Key facts
| Company | Awalé Resources (TSXV: ARIC) |
|---|---|
| Location | Côte d'Ivoire |
| Stage | Early exploration |
News releases17 on file
Awalé Connects Charger 1 and Charger 2 – Extending Gold Mineralization Across 300 Metres of Strike, Including 8.7 g/t Gold over 25 Metres and 7.0 g/t Gold over 28 Metres
Awalé Resources reports step-out diamond drilling at its Charger target in the Odienné Project, Côte d'Ivoire, connecting Charger 1 and Charger 2 over approximately 300 metres of strike. Highlights include 8.7 g/t gold over 25 metres in CHDD-62 (Charger 2) and 7.0 g/t gold over 28 metres in CHDD-52 (Charger 1), with results from a further 33 Charger holes pending.
Drill resultsAwalé Hits Multiple High-Grade Intervals Outside Current MRE at Charger 2, Including 18.0 g/t over 7 Metres
Step-out drilling at Charger 2, about 200 metres southwest of the Charger 1 deposit at the Odienné Project in Côte d'Ivoire, returned 18.0 g/t gold over 7m within 9.2 g/t gold over 18m from 144m (CHDD-24), 14.1 g/t gold over 4m within 4.0 g/t gold over 16m from 153m (CHDD-23), 13.9 g/t gold over 2m from 177m (CHDD-25) and 9.4 g/t gold over 2m from 240m (CHDD-21), all outside the current Charger re
Drill resultsAwalé Hits 24.8 g/t Gold over 5 Metres within 18.9 g/t Gold over 7 Metres at Charger
Step-down drilling at the Charger target on the Odienné Project in Côte d'Ivoire returned 18.9 g/t gold over 7m from 292m, including 24.8 g/t gold over 5m, in hole CHDD-20, and 9.2 g/t gold over 7m from 310m, including 14.7 g/t gold over 4m and 11.7 g/t gold over 4m, in CHDD-13. All 17 holes from the resource drilling program have now been reported, supporting an initial Mineral Resource Estimate
Drill resultsAwalé Hits 36.2 g/t Gold over 6 Metres at Charger, Confirming High-Grade Gold Continuity to 400 Metres Below Surface
Step-down drilling at the Charger target on the Odienné Project in Côte d'Ivoire returned 36.2 g/t gold over 6m from 475m, including 41.5 g/t gold over 5m (CHDD-17), 10.3 g/t gold over 8m from 426m (CHDD-14) and 9.2 g/t gold over 5m from 413m (OEDD-10), extending high-grade mineralization to 400m below surface. The five holes form part of a 17-hole program supporting an initial Mineral Resource Es
Drill resultsAwalé Hits 52.8 g/t Gold over 9 Metres from Charger 1 Step-Down Drilling
Step-down drilling at the Charger target on the Odienné Project in Côte d'Ivoire returned 52.8 g/t gold over 9m from 354m, including 78.9 g/t gold over 6m (CHDD-03), 10.6 g/t gold over 7m from 320m (CHDD-02), 17.6 g/t gold over 4m from 297m and 3.8 g/t gold over 19m from 305m (CHDD-04), and 2.7 g/t gold over 20m from 303m (OEDD-170). The six holes form part of a 17-hole phase supporting an initial
Drill resultsAwalé Discovers Second High-Grade Gold Zone 200 Metres from the Charger Trend
Step-out drilling at the Charger target on the Odienné Project in Côte d'Ivoire intersected a second mineralized zone, Charger 2, about 200 metres southwest of the Charger 1 discovery, with intercepts of 16.3 g/t Au over 1m within 2.6 g/t Au over 10m (OEDD-158), 12.2 g/t Au over 1m within 2.2 g/t Au over 10m (OEDD-156) and 12.1 g/t Au over 1m within 4.8 g/t Au over 4m (OEDD-159). These are the fir
Drill resultsAwalé Extends Charger’s High-Grade Gold Zone to 600 Metres below Surface; Intersects 17.9 g/t Gold over 6 Metres and Targets New Strike Extensions
Step-back diamond drilling at the Charger discovery on the Odienné Project in Côte d'Ivoire returned 17.9 g/t gold over 6 metres from 433 m downhole in hole OEDD-149, 1.9 g/t gold over 14 metres from 477 m in OEDD-150, and 4.8 g/t gold over 4 metres from 374 m plus 3.9 g/t gold over 9 metres from 446 m in OEDD-154. Mineralization now extends to 600 metres below surface and remains open. Four rigs
Drill results