JUNIOR MININGINTELLIGENCE
CompaniesNewsProspectors EXLive NowMedia
JUNIOR MININGINTELLIGENCE
CompaniesNewsProspectors EXLive NowMedia
  1. Home
  2. /
  3. Companies
  4. /
  5. Volta Metals
  6. /
  7. Springer Rare Earth Project

Springer Rare Earth Project

Rare earths · Canada

Springer Rare Earth Project is a rare earths project in Canada, at the early exploration stage, held by Volta Metals (CSE: VLTA).

20 news releases are filed under it here.

← Volta Metals profileCompany website ↗

Key facts

CompanyVolta Metals (CSE: VLTA)
CommodityRare earths
LocationCanada
StageEarly exploration

About Springer Rare Earth Project

It is one of the 21 North American projects with a defined Mineral Resource Estimate (MRE) and holds significant upside potential for Gallium, a critical metal for the defense and semiconductor sectors. Springer deposit ranks 12th in terms of TREO grade profile, and 15th in tonnes with further upside potential, excluding gallium.

News releases20 on file

  1. Oct 19, 2026

    VoltaMore Than Doubles Springer Indicated Resource to 122.4 Mt, Ranks Among North America’s Five Largest Rare Earth Deposits by M&I Tonnage, and Delivers First Gallium Estimate

    122.4 Mt Indicated at 0.59% TREO, up 116% from 56.6 Mt in February 2026, plus 197.5 Mt Inferred at 0.53% TREO, was estimated by SLR for the Springer rare earth and gallium deposit near Sturgeon Falls, Ontario, effective September 30, 2026. The Indicated high-grade core grew 140% to 27.6 Mt at 1.00% TREO. A first supplementary gallium estimate averages 36 g/t Ga, about 4,427 t in situ Indicated. A

    Resource update
  2. Oct 6, 2026

    Volta Completes 2026 Drill Program with Wide Rare Earth and Gallium Intervals Across the Springer Rare Earth-Gallium Deposit and Identifies Niobium as a Potential Additional Critical Metal

    All assays from the 13-hole, 5,445 m winter drill program at the Springer rare earth deposit near Sturgeon Falls, Ontario are reported, including 688.4 m grading 0.81% TREO and 68.1 g/t Ga2O3 from 4.6 m in SL26-35, 324.0 m of 1.00% TREO and 70.1 g/t Ga2O3 in SL26-29, and 2.95 m of 7.54% TREO and 282.7 g/t Ga2O3. Gallium occurred over the full assayed length of every hole. A compilation of 39 holes

    Drill results
  3. Oct 1, 2026

    Volta Drills 165.3m of 1.36% Total Rare Earth Oxides (“TREO”) and 81.3 g/t Gallium Oxide at Springer,

    Drilling at the Springer rare earth deposit near Sturgeon Falls, Ontario returned 165.3m of 1.36% TREO and 81.3 g/t Ga₂O₃ in hole SL26-29, including 2.95m at 7.54% TREO and 282.7 g/t Ga₂O₃, the program's highest-grade intercept; the hole averaged 0.85% TREO over 412.5m and ended in mineralization more than 400m below surface, 190m beyond the conceptual pit. SL26-30 returned 109.5m at 1.33% TREO an

    Drill results
  4. Sep 15, 2026

    Volta Drills 7.37% Rare Earth Oxide and 252.7 g/t Gallium Oxide over 1.5m at Springer

    Drill hole SL26-28 at the Springer rare earth–gallium deposit near Sturgeon Falls, Ontario returned 417.0m grading 0.57% TREO and 56.7 g/t gallium oxide, including 214.5m at 0.80% TREO and 63.8 g/t Ga2O3, and 1.5m at 7.37% TREO and 252.7 g/t Ga2O3. SL26-34 returned 1.65m of 1.15% TREO and 66.8 g/t Ga2O3 from 7.5m, while SL26-36 averaged 0.36% TREO over 296.0m. Assays are pending for the remainder

    Drill results
  5. Sep 15, 2026

    Volta Drills 7.37% Rare Earth Oxide and 252.7 g/t Gallium Oxide over 1.5m at Springer

    An amended and restated offering document dated April 8, 2026 sets out a listed issuer financing of units at $0.17 per unit, with a minimum of 11,764,706 units for $2,000,000.02 and a maximum of 14,705,882 units for $2,499,999.94, closing on or about April 16, 2026. Each unit includes one common share and half a warrant exercisable at $0.25 for 24 months. Proceeds are earmarked for Springer REE an

    Drill results
  6. Sep 3, 2026

    Volta Extends Springer Rare Earth and Gallium System 275 metres Below Modelled Open Pit, Highlighted by 5.00% TREO in Drill Hole SL26-37

    Drill holes SL26-37 and SL26-39 at the Springer rare earth and gallium deposit near Sturgeon Falls, Ontario returned mineralization over their entire assayed lengths: SL26-37 averaged 0.41% TREO and 35.0 g/t Ga₂O₃ over 414 m, including 0.65 m at 5.00% TREO and 74.1 g/t Ga₂O₃, extending the system about 275 m below the conceptual open pit; SL26-39 averaged 0.42% TREO and 38.4 g/t Ga₂O₃ over 417.5 m

    Drill results
  7. Aug 19, 2026

    Volta Metals Announces Closing of Acquisition of Claims Contiguous to the Springer REE Project

    The acquisition of a 100% interest in three contiguous unpatented mining claims (Nos. 722235, 722236 and 722237) adjoining the Springer Rare Earth Element deposit near Sturgeon Falls, Ontario, has closed, consolidating the ground around the deposit into a single contiguous block. Volta Metals issued 600,000 common shares as consideration, subject to a four month and one day hold period from issuan

    Acquisition
  8. Aug 11, 2026

    Volta Consolidates Springer Land Package into a Single Contiguous Block, Securing Clear Path to 100% Ownership of Springer REE-Gallium Deposit

    A definitive agreement has been signed to acquire a 100% interest in three contiguous unpatented mining claims (722235, 722236, 722237) adjoining the Springer REE-Gallium deposit near Sturgeon Falls, Ontario, for 600,000 common shares, with the vendor retaining a 2% NSR royalty, half of which Volta may buy back for $500,000. The undrilled claims lie along the eastward extension of mineralization b

    Acquisition
  9. Aug 10, 2026

    Volta Confirms Gallium Across Full Length of All Three Springer Drill Holes; Highlights Include 236.6 g/t Ga₂O₃ and 6.41% TREO

    Assay results from three holes at the Springer rare earth deposit near Sturgeon Falls, Ontario returned gallium over the full assayed length of each hole, including 51.8 g/t Ga₂O₃ over 399.0 m in SL26-31 (3.0–402.0 m) and a peak 0.5 m interval of 236.6 g/t Ga₂O₃ and 6.41% TREO (67.1–67.6 m). SL26-32 returned 1.22% TREO and 47.0 g/t Ga₂O₃ over 53.9 m (372.1–426.0 m), ending in mineralization. Galli

    Drill results
  10. Jul 30, 2026

    Volta Metals Announces Closing of Acquisition of Remaining 20% Interest of its Flagship Springer Rare Earth and Gallium Deposit and Contiguous Claim

    Assay results from the 2026 winter drill program at the Springer rare earth and gallium deposit near Sturgeon Falls, Ontario returned 414 m at 0.41% TREO and 35.0 g/t Ga2O3 in SL26-37, including 5.00% TREO and 74.1 g/t Ga2O3 over 0.65 m, extending mineralization about 275 m below the conceptual open pit; SL26-39 returned 417.5 m at 0.42% TREO and 38.4 g/t Ga2O3. Assays are pending for 6 of 13 hole

    Acquisition
  11. Jul 30, 2026

    Volta Metals Announces Closing of Acquisition of Remaining 20% Interest of its Flagship Springer Rare Earth and Gallium Deposit and Contiguous Claim

    Closing of the acquisition of the remaining 20% interest in the Springer Rare Earth Element and Gallium deposit in Sturgeon Falls, Ontario, was completed under a July 21, 2026 purchase agreement with RZJ Capital Management, LLC, for $1,000,000 cash and 10,000,000 common shares, of which 5,000,000 were issued on closing. Volta also closed the acquisition of a mineral claim contiguous with the Prope

    Acquisition
  12. Jul 27, 2026

    Volta Metals Announces DTC Eligibility, Allowing for Electronic Settlement of Trades in the United States

    Volta Metals' common shares are now eligible for electronic clearing and settlement in the United States through the Depository Trust Company, allowing shares to be held and traded via DTC's network of U.S. brokerage participants without physical certificates or manual transfers. Existing shareholders need take no action. Shares continue to trade on the CSE as VLTA, OTCQB as VOLMF and Frankfurt as

    Corporate
  13. Jul 22, 2026

    Volta Enters Agreement to Acquire Remaining 20% Interest of its Flagship Springer Rare Earth and Gallium Deposit in Ontario, Canada

    A definitive purchase agreement dated July 21, 2026 with RZJ Capital Management, LLC gives Volta the right to acquire the remaining 20% interest, and a path to 100%, in the Springer Rare Earth Element and Gallium Deposit near Sturgeon Falls, Ontario, for $1,000,000 cash and 10,000,000 shares at a deemed $0.20. The Vendor retains a 2% NSR on the mining claims, with 1% buyable for $1,000,000. Spring

    Acquisition
  14. Jul 21, 2026

    Volta Extends Land Position at Springer Top-10* North American Rare Earth Deposit; Historical Drilling on New Ground Returns up to 1.97% TREO – remains open for expansion

    A definitive agreement has been signed to acquire a 100% interest in an 8.3-hectare mineral claim contiguous with the eastern boundary of the Springer REE deposit near Sturgeon Falls, Ontario, for 600,000 common shares, with the vendor retaining a 2% NSR royalty, half of which may be bought back for C$500,000. The claim adds about 250 m of strike beyond the current resource and SLR-optimized pit s

    Drill results
  15. Jun 1, 2026

    Volta Delivers Positive Initial Metallurgical Results at Springer

    Drill hole SL25-25 at the Springer rare earth deposit near Sturgeon Falls, Ontario returned 0.40% TREO and 44.5 g/t Ga2O3 over 417.8 m from 5.2 m, including 3.73% TREO and 174.7 g/t Ga2O3 over 2.2 m from 88.2 m, with 5,145.9 g/t Nd2O3 and 1,701.3 g/t Pr6O11 in that interval. SL26-27 intersected 0.36% TREO and 45.8 g/t Ga2O3 over 264.0 m from 129.0 m, including 0.61% TREO and 55.4 g/t Ga2O3 over 22

    Study results
  16. Apr 9, 2026

    Volta Files Technical Report for Springer REE Deposit, Confirming a Top-10 North American Rare Earth Resource

    An independent NI 43-101 technical report by SLR Consulting (Canada) Ltd. has been filed for the Springer rare earth deposit at Sturgeon Falls, Ontario, with an effective date of December 31, 2025, reporting 56.6 Mt Indicated at 0.70% TREO and 119.5 Mt Inferred at 0.58% TREO, based on a C$43/t net metal revenue cut-off. The report contains no material differences from results disclosed February 23

    Study results
  17. Apr 7, 2026

    Volta Metals Announces Non-Brokered LIFE Offering

    Financing
  18. Jan 26, 2026

    Volta Intersects High-Grade Gallium Mineralization at the Springer REE Project in Ontario, Canada

    Drill hole SL25-23 at the Springer Rare Earth Project near Sturgeon Falls, Ontario returned 77 g/t Ga2O3 over 116.8m from 59.0m to 175.8m, including 120 g/t Ga2O3 over 11.1m from 153.0m to 164.1m and 332.0 g/t Ga2O3 over 1.0m from 82.0m to 83m. The sampled interval ended in 118.3 g/t Ga2O3, with the remainder of the hole to 372m still being assayed. Springer hosts a historical 2012 resource of 4.2

    Drill results
  19. Jan 21, 2026

    Volta Commences Definition Drilling and Resource Expansion Program at the Springer REE Project in Ontario, Canada

    A fully funded Phase 2 winter drill program has started at the Springer Rare Earth Deposit near Sturgeon Falls, Ontario, comprising 16 diamond drill holes totalling approximately 5,750 m, with holes of 300–400 m and completion scheduled for Q1-2026. The program will infill historic drilling to 50 m spacing, test extensions and collect geotechnical and metallurgical data for a Preliminary Economic

    Drill results
  20. Dec 18, 2025

    Ontario Minister and Nipissing First Nation Chief Visit Volta’s Springer Rare Earth Project, Advancing Indigenous Partnership and Critical Minerals Development

    Corporate

Related

Other Volta Metals projects

  • Aki Critical Element Project · Rare earths · Canada
Volta Metals profile →Volta Metals news →Reading an NI 43-101 →