JUNIOR MININGINTELLIGENCE
CompaniesNewsProspectors EXLive NowMedia
JUNIOR MININGINTELLIGENCE
CompaniesNewsProspectors EXLive NowMedia
  1. Home
  2. /
  3. Companies
  4. /
  5. Prismo Metals
  6. /
  7. News

Prismo Metals news releases

CSE: PRIZ

61 press releases from Prismo Metals, Jun 21, 2023 to Jul 15, 2026, newest first. That includes 29 drill results, 1 study result, 8 financings, 5 acquisitions, 3 management changes and 12 corporate updates. Each headline links to the original release on the company’s own site. The list is refreshed every morning.

← Prismo Metals profileCompany website ↗

202613 releases

  1. Jul 15, 2026

    Prismo Metals Assay Results at Silver King Show Highs of 1.73% copper, 30 ppm molybdenum, 1,362 g/t silver, 4.1% lead, and 1.3 g/t gold

    Assay results from 23 rock-chip samples at the Silver King Project in central Arizona returned highs of 1.73% copper, 30 ppm molybdenum, 1,362 g/t silver, 4.1% lead and 1.3 g/t gold. Mapping covering 50% of the property outlined a pyrite halo of at least approximately 2.0 km by 1.5 km, two hydrothermal breccia zones and potassic alteration, with IP chargeability increasing to approximately 225 m depth. Planned work includes further sampling, a deeper IP survey and Phase 2 drilling design.

    Drill results
  2. Jun 15, 2026

    Prismo Metals Reports 4,811 g/t Silver and Confirms Deep Porphyry Copper Potential Beneath Historic Silver King Mine, near Resolution Copper in Arizona

    Phase I drilling at the Silver King project near Superior, Arizona totalled eight holes for 1,272 metres. Hole SK-26-08 returned 2.3 m grading 1,452 g/t Ag, 1.6 g/t Au and 1.9% Cu, including 0.4 m at 4,811 g/t Ag, 4.6 g/t Au, 5% Cu and 3% Pb; other intercepts included 2.7 m at 557 g/t Ag and 1.2 m at 517 g/t Ag. Hole SK-26-07, drilled to 488 m, cut potassic alteration with copper averaging almost 0.05% over the bottom 73 m. Phase 2 targets are to be defined.

    Drill results
  3. Jun 9, 2026

    Prismo Metals Appoints Porphyry Expert Prof. Jamie Wilkinson for Propylitic Mineral Chemistry Targeting at Silver King Project

    Jamie J. Wilkinson, Professor of Geology at Imperial College London, has been appointed to apply propylitic alteration mineral chemistry techniques at Prismo Metals' Silver King project in the Pioneer Mining District near Superior, Arizona. The four-stage program includes selecting roughly 20 sample locations, electron microprobe and LA-ICP-MS analysis of chlorite and epidote at the Natural History Museum in London, 3D vectoring using the chlorite proximitor method, and a report with prioritized drill targets to inform Phase 2 drilling. The Resolution porphyry Cu-Mo deposit lies 3.4 km away.

    Management
  4. May 26, 2026

    Prismo Metals to Host Webinar on June 4th, 2026

    A live webinar and Q&A will be held on Thursday, June 4th at 1:00 pm PDT (4:00 pm EDT), hosted by Radius Research. CEO Alain Lambert, CXO Dr. Craig Gibson and Special Advisor Dr. Linus Keating will update on exploration at the Silver King mine project in Arizona, a historic producer of nearly six million ounces of silver at grades up to 61 ounces per ton, located 3.4 kilometres from the Resolution copper project main shaft. A recording will be available.

    Corporate
  5. May 12, 2026

    Prismo Metals Reports Positive Results from Reconnaissance Mapping and Sampling at Silver King Project, Arizona

    Reconnaissance mapping and sampling at the Silver King project in Arizona's Pioneer Mining District has covered 50% of the planned program, collecting 23 rock samples submitted to SGS, mapping two pyrite halo zones roughly 800 m and 600 m by 1,300 m across, and identifying previously unmapped hydrothermal breccias with pyrite, chalcopyrite and copper oxides. Assays from Phase 1's eight holes totaling 1,272 metres are expected in early June. Gordon Aldcorn resigns effective May 15, 2026, and 1,555,475 shares at $0.06 will settle CA$93,328.49 of debt.

    Drill results
  6. Apr 7, 2026

    Prismo Metals Completes Phase 1 Drill Campaign at Silver King

    Phase I diamond drilling at the Silver King project in Arizona's Pioneer Mining District is complete, comprising eight holes totalling 1,272 metres, with all holes intersecting the targeted quartz-vein and stockwork system. Deep hole SK-26-07 reached 1,600 feet (488 m) and intersected a quartz monzonite intrusion with potassic alteration, disseminated pyrite and local chalcopyrite and pyrrhotite. Assays are expected in May 2026. Prismo also appointed Dr. Linus Keating as Special Advisor.

    Drill results
  7. Mar 6, 2026

    Prismo Metals Closes Strategic Transaction with Blade Resources

    Prismo has closed its transaction assigning all rights, interests and obligations in the Hot Breccia copper project in the Arizona copper belt to Blade Resources, receiving 6,755,000 Blade common shares and $185,000 cash for total consideration of $2,364,250, leaving Prismo with about 24% of Blade and the right to nominate one director. At the Silver King project in Arizona, first hole SK-26-01 reached 477 feet (145 metres), intersecting quartz veining and visible silver minerals; SK-26-02 is at 155 feet within a fully funded 1,000-metre, nine-hole Phase 1 program.

    Acquisition
  8. Feb 27, 2026

    Prismo Metals to Advance Hot Breccia Toward Drilling Through Strategic Transaction

    Under a definitive assignment agreement, Prismo Metals will transfer all of its rights, interests and obligations in the Hot Breccia copper project in the Arizona copper belt to Blade Resources Inc., with closing expected on or about March 2, 2026. Prismo will receive 6,755,000 Blade common shares and a $185,000 cash payment, giving it about 24% of Blade and largest-shareholder status, total consideration $2,364,250. Prismo can nominate one Blade director and holds participation rights in future equity offerings, and will focus on Silver King and Ripsey Gold.

    Acquisition
  9. Feb 18, 2026

    Prismo Metals to Host Webinar on February 26th, 2026

    A live webinar with CEO Alain Lambert and Chief Exploration Officer Dr. Craig Gibson will be held February 26th at 1:00 pm PST (4:00 pm EST) to discuss the upcoming drill program at the Silver King project near Superior, Arizona, followed by audience Q&A. The release also notes the financing announced January 16th, 2026 has been completed for $147,500, and that on February 12th the company reported U.S. Forest Service permit approval and the engagement of Godbe Drilling LLC for Phase 1 drilling.

    Corporate
  10. Feb 12, 2026

    Prismo Metals Advances to Drilling at Historic Silver King Silver Project with Permit Approval and Contractor Engagement

    U.S. Forest Service permit approval has been received for a fully funded Phase 1 drill program at the Silver King Mine project in Arizona's Copper Belt. The program comprises 1,000 meters of diamond drilling in nine holes testing the upper portion of the steeply west-dipping pipelike stockwork and breccia zone, with mobilization scheduled for February 20, 2026. Godbe Drilling LLC has been engaged as contractor. The project lies 3.4 km from Resolution Copper.

    Drill results
  11. Jan 16, 2026

    Prismo Metals Closes Acquisition of Increased Interest in Hot Breccia

    Prismo Metals has closed its transaction with Infinitum Copper Corp., increasing its interest in the Hot Breccia copper project in Arizona from 75% to 95%, plus an irrevocable option on Infinitum's remaining 5%. Prismo paid Infinitum CA$185,000, assumed Infinitum's obligations to Walnut Mines LLC by issuing 450,630 common shares at a deemed price of $0.11, and agreed to pay Infinitum 5% of consideration from any assignment of its Hot Breccia interest to a third party.

    Acquisition
  12. Jan 9, 2026

    Prismo Metals to Increase Hot Breccia Interest to 95%, Secures Option for Full Control

    An agreement with Infinitum Copper Corp. will raise Prismo Metals' interest in the Hot Breccia copper project in Arizona from 75% to 95%, plus an irrevocable option to acquire Infinitum's remaining 5%. Prismo will pay Infinitum CA$185,000 and assume Infinitum's remaining share-issuance obligations to Walnut Mines LLC, valued at about CA$54,000 in Prismo shares at a deemed price of $0.11, and pay 5% of any consideration from assigning its Hot Breccia interest. Closing is expected on or around January 16th, funded by a third-party advance.

    News
  13. Jan 7, 2026

    Prismo Metals Announces Assay & IP Results at Silver King

    Final assay results from the Crown porphyry target at the Silver King project in Arizona returned silver grades including 177 g/t Ag over 2 m and 176 g/t Ag over 0.5 m, alongside previously reported 5.19 g/t Au and 4.06 g/t Au over 1.0 m. A pole-dipole IP survey completed in December 2025 identified chargeability and resistivity anomalies, with the Crown porphyry anomaly traceable to about 300 metres depth. A fully funded drill program of about 2,000 metres will focus on the historic Silver King mine site, pending Forest Service environmental analysis.

    Drill results

202517 releases

  1. Dec 3, 2025

    Prismo Metals Announces Assay & IP Results at Silver King

    Rock chip sampling at the Black Diamond replacement target on the Silver King project in Arizona returned several samples above 1% Cu, including two above 5% Cu (up to 6.02% Cu), while two vein samples from the Crown porphyry stockwork target assayed 4.06 and 5.19 g/t gold. An initial gradient-array IP survey identified resistivity lows and chargeability anomalies, with a follow-up pole-dipole survey planned for December ahead of a minimum 1,000 metre drill program. A second tranche of the private placement was upsized to 1,650,000 units at $0.10 for $165,000, bringing aggregate gross proceeds to $1,910,000.

    Drill results
  2. Nov 19, 2025

    Prismo Develops Additional Drill Targets at Silver King

    A mapping and sampling program at the Black Diamond area of the Silver King project in Arizona defined a large copper soil anomaly with anomalous gold over the replacement body, plus Zn, Pb, Ag and Sb anomalies over a newly identified altered felsic intrusion; 34 rock chip samples were submitted with assays pending, and an IP survey results are expected by the first week of December. The Forest Service deemed the drill plan complete, proceeding to NEPA review as a Categorical Exclusion. Prismo is funded for two 1,000-metre drill phases.

    Drill results
  3. Nov 13, 2025

    Prismo Metals Announces Closing of Upsized Private Placement

    An upsized non-brokered private placement closed with the issuance of 17,450,000 units at $0.10 per unit for gross proceeds of $1,745,000, increased from 12,500,000 units. Warrant terms were amended so each unit now consists of one share and one full warrant exercisable at $0.175 for 36 months, with the acceleration clause removed. Proceeds are intended primarily for drilling at the Silver King project and general corporate purposes, with about $125,000 in additional subscriptions expected.

    Financing
  4. Nov 5, 2025

    Prismo Metals Provided Extensions on Hot Breccia Copper Project

    Walnut Mines LLC, owner of the Hot Breccia claims in Arizona optioned as to 75% by Prismo Metals, has agreed to extend certain milestone dates. The $1,750,000 exploration expenditure deadline moves from January 31, 2026 to January 31, 2027, the $2,000,000 expenditure deadline from January 31, 2027 to January 31, 2028, and the final $275,000 cash payment from January 31, 2026 to July 31, 2026.

    Corporate
  5. Oct 20, 2025

    Prismo Metals Announces Private Placement and Ripsey Gold Project Overlimit Silver Assay Results

    A non-brokered private placement of 12.5 million units at $0.10 per unit for minimum gross proceeds of $1,250,000 was launched, with each unit comprising one share and one-half warrant exercisable at $0.175 for 36 months, subject to acceleration if shares close at or above $0.25 for ten consecutive trading days. Proceeds will fund a first phase of at least 1,000 metres of drilling at the Silver King project in Arizona. Overlimit silver assays from four Ripsey mine samples returned 132 to 224 g/t Ag.

    Financing
  6. Oct 16, 2025

    Prismo Reports High Grade Gold along with Silver, Copper and Zinc Mineralization at Ripsey Mine

    Assay results from 15 surface and shallow underground samples at the Ripsey Mine Project in Arizona included 14.7 g/t gold, greater than 100 g/t silver (overlimit pending), 3.28% copper and 3.26% zinc over 0.6 m, with sampling covering about 600 meters of strike length on patented land requiring no drill permit. A second batch of samples from the Silver King project returned 47 g/t silver, 3.43% lead and 3.42% zinc, and an induced polarization survey is scheduled to begin next week, taking two to three weeks.

    Drill results
  7. Sep 29, 2025

    Prismo Metals Receives High Silver and Copper Assays at Silver King Announces Expanded Drill Plan

    Drill results
  8. Sep 24, 2025

    Prismo Metals Receives High Ag and Cu Samples at Silver King with Multiple Overlimit Assays Pending.

    Drill results
  9. Sep 15, 2025

    Prismo Metals Identifies Porphyry Style Mineralization at Silver King

    Drill results
  10. Aug 28, 2025

    Prismo Metals Discovers Two Separate Mineralized Veins at Silver King

    Drill results
  11. Aug 18, 2025

    Prismo Engages Windfall Geotek for Data Analysis at Hot Breccia

    Corporate
  12. Aug 8, 2025

    Prismo Metals Announces Closing of Oversubscribed Private Placement

    Financing
  13. Jul 18, 2025

    Prismo Metals Announces Closing of Upsized Private Placement Silver King Exploration to Begin in July

    Financing
  14. Jul 4, 2025

    Prismo Metals Options Two High-Grade Silver-Gold Mines in the Arizona Copper Belt – Immediate Exploration Planned

    Acquisition
  15. Jun 5, 2025

    Prismo Metals Appoints Gordon Aldcorn as President

    Management
  16. Feb 28, 2025

    Prismo Metals Updates Exploration at Hot Breccia

    Drill results
  17. Feb 24, 2025

    Prismo Provides Corporate Update

    Corporate

202421 releases

  1. Dec 2, 2024

    Prismo Metals Announces $3 Million Private Placement

    Financing
  2. Oct 15, 2024

    Artificial Intelligence Study Confirms Prismo Metals’ Exploration Plan at Hot Breccia

    Study results
  3. Sep 24, 2024

    Drilling Has Started at Prismo Metals’ Palos Verdes Project

    Drill results
  4. Sep 10, 2024

    Prismo Metals Announces Security Based Compensation Grants

    Corporate
  5. Sep 2, 2024

    Prismo Metals Acquires Data and Updates Model for Hot Breccia Copper Project in Arizona

    Acquisition
  6. Aug 12, 2024

    Prismo Metals Announces Debt Settlement

    Corporate
  7. Jul 31, 2024

    Prismo Metals Mobilizes for Palos Verdes Drilling

    Drill results
  8. Jul 12, 2024

    Prismo Metals Secures Permit Approval for Deep Drilling Program at Hot Breccia Copper Project in Arizona

    Corporate
  9. Jun 21, 2024

    4 Reasons Why Arizona Remains an Elephant Country for Copper, and How Prismo’s Hot Breccia Project Fits In

    News
  10. Jun 19, 2024

    Prismo Metals Announces Closing of Private Placement and Debt Settlement Transactions

    Financing
  11. Jun 11, 2024

    Prismo Metals Announces Private Placement, Debt Settlement and Exploration Update

    Financing
  12. May 1, 2024

    Prismo Metals Strengthens Management Team

    Management
  13. Apr 11, 2024

    Prismo Metals Announces Frankfurt Stock Exchange Listing

    Corporate
  14. Apr 5, 2024

    Prismo Metals Announces Closing of Debt Settlement and Private Placement

    Financing
  15. Mar 26, 2024

    Prismo Metals Assays up to 5.69% Copper at the Hot Breccia Project in the Arizona Copper Belt

    Drill results
  16. Mar 4, 2024

    Prismo Metals Brings AI to Hot Breccia Copper Project in Arizona

    News
  17. Feb 21, 2024

    Prismo Metals Inc. Invites Shareholders and Investment Community to visit them at Booth 3010 at PDAC 2024 in Toronto, March 3-6

    Corporate
  18. Feb 20, 2024

    Prismo Metals´ Los Pavitos Gold Footprint Grows 2.5 km to the Northeast and Silver Footprint Also Grows 1 km

    Drill results
  19. Feb 9, 2024

    Prismo Metals ZTEM Survey Identifies Priority Drill Target at the Hot Breccia Copper Project in Arizona

    Drill results
  20. Feb 6, 2024

    Prismo Metals To Resume Drilling at Palos Verdes

    Drill results
  21. Jan 15, 2024

    Prismo Metals Invites Shareholders and Investment Community to visit us at Booth #612 at the VRIC in Vancouver, January 21-22, 2024

    Corporate

202310 releases

  1. Dec 5, 2023

    Prismo Metals Continues to Intersect Gold at Los Pavitos

    Drill results
  2. Oct 17, 2023

    Prismo Metals Intersects 10.2 g/t Gold over 6.6m at Los Pavitos Project

    Drill results
  3. Aug 24, 2023

    Prismo Metals Provides Palos Verdes Drilling Update

    Drill results
  4. Aug 3, 2023

    Prismo Metals Expands Drill Program at Palos Verdes

    Drill results
  5. Aug 1, 2023

    Prismo Metals Announces Drilling to Commence at Los Pavitos Reports Additional Assay Results from Trenching

    Drill results
  6. Jul 27, 2023

    Prismo Metals Intersects High-Grade Mineralization at Palos Verdes – Including 11,520 g/t AgEq Over 0.5 Meter

    Drill results
  7. Jul 21, 2023

    Prismo Metals Completes Trenching Program at Los Pavitos. Provides Update on Palos Verdes Assays

    Drill results
  8. Jul 11, 2023

    Prismo Metals Completes ZTEM Survey at the Hot Breccia Project in Arizona. Palos Verdes Assays Pending

    Drill results
  9. Jun 28, 2023

    Prismo Metals Samples 10.3 g/t Au and 104 g/t Ag over 4 meters at Los Pavitos

    Drill results
  10. Jun 21, 2023

    Prismo Metals Announces Results of its 2023 Annual General Meeting of Shareholders

    Corporate

Related

Prismo Metals profile →Financings →All junior mining news this week →Company directory →Reading drill results →