Key facts
| Company | Westhaven Gold Corp. (TSXV: WHN) |
|---|---|
| Commodity | Gold |
| Location | British Columbia, Canada |
| Stage | PEA |
Mineral resource estimates
2 reported estimates, newest first. Categories are as disclosed by Westhaven Gold Corp.; inferred material carries the lowest confidence and cannot support a reserve.
| Category | Tonnes | Au g/t | Au oz | Ag g/t | Ag oz | Effective |
|---|---|---|---|---|---|---|
| IndicatedNI 43-101 | 3.4 Mt | 6.13 g/t | 677 koz | 32.3 g/t | 3.56 Moz | Feb 28, 2025 |
| InferredNI 43-101 | 2.3 Mt | 3.67 g/t | 270 koz | 25.2 g/t | 1.86 Moz | Feb 28, 2025 |
How the categories differ: Inferred vs Indicated vs Measured. Compare reports over time with the Resource Growth Tracker.
Economic studies
Preliminary economic assessment
Feb 28, 2025- NPV (5%)
- US$496M
- IRR
- 43.2%
- Payback
- 2.1 years
- Initial capex
- US$185M
- AISC
- US$836/oz
- Mine life
- 11.1 years
- Gold price assumed
- US$2,400/oz
Figures as extracted from each study, in US dollars as the studies report them. Open the report before relying on one.
News releases6 on file
Westhaven Reports South Zone Resource Infill Drilling Continues to Confirm Continuity of High-Grade Gold and Silver Mineralization Including 27.51m Grading 14.47 g/t Au & 52 g/t Ag Shovelnose Gold Property, Southern British Columbia
Infill drilling at the South Zone deposit on the Shovelnose gold property in southern British Columbia returned 27.51m grading 14.47 g/t Au and 52.3 g/t Ag and 16.80m at 4.63 g/t Au in hole SNR26-99, 30.76m at 3.31 g/t Au and 21.3 g/t Ag in SNR26-114, and 0.52m at 200 g/t Au and 141 g/t Ag in SNR26-113. The 35,000m program is 66% complete, with 73 holes (23,184m) drilled and a fifth rig starting a
Drill resultsWesthaven Launches 50,000m 2026 Drill Program at the Shovelnose Gold and Silver...
Drilling has started at the Shovelnose gold and silver project in the Spences Bridge Gold Belt, southern British Columbia. Subject to the outcome of today's special meeting of shareholders on the proposed transaction with Dundee Corporation, described in the December 22, 2025 news release, the work is expected to begin an approximately CDN$20 million, 50,000 metre resource definition and explorati
Drill results