metres at Tower Mountain, Ontario

    Thunder Gold Corp. reports infill drilling at its Tower Mountain Property, 40 kilometres west of Thunder Bay, Ontario, with hole TM26-223 intersecting 0.527 g/t Au over 290.1 metres and hole TM25-188/188X intersecting 0.407 g/t Au over 336.0 metres. Both intervals are within the Inferred component of the 2026 Mineral Resource Estimate, and the company says all thirteen infill holes to date are rec

    Drill results
  3. Oct 19, 2026

    Thunder Gold Intersects Continuous Gold Mineralization Averaging 1.178 g/t Au Over 102.0 Metres at Tower Mountain, Ontario

    Drill hole TM26-221 at the Bench Target on the Tower Mountain Property, 40 km west of Thunder Bay, Ontario, returned 1.178 g/t Au over 102.0 metres and ended in mineralization averaging 0.785 g/t Au over 12.0 metres outside the current optimized pit limit; TM26-220, 200 metres above, returned 0.551 g/t Au over 75.0 metres. Ten infill holes to date averaged roughly 10% above 2026 MRE model-predicte

    Drill results
  4. Oct 13, 2026

    Thunder Gold Reports 411.0 metres Averaging 0.514 g/t Au and Awards MagnetoTellurics Airborne Survey of Tower Mountain

    Infill hole TM25-186X extended TM25-186 by 252.0 metres at the Bench Target on the Tower Mountain Property, 40 km west of Thunder Bay, Ontario, for a combined intersection of 411.0 metres averaging 0.514 g/t Au, with mineralization continuous to the end of hole at 501.0 metres, including 19.5 metres averaging 0.523 g/t Au. Expert Geophysics Surveys Inc. has been contracted for a 285 line-kilometre

    Drill results
  5. Oct 5, 2026

    Thunder Gold Intersects 298.5 metres Averaging 0.409 g/t Au (including 36.0 metres averaging 0.715 g/t Au) at Tower Mountain

    Drill hole TM26-218 at the Bench Target on the Tower Mountain Property, 40 km west of Thunder Bay, Ontario, returned 298.5 metres averaging 0.409 g/t Au from 100.5 metres downhole, ending in 36.0 metres averaging 0.715 g/t Au. Exploration hole TM26-215 intersected 7.5 metres averaging 0.737 g/t Au near the end of hole. Reconciliation of seven infill holes indicates drilled grades averaging roughly

    Drill results
  6. Sep 28, 2026

    Thunder Gold Intersects 232.5 metres Averaging 0.450 g/t Au (including 33.0 metres averaging 1.383 g/t Au) at Tower Mountain

    Infill drill hole TM26-217 at the Bench Target on the Tower Mountain Property, 40 kilometres west of Thunder Bay, Ontario, returned 232.5 metres averaging 0.450 g/t Au from 360.0 metres, including 33.0 metres averaging 1.383 g/t Au. The hole is 200 metres vertically below TM23-137 (42.4 metres averaging 1.106 g/t Au). Six infill holes completed to date have returned an aggregate 2,040 metres avera

    Drill results
  7. Sep 22, 2026

    Thunder Gold Intersects 409.5 metres Averaging 0.307 g/t Au (including 111.0 metres averaging 0.514 g/t Au) at Tower Mountain

    Infill drilling at the Bench Target on the Tower Mountain Property, 40 kilometres west of Thunder Bay, Ontario, returned 496.0 metres averaging 0.271 g/t Au from surface to end-of-hole in TM26-214, including 111.0 metres averaging 0.514 g/t Au. TM26-212 intersected 592.5 metres averaging 0.144 g/t Au, with mineralization from 376.5 metres to end-of-hole at 600 metres, ending in 84.0 metres averagi

    Drill results
  8. Sep 17, 2026

    Thunder Gold Reports 121.5 metres Averaging 0.376 g/t Au in New Target Located 200 metres East of Current Resource Pit Optimization Limit.

    Drilling at the Bench Target on the Tower Mountain Property, 40 km west of Thunder Bay, Ontario, returned 121.5 metres averaging 0.376 g/t Au in hole TM26-205, located 200 metres east of the 2026 MRE pit limit and about 400 metres from surface; the same hole cut 158.6 metres averaging 0.545 g/t Au near surface, including 54.0 metres at 1.088 g/t Au. TM26-213 intersected 589.0 metres averaging 0.19

    Drill results
  9. Sep 14, 2026

    Thunder Gold Reports 404.5 metres of Continuous Gold Mineralization Averaging 0.453 g/t Au in Extension of TM23-137

    Drilling at the Bench Target on the Tower Mountain Property, 40 km west of Thunder Bay, Ontario, returned 404.5 metres of continuous gold mineralization averaging 0.453 g/t Au in hole TM23-137X, an extension of 2023 hole TM23-137. TM23-137X included 294.0 metres averaging 0.418 g/t Au from collar to end of hole and ended in 27.0 metres averaging 0.830 g/t Au, including 15.0 metres averaging 1.128

    Drill results
  10. Aug 17, 2026

    Thunder Gold Intersects 228.5 metres of Continuous Gold Mineralization Averaging 0.557 g/t Au in TM21-107X, an Extension of TM21-107

    Drill hole TM21-107X, an extension of TM21-107 at the Bench Target on the Tower Mountain Property 40 kilometres west of Thunder Bay, Ontario, returned 228.5 metres averaging 0.557 g/t Au, with the combined TM21-107/107X intersecting 340.4 metres averaging 0.530 g/t Au. The hole lies within the 2026 MRE optimized pit limit and targeted inferred resources for conversion to indicated. True width cann

    Drill results
  11. Aug 11, 2026

    Thunder Gold Intersects 661.5 metres of Continuous Gold Mineralization Averaging 0.554 g/t Au

    Drill hole TM26-210 at the Bench Target on the Tower Mountain Property, 40 km west of Thunder Bay, Ontario, returned 661.5 metres averaging 0.554 g/t Au, including 24.0 metres averaging 1.815 g/t Au. About 516.0 metres of the interval, averaging 0.503 g/t Au, lies inside the 2026 Mineral Resource Estimate pit shell, with 145.5 metres averaging 0.731 g/t Au immediately below it. The hole ended in m

    Drill results
  12. Jul 16, 2026

    Thunder Gold Reports 1.793 g/t Au over 45.0 metres at UV Target, Advancing Tower Mountain Resource Growth Strategy

    Drilling at the UV Target on the Tower Mountain property, 40 km west of Thunder Bay, Ontario, returned 142.0 metres averaging 0.668 g/t Au in hole TM26-204, including 45.0 metres at 1.793 g/t Au and 1.5 metres at 44.100 g/t Au. Other results included 238.5 metres at 0.259 g/t Au in TM26-200, 39.0 metres at 0.320 g/t Au in TM26-198 and 13.5 metres at 0.612 g/t Au in TM26-203, from six holes totalli

    Drill results

Related

Thunder Gold Corp. profile →Thunder Gold Corp. news →Reading an NI 43-101 →