Yellowknife Lithium Project

Lithium · Northwest Territories, Canada

Yellowknife Lithium Project is a lithium project in Northwest Territories, Canada, at the early exploration stage, held by Li-FT Power (TSXV: LIFT).

5 news releases are filed under it here.

← Li-FT Power profileCompany website ↗

Key facts

CompanyLi-FT Power (TSXV: LIFT)
CommodityLithium
LocationNorthwest Territories, Canada
StageEarly exploration

About Yellowknife Lithium Project

The Yellowknife Lithium Project is comprised of mineral leases that cover the majority of the lithium pegmatites that make up the Yellowknife Pegmatite Province (“YPP”).

News releases5 on file

  1. Jun 30, 2026

    LIFT Reports Drill Results from Yellowknife Lithium Project, NWT

    Drilling at the Yellowknife Lithium Project in the Northwest Territories returned 26 m at 1.29% Li2O (including 17 m at 1.65% Li2O) in hole YLP-0312 at BIG East, 18 m at 1.41% Li2O in YLP-0306 at Ki, 21 m at 1.09% Li2O (including 13 m at 1.38%) in YLP-0304 at Fi Main, 22 m at 1.09% Li2O in YLP-0315 and 17 m at 1.32% Li2O in YLP-0320. Results cover 20 holes totalling 5,324 m from the 2026 winter an

    Drill results
  2. May 13, 2026

    LIFT Intersects 26 m at 1.29% Li2O at its BIG East pegmatite, Yellowknife Lithium Project, NWT

    Drilling at the BIG East pegmatite on the Yellowknife Lithium Project in the Northwest Territories returned 26 m at 1.29% Li2O, including 17 m at 1.65% Li2O, in hole YLP-0312, plus 10 m at 1.12% Li2O in YLP-0313 and 11 m at 1.04% Li2O in YLP-0324. The 2026 winter program totalled 17 holes for 4,778 m, with results reported for eight holes (2,110 m); four holes returned no significant results. BIG

    Drill results
  3. Mar 31, 2026

    LIFT Commences 2026 Environmental Baseline Data Collection Program at the Yellowknife Lithium Project

    A 2026 environmental baseline data collection program has begun at the Yellowknife Lithium Project in Northwest Territories, expanding study areas around the Big-Nite pegmatite cluster to support project planning and future permitting, including Environmental Assessment. The program covers aquatics, atmospherics, terrestrial and human environment components, began April 5 with under-ice water qual

    Corporate
  4. Mar 2, 2026

    LIFT Commences Lithium Carbonate Converter Scoping Study as Part of Integrated Downstream Strategy for the Yellowknife Lithium Project

    A Scoping Study has begun for a Lithium Carbonate Converter with planned capacity of 30,000 tpa LCE of battery grade lithium carbonate, taking spodumene concentrate feedstock from the Yellowknife Lithium Project in the Northwest Territories. The study includes a high-level site evaluation to determine the converter's optimal location, considering factors such as proximity and logistics to the Yell

    Study results
  5. Feb 17, 2026

    LIFT Announces Commencement of Drilling at the Yellowknife Lithium Project, NWT

    Drilling has begun at the Yellowknife Lithium Project in the Northwest Territories, with a 6,770m resource program of 26 holes at the BIG East spodumene pegmatite — 24 holes (6,480m) on the main dyke corridor and two holes (290m) at the Northeast extension. The holes step out from 2023–24 intercepts including 26m of 1.56% Li2O, 22m of 1.35% Li2O and 35m of 1.34% Li2O, targeting ~300m vertical dept

    Drill results