JUNIOR MININGINTELLIGENCE
CompaniesNewsProspectors EXLive NowMedia
JUNIOR MININGINTELLIGENCE
CompaniesNewsProspectors EXLive NowMedia
  1. Home
  2. /
  3. Companies
  4. /
  5. Lode Gold
  6. /
  7. News

Lode Gold news releases

TSXV: LOD

134 press releases from Lode Gold, Feb 28, 2022 to Oct 26, 2026, newest first. That includes 22 drill results, 5 resource updates, 8 study results, 28 financings, 8 acquisitions, 15 management changes and 38 corporate updates. Each headline links to the original release on the company’s own site. The list is refreshed every morning.

← Lode Gold profileCompany website ↗

202639 releases

  1. Oct 26, 2026

    Lode Gold Initiates Exploration to Evaluate Upside Potential at Historic High-Grade Mines Within Fremont Gold Mine

    Lode Gold is initiating exploration to evaluate additional gold potential at its 100%-owned Fremont Gold Mine on privately owned patented land in Mariposa County, California. The work will cover all seven deposits and nine additional exploration targets, and the company is reviewing French Mine, a historical high-grade mine, as the first satellite deposit under review.

    Drill results
  2. Oct 19, 2026

    Lode Gold completes first six holes of expanded 20-hole drill program at Fremont Gold Mine

    The first six holes of a 20-hole drill campaign have been completed at the Fremont Gold Mine in Mariposa County, California, with the program expanded by ten holes to 4,200 metres (13,780 feet). Holes PT-J_001 through PT-J_006 were drilled at an azimuth of 240° and dip of -75° to target depths of 105.0 to 171.3 metres for metallurgy and geotechnics, using PQ-diameter core. Samples from the first two holes have been submitted for assay.

    Drill results
  3. Sep 30, 2026

    Lode Gold Appoints Patrick W. Garretson as Senior Technical Advisor – Adds Major Mining Company Experience to Fremont Gold Mine

    Patrick W. Garretson has been appointed Senior Technical Advisor to the Fremont Gold Mine in Mariposa, California. Garretson has 35 years of mining experience with South32, Newmont, Goldcorp, Barrick and BHP Billiton, most recently as Project Lead managing Technical Services and the Taylor-Hermosa Feasibility Study for South32's Hermosa Project in Arizona. Lode Gold said upcoming Fremont milestones include an internal scoping study, expansion drilling, resource upgrade, environmental and permitting work, PFS and FS.

    Management
  4. Sep 25, 2026

    Lode Gold Commences Trading on the Frankfurt Stock Exchange Under X27

    Common shares began trading on the Frankfurt Stock Exchange on September 25, 2026 under the ticker X27 (WKN: A415CV), while continuing to trade on the TSX Venture Exchange as LOD and on the OTCQB as LODFF. In connection with its multi-tranche non-brokered private placement that closed July 28 and July 31, 2026 for aggregate gross proceeds of approximately $9.72 million, Lode Gold paid finder's fees of $334,577 in cash and issued 1,239,161 finder's warrants exercisable at $0.45 for 36 months.

    Corporate
  5. Sep 22, 2026

    Lode Gold Submit Documents To Discharge Senior Secured Debt And Advances Fremont Gold Mine Into Next Phase Of Growth

    All discharge documents have been submitted to release Lode Gold from its senior secured debt obligations, after which the Fremont Gold Mine in Mariposa, California, previously pledged as security, will be free of encumbrance and the Company and its subsidiaries will have no outstanding loan obligations. Over the next six months Lode Gold plans to develop a preliminary mine plan for Fremont to form the technical basis for environmental studies and permitting work.

    News
  6. Sep 10, 2026

    Lode Gold Expands Drill Program at Flagship Fremont Gold mine Project

    An expanded drill program at the 100%-owned Fremont Gold Mine in Mariposa County, California will add four drill pads — PT-J 011, PT-J 012, HGD-002 and HGD-003 — through an amendment to the previously approved Authorized Use Permit. PT-J 011 and PT-J 012 are metallurgical core holes collecting PQ-diameter core for recovery mapping and geometallurgical domain modeling, while HGD-002 and HGD-003 are vertical hydrogeological holes for in-situ permeability testing and monitoring, and will also test subsurface targets in areas lacking historical drilling.

    Drill results
  7. Sep 8, 2026

    Lode Gold Welcomes Mariposa County’s Focus On Mining As First Sector In Economic Development Initiative

    Mariposa County, California has identified mining as the first sector to be addressed under its economic development initiative and is developing a Mining Strategic Plan covering permitting, investment and workforce attraction. Lode Gold is advancing its Fremont gold project in the county through exploration, resource definition and mine development studies toward a Pre-Feasibility Study and subsequently a Feasibility Study, evaluating a modern bulk underground operation. Blue Moon Metals and Mariposa Gold Mines are advancing separate projects in the county.

    Corporate
  8. Aug 31, 2026

    Lode Gold Further Strengthens Engineering, Geological & Permitting Team

    Mine engineer Roberto Llovet Vázquez has been added to the Technical Advisory Board for the Fremont Gold Mine project in Mariposa, California. He is a Mine Engineer from the Polytechnic University of Madrid with over a decade of underground mining operations experience and has served as COO at underground operations in Spain, Peru and Mexico. The technical and permitting advisory team also includes Bill Fisher, Gary Wong, David Gunning, Carlos Saban, Jonathan Hill and Martin Stratte.

    Management
  9. Aug 17, 2026

    Lode Gold Commences Metallurgical Drilling At Fremont Gold Mine, Mariposa, Ca

    Metallurgical drilling has begun at the Fremont Gold Mine in Mariposa, California, with an engineering firm engaged to oversee PQ core sampling protocols, optimize multi-phase metallurgical flowsheets, and evaluate processing configurations to manage CAPEX and OPEX. Trade-off studies will compare gravity versus flotation recovery. The broader exploration and drilling program at Fremont is scheduled to commence in Summer 2026. A 2014 metallurgical report confirmed 91% recovery, which the new study is intended to validate.

    Corporate
  10. Aug 13, 2026

    Lode Gold Appoints Qi Guo to Board of Directors

    Qi Guo has been appointed to Lode Gold's board of directors. Guo is Founder, CEO and Portfolio Manager of EDE Asset Management Inc., a Canadian investment management firm registered as a Portfolio Manager, Investment Fund Manager and Exempt Market Dealer, and holds the Chartered Investment Manager designation. The Company also granted 2,250,000 deferred share units to certain directors, officers, advisors and consultants under its omnibus long-term incentive plan, vesting 50% immediately and 50% on the first anniversary of the grant date, subject to TSX Venture Exchange approval.

    Management
  11. Aug 10, 2026

    Lode Gold Receives Three-Year Drill Permit At Flagship Fremont Gold Mine, California

    Mariposa County has approved a three-year Administrative Use Permit allowing surface exploration and drilling on Lode Gold's 100% owned patented land at the Fremont Gold Mine in Mariposa County, California. The permit enables a planned 3,500 to 4,500-metre drilling program for the second half of 2026, covering metallurgical, geotechnical, hydrogeological and infill drilling at the Pine Tree–Josephine zones. The data is intended to support a Prefeasibility Study to be completed in 2027.

    Corporate
  12. Aug 4, 2026

    Lode Gold Completes Full Repayment Of Fremont Gold Mine Property Secured Loan Ahead Of Schedule

    Subsidiary Fremont Gold Mining LLC's senior secured loan, backed by the Fremont Gold Mine property in Mariposa County, California, has been fully repaid with approximately US$3.6 million of principal and accrued interest, ahead of its amended May 1, 2028 maturity. The repayment releases the property pledge and leaves Lode Gold and its subsidiaries with no loan obligations, and qualified the company for a rebate of 50% of the 2% extension fee. Near-term plans include completing a PFS by July 2027.

    Financing
  13. Jul 31, 2026

    LODE GOLD FURTHER UPSIZES PRIVATE PLACEMENT TO $9.872 MILLION AND CLOSES FINAL TRANCHE

    Lode Gold's non-brokered private placement was upsized to $9,782,000, with the second and third (final) tranches closing through the issuance of 3,488,261 and 2,648,997 units at 27 cents per unit for additional gross proceeds of $941,830 and $715,229. Total proceeds across all three tranches were $9,715,229 from 35,982,331 units, each with a warrant exercisable at 45 cents for 36 months; insiders took 237,037 units. Funds will advance technical work at the Fremont gold mine, partial debt repayment and working capital.

    Financing
  14. Jul 28, 2026

    Lode Gold Provides First Tranche Closing Update for Upsized $9 Million Non-Brokered Private Placement

    The first tranche of an upsized CAD$9 million non-brokered private placement has closed, with 29,845,073 units issued at CAD$0.27 per unit for gross proceeds of CAD$8,058,170. Subscriptions for the first tranche were closed off on July 22, 2026, being oversubscribed, and conditional TSXV approval for the expanded offering has been received. Securities are subject to a statutory hold period, and the second and final tranche is expected shortly. The release was issued at the TSXV's request to clarify the financing's status.

    Financing
  15. Jul 22, 2026

    Lode Gold upsizes Private placement to $9M; closes first Tranche $8M

    A non-brokered private placement has been upsized to $9 million, with a first tranche of 29,845,074 units at $0.27 per unit closing for gross proceeds of approximately $8.06 million; the second and final tranche is expected to close on or before July 31, 2026. Each unit includes one share and one warrant exercisable at $0.45 for 36 months, with acceleration if shares close at or above $0.80 for 10 consecutive trading days. Coast Capital subscribed for 5,185,185 units for $1,400,000, or 17% of the first tranche. Proceeds will fund technical work at the Fremont Gold Mine in California, including drilling toward a Preliminary Feasibility Study, plus working capital.

    Financing
  16. Jul 21, 2026

    Lode Gold Engages Contractor to Initiate Drilling at Fremont Gold Mine

    American Drilling Corp., a division of American Mining and Tunneling, has been engaged to carry out the 2026 drill program at the Fremont Gold Mine in Mariposa County, California, with personnel and equipment mobilizing before the end of July 2026. Phase 1 comprises 3,500 m of resource definition drilling: 1,400 m metallurgical and geotechnical and 600 m hydrological and infill at Pine Tree–Josephine, plus 1,500 m step-out at Chicken Gulch. A Pre-Feasibility Study on underground mining is expected in 2027.

    Drill results
  17. Jul 13, 2026

    Lode Gold Announces Non-Brokered Private Placement Of $7 Million Financing With Follow-On Investment From Lead Investor Coast Capital

    A non-brokered private placement of up to $7,000,000 through the issuance of up to 25,925,926 units at $0.27 per unit was announced, each unit comprising one common share and one warrant exercisable at $0.45 for three years, with an acceleration right if shares trade at $0.80 or more for 10 consecutive days. Coast Capital LLC, an insider holding over 18%, will participate to increase its stake to approximately 19.9%. Proceeds will fund technical work at the Fremont Gold Mine in California, including drilling toward a Preliminary Feasibility Study, and working capital.

    Financing
  18. Jul 9, 2026

    Lode Gold Resolves Legal Claim

    A settlement agreement has been reached resolving the contractual dispute and Notice of Claim first disclosed on February 13, 2026, with the claim formally withdrawn and mutual releases provided between Lode Gold, its former subsidiary now Gold Orogen Exploration Corp., and the business partner. Under the settlement, Lode Gold and the former partner will each invest $200,000 into Gold Orogen (CSE: OROG), subject to TSX Venture and Canadian Securities Exchange approval. Lode Gold also anticipates a shares-for-debt conversion with Gold Orogen, which together with the settlement could give each party up to 19.9%.

    Corporate
  19. Jul 8, 2026

    Lode Gold Files NI 43-101 Technical Report for the Fremont Gold MINE on SEDAR+

    An updated NI 43-101 technical report for the Fremont Gold Property in Mariposa County, California has been filed on SEDAR+, following the June 29, 2026 news release. At a 0.82 g/t cut-off, the resource estimate totals 19.9 Mt at 1.79 g/t Au for 1.15 Moz indicated and 38.5 Mt at 1.73 g/t Au for 2.17 Moz inferred. Pseudo-drillhole analysis showed grams x metre values of 79 to 87 g*m from 0 g/t to 3 g/t cut-offs, falling to 50 g*m at 4 g/t.

    Study results
  20. Jun 29, 2026

    Lode Gold Commences Engineering Studies at Fremont Gold Mine, Mariposa CA

    Technical engineering studies and a project readiness assessment have been initiated at the Fremont Gold Mine in Mariposa County, California, to establish a technical baseline ahead of mine plan development and permitting. The work will review historical mining, metallurgical and engineering data, identify data gaps, and make recommendations supporting future NI 43-101 reporting and a PFS. The 2026 updated resource stands at 1,110,444 oz at 1.84 g/t Au Indicated (18.776 Mt) and 1,978,568 oz at 1.86 g/t Au Inferred (33.107 Mt), at a 1 g/t cut-off.

    Study results
  21. Jun 4, 2026

    Lode Gold Invites Shareholders to Fremont Gold Mine Webinar: 2026 MRE Delivers 1.1 Moz M&I Gold, path to value creation – june 4, 2026, AT 12pM PACIFIC (pst)

    A technical webinar on the Fremont Gold Mine in Mariposa County, California will be held Thursday June 4, 2026 at 12 p.m. Pacific Standard Time, hosted via Zoom with a live Q&A and a replay to follow on the company website. Presenters include Technical Advisor Carlos Saban, VP Exploration Gary Wong, P.Eng., and CEO Wendy T. Chan, covering the updated MRE, plans toward a Preliminary Feasibility Study and project timeline. The MRE includes 1.11 Moz Au in 18.7 Mt at 1.84 g/t Au (Indicated) and 1.98 Moz Au in 33.1 Mt at 1.86 g/t Au (Inferred).

    Corporate
  22. May 25, 2026

    LODE Gold announces semi-annual financial reporting (sar) adoption

    Lode Gold Resources has adopted semi-annual financial reporting under Coordinated Blanket Order 51-933, a pilot program allowing eligible venture issuers to move from quarterly to semi-annual reporting. The Company will no longer file interim financial statements and MD&A for the three-month period ending March 31 or the nine-month period ending September 30, but will continue filing audited annual statements within 120 days of December 31 and six-month interim reports within 60 days of June 30.

    Corporate
  23. May 14, 2026

    Lode Gold’s New Mineral Resource Estimate: 1.11 MoZ of Gold – 18.8 mt at 1.84 g/t au (Measured & Indicated) and 1.99 MoZ of Gold (Inferred) – 33.1 mt at 1.86 g/t Au at Fremont Gold Mine

    An updated NI 43-101 mineral resource estimate for the 100%-owned Fremont Gold Mine in Mariposa County, California, at a 1 g/t Au cut-off, defines 18,776 kt Indicated at 1.84 g/t Au for 1,110,444 oz and 33,107 kt Inferred at 1.86 g/t Au for 1,978,568 oz, based on three of seven deposits. The estimate reflects a pivot to bulk underground mining, replacing the 2025 model's 3.0 g/t cut-off and 133,000 oz M&I. A Preliminary Feasibility Study is intended to start by Q2 2026 upon receipt of the Mariposa County drill permit.

    Resource update
  24. May 1, 2026

    Lode Gold Extends Construction Loan Agreement until 2028

    The maturity date of Lode Gold's construction loan with Romspen Investment Corporation has been extended to May 1, 2028 from October 31, 2026 under an amendment to the loan agreement. A 2% extension fee applies only to the original principal, with half rebated if the loan is repaid on or before May 1, 2027. The company said the extension supports continued advancement of the Fremont Gold mine in Mariposa, California over the next two years.

    Financing
  25. Apr 22, 2026

    Lode Gold Submits Drill Permit Application At Fremont Gold Mine

    A permit application for surface exploration drilling at the Fremont Gold Mine Project in Mariposa County, California has been submitted, prepared under county requirements, SMARA and subject to CEQA environmental review. The program would use existing drill pads and a centrifuge-based system for drilling fluids instead of settling ponds, and the permit, once approved, is expected to be valid for an initial three-year term. Since the December 31, 2025 year end, holders have exercised about 11.1 million warrants for roughly $4.27 million in proceeds.

    Corporate
  26. Apr 15, 2026

    2026 Annual General Meetings for Lode Gold

    Lode Gold Resources will hold its annual general meeting on June 25, 2026, at 10 am PST, with a record date of May 11, 2026. The company also granted 1,251,800 deferred share units at a deemed value of $0.25 per unit to directors, officers, advisors and consultants, and 54,700 stock options to an officer at a $0.25 exercise price for five years. Both vest 50% immediately and 50% on the first anniversary, subject to TSX Venture Exchange approval.

    Corporate
  27. Apr 13, 2026

    Lode GoLd Fremont Gold Mine Fast-Tracks Development with 3,500 m for Prelimenary Feasibility Study

    Lode Gold outlined an accelerated plan for its Fremont Gold Project in Mariposa County, California, with a 3,500 m drill program in 2026 to support a Preliminary Feasibility Study targeted for completion by Q2 2027. The program comprises 1,400 m of metallurgical and geotechnical drilling and 600 m of hydrological and infill drilling at Pine Tree–Josephine, plus 1,500 m of step-out drilling at Chicken Gulch. A 7,800 m underground program from two 2,200 m ramps is planned in 2028, with a Feasibility Study targeted by 2029.

    Study results
  28. Mar 18, 2026

    High Priority Reduced Intrusion-Related Gold System (RIRGS) Drill Targets: Coincident Bismuth-Tellurium-Gold Anomalies

    Gold Orogen Resources, previously a wholly owned subsidiary of Lode Gold, outlined 2026 exploration plans for the Golden Culvert and WIN projects in Yukon, focused on additional sampling and drilling of 3-5 high priority targets along a 27 km mineralized trend: RIRGS targets Border, Steelhead and Stingray, and orogenic targets Spine and Golden Dragon. Border is the highest priority drill target, with grab samples up to 8.5 g/t Au and sheeted quartz veins over roughly 2 km x 300 m at up to 10 veins/m. Spine, a new 2025 discovery, returned grab samples up to 0.111 g/t Au.

    Drill results
  29. Mar 2, 2026

    Lode Gold Completes Environmental Baseline Data Consolidation FOR the Fremont Gold MINE Project

    A consolidation of historical and recent environmental baseline data for the Fremont Gold Mine Project in Mariposa County, California has been completed, integrating groundwater and surface water monitoring from 1986–1987, 2022 and 2025 into a single validated database. Waters are classified as calcium-magnesium-bicarbonate type with neutral pH; arsenic was detected below the drinking water Maximum Contaminant Level in one groundwater well, and all other detected metals were below their MCLs. The dataset will support the Pre-Feasibility Study planned for 2026 and early 2027.

    Corporate
  30. Mar 2, 2026

    Lode Gold closes RTO Transaction, Subsidiary gold Orogen (“OROG”) trades March 2, 2026

    Subsidiary 1475039 B.C. Ltd. closed its Plan of Arrangement and reverse-takeover transactions with Lode Gold and Great Republic Mining (CSE:GRM) on February 26, 2026, and received final CSE approval to list as Gold Orogen Resources, with trading in its common shares beginning Monday March 2, 2026 under the symbol OROG. Lode Gold shareholders of record on the Effective Date automatically receive 0.5739 OROG shares for each Lode Gold share held. Gold Orogen plans 2026 drill programs in New Brunswick and Yukon.

    Corporate
  31. Feb 23, 2026

    Lode Gold Resources Invites Shareholders and Investment Community to Visit Them at Booth 2519 at PDAC 2026 in Toronto, March 1-4

    Lode Gold Resources will exhibit at Booth #2519 at the Prospectors & Developers Association of Canada (PDAC) Convention at the Metro Toronto Convention Centre in Toronto from Sunday, March 1 to Wednesday, March 4, 2026. The company holds early-stage exploration assets in Yukon and New Brunswick and a past-producing high-grade gold mine in the Mother Lode Gold Belt of California.

    Corporate
  32. Feb 23, 2026

    LODE GOLD’S SPIN CO, GOLD OROGEN, COMPLETES FALL DRILL PROGRAM AT McINTYRE BROOK

    Six diamond drill holes totaling 847.9 metres have been completed at the McIntyre Brook property in northern New Brunswick by Lode Gold's subsidiary Gold Orogen and its joint venture partner, with assays pending. The holes tested for an extension of Kinross-Puma's Lynx Zone along a 3 km corridor of geochemical anomalies. McIntyre Brook forms part of the 445 km² Acadian Gold Joint Venture land package, held through subsidiary 1475039 B.C. Ltd.

    Drill results
  33. Feb 18, 2026

    Lode Gold Initiates New Mineral Resource Block Model for the FREMONT GOLD MINE, CALIFORNIA

    A new Mineral Resource Estimate block model is underway for the Fremont Gold Project in Mariposa, California, incorporating over 7,000 historical underground channel samples digitized from original mine level maps and plans. The model will re-interpret the deposit as a continuous mineralized body rather than discrete vein-only domains and apply a lower cut-off grade based on updated underground mining cost assumptions from local contractors, reflecting a bulk underground mining scenario. The MRE will be completed under NI 43-101 standards.

    Resource update
  34. Feb 18, 2026

    Lode Gold Provides Update On Subsidiary Gold Orogen’s Rto Transaction And Cse Listing Effective Date Feb 18, 2026

    The concurrent closings of the court-approved plan of arrangement spinning out subsidiary Gold Orogen (1475039 B.C. Ltd.) and its reverse takeover of CSE-listed Great Republic Mining are now expected on Wednesday, Feb. 18, 2026, previously Feb. 11, with CSE final approval anticipated shortly thereafter. Registered Lode Gold shareholders of record the day before the Feb. 18, 2026 effective date will receive 0.5739 of a Gold Orogen share for each Lode Gold common share held.

    Corporate
  35. Feb 13, 2026

    Lode gold initiates permit process for surface drilling AT FREMONT GOLD MINE

    A legal and permitting advisory group based in San Francisco has been engaged to support permitting in Mariposa County, California for a drill program at the Fremont Gold Mine project. The permit application will seek authorization for ten surface drill holes totalling about 1,500 m, aimed at collecting material for metallurgical test work and geotechnical data for a rock mechanics study ahead of a planned Pre-Feasibility Study, rather than resource expansion. Separately, a business partner has filed a Notice of Claim against Lode Gold and 1475039 BC Ltd. seeking compensation over contractual terms; the company says it has met its obligations and retained counsel.

    Corporate
  36. Feb 11, 2026

    Lode Gold Provides Updates on Subsidary Gold Orogen RTO and Effective Date Feb 11, 2026

    Conditional CSE approval has been received for the listing of Lode Gold subsidiary 1475039 B.C. Ltd. (Gold Orogen) via a court-approved plan of arrangement under the Business Corporations Act (British Columbia), concurrent with a reverse takeover of CSE-listed Great Republic Mining (CSE:GRM). Gold Orogen, the resulting issuer, will trade on the CSE under the symbol OROG, with trading expected to begin roughly three business days after final CSE listing approval. Gold Orogen holds exploration assets in the Yukon and New Brunswick.

    Corporate
  37. Feb 2, 2026

    Lode Gold Evaluates Underground Mining Potential at Dingman Gold Project (Ontario) & Initiates New Geological Model (MRE: 376,000 Oz Au M&I + 47,000 Oz Au Inferred)

    Work has begun on a new geological model, including lithological and structural interpretations, for the wholly owned Dingman Gold Project in Hastings County, Ontario, which holds an NI 43-101 resource of 376,000 oz Au measured and indicated at a 0.94 g/t cutoff and 47,000 oz Au inferred at 0.71 g/t. The model targets shear-hosted structures interpreted as 5 to 10 metre wide mineralized bands amenable to underground mining, and will support a new MRE. Lode Gold is also exploring a joint venture or spin out for the project.

    Corporate
  38. Jan 27, 2026

    Lode gold completes field work to identify rirgs drill targets – Win Tombstone Belt, YukonSeven prospective targets confirmed by Vrify

    2025 exploration field work at the Golden Culvert and WIN projects in Yukon's Tombstone Belt is complete, with seven prospective targets identified using the VRIFY AI platform, including three new targets: Rubus, Golden Dragon and Camp. Over 600 rock samples and 48 soil samples were collected along the approximately 27 km strike length, with assays received and under interpretation. Subject to permitting and financing, the 2026 program is expected to include drill testing of historical and newly identified targets.

    Drill results
  39. Jan 7, 2026

    DAVID gUNNING jOINS lODE gOLD AS tECHNICAL aDVISOR

    David Gunning, a mining engineer with over 35 years of experience in underground gold mining, has joined Lode Gold as a technical advisor to assist in advancing the Fremont Gold Mine in California, USA. Separately, Romspen and Lode Gold agreed to extend the loan maturity date to October 31, 2026, subject to certain terms and conditions. Lode Gold will issue 700,000 warrants exercisable at $0.46, subject to TSXV approval, pay a 1% extension fee on any principal outstanding at maturity, while Romspen forgoes its existing equity conversion rights.

    Management

202525 releases

  1. Dec 18, 2025

    LODE GOLD RECEIVES CONDITIONAL APPROVAL FROM EXCHANGE; LISTING JANUARY 2026

    Conditional approval has been received from the Canadian Securities Exchange for the listing of Lode Gold's subsidiary 1475039 B.C. Ltd (Gold Orogen), with the effective listing date in January 2026. Registered Lode Gold shareholders as of the day before the effective date will receive a tax-free distribution of 0.5739 Gold Orogen shares per Lode Gold common share. Gold Orogen will trade under the symbol OROG via a reverse takeover of CSE-listed Great Republic Mining, commencing 3-5 business days after the effective date.

    Corporate
  2. Dec 12, 2025

    LODE GOLD APPOINTS DAVID SWETLOW AS CFO AND STRENGTHENS MANAGEMENT TEAM

    David Swetlow has been appointed Chief Financial Officer of Lode Gold Resources, having previously served as CFO of subsidiary 1475039 B.C. Ltd. (Gold Orogen), which is nearing completion of a reverse take-over with Great Republic Mining. He was granted 322,000 stock options at an exercise price of $0.21, with 50% vesting on grant and 50% on the first anniversary, expiring five years from issue. The record date for the Gold Orogen spin-out distribution of approximately 0.57 shares per Lode Gold share will be set shortly.

    Management
  3. Dec 9, 2025

    LODE GOLD ENTERS INTO EXCLUSIVE LOI WITH A MINING COMPANY TO ADVANCE FREMONT GOLD PROJECT AND REPAY DEBT

    Lode Gold Resources has signed an exclusive, confidential letter of intent with an unnamed mining company for its Fremont Gold Project in Mariposa, California, with a 45-day exclusivity and standstill period running to January 16, 2026. The contemplated arrangement would provide capital to advance Fremont and repay outstanding debt secured by the asset. Work to upgrade resources to Measured & Indicated would begin immediately, with a Pre-Feasibility Study targeted to start in early 2026 and finish in Spring 2027.

    Acquisition
  4. Dec 2, 2025

    LODE GOLD PROVIDES YEAR END REVIEW – UPCOMING MILESTONES AND KEY CATALYSTS ON FREMONT GOLD MINE

    A year-end review of the Fremont Gold Project in Mariposa, California sets out 2025 milestones and 2026 plans. The 2025 MRE reports 35.93 Mt at 2.73 g/t Au for 3.16 Moz contained gold at a 1 g/t cut-off, and an internal scoping study evaluated a 100% underground operation scaling from 4,000 tpd to 6,000 tpd. Plans include 8,500 m of drilling and a PFS targeted for end-2026/early 2027, a 300-500 tpd pilot plant in 2028, and a feasibility study starting 2028.

    Corporate
  5. Nov 26, 2025

    Lode Gold Adds 5,000 Historical Channel Samples to Upgrade Mineral Resource Estimate at Fremont Gold Mine, California

    More than 5,000 historical underground samples have been recovered from legacy geological maps and sections at the past-producing Fremont Gold mine in Mariposa County, California, increasing the validated sample database from 3,212 to 8,593 records, with analysis underway. The 5,728 recovered underground samples include channel cuts, short wall-rock drill holes, rib channels and bulk car sampling, alongside 665 daily assay reports from 1936 to 1941. Validation could allow an updated MRE with a higher Measured and Indicated to Inferred ratio, and a new 3D stope model has been completed.

    Drill results
  6. Oct 15, 2025

    Lode Gold Appoints Bill Fisher as Chair of Gold Orogen Technical Committee

    Bill Fisher, a current director of Gold Orogen, Lode Gold's subsidiary and planned spinout, has accepted the position of Chair of Gold Orogen's Technical Committee. Gold Orogen holds gold assets in the Yukon and New Brunswick. Lode Gold also granted stock options to purchase an aggregate of 2,157,500 common shares at an exercise price of $0.21 per share to directors and consultants, with 50% vesting on grant and 50% on the first anniversary, expiring five years from issue.

    Management
  7. Oct 7, 2025

    Lode Gold’s Planned Spin Co, Gold Orogen, Reports Results of Prospecting and Soil Geochemical Survey Work at McIntyre Brook and Riley Brook – Samples up to 7 g/t Gold

    Drill results
  8. Oct 1, 2025

    Lode Gold Identifies Upside Potential at Fremont Mine, Mariposa – Mother Lode Belt: 9 New Exploration Targets

    Drill results
  9. Sep 29, 2025

    LODE GOLD COMPLETED INTERNAL SCOPING STUDY AT FREMONT, MARIPOSA; INITIATES PROCESS TO SEEK JOINT VENTURE PARTNER

    Study results
  10. Sep 19, 2025

    LODE GOLD SECURES MSHA PROPERTY ID FOR FREMONT GOLD MINE; ADVANCES REACTIVATION OF HISTORIC CALIFORNIA GOLD OPERATION

    Corporate
  11. Sep 5, 2025

    LODE Gold Closes $1.51 Million Upsized Private Placement

    Financing
  12. Aug 8, 2025

    Lode Gold Completes Final Tranche Financing for Total $1.51 Million

    Financing
  13. Jun 24, 2025

    Lode Gold Engages Strategic Advisors to Advance Development of Fremont Gold Mine in Gold County, Mariposa California

    Management
  14. Jun 17, 2025

    LODE GOLD Closes Second Tranche of Private Placement for total Financing $1.2 MILLION To Initiate Work at the Fremont Mine in California

    Financing
  15. May 20, 2025

    Lode Gold Leverages Artificial Intelligence to Drive Exploration and Growth in Yukon

    News
  16. Apr 15, 2025

    LODE GOLD CLOSES FINANCING – $790,186 TO ADVANCE CALIFORNIA AND YUKON PROJECTS

    Financing
  17. Mar 11, 2025

    LODE GOLD SHAREHOLDERS APPROVE PLAN OF ARRANGEMENT FOR SPIN OUT OF GOLD OROGEN

    Acquisition
  18. Mar 7, 2025

    LODE GOLD STRENGTHENS BOARD OF SPIN CO GOLD OROGEN Ahead of tax-efficient Spin-out

    Management
  19. Mar 5, 2025

    LODE GOLD UPDATES RESOURCES: OVER 1 MOZ AU, 4 G/T WITH 16.8 M AVERAGE TRUE WIDTH / INITIATES INTERNAL SCOPING STUDY TO OPTIMIZE UNDERGROUND MINING

    Resource update
  20. Mar 3, 2025

    LODE GOLD’S UPCOMING SPIN CO, GOLD OROGEN, DEFINES 2025 NEW BRUNSWICK EXPLORATION TARGETS; REPORTS GOLD-IN-SOIL AND EM ANOMALIES identifying highly prospective mineralized systems at McIntyre Brook

    Drill results
  21. Feb 26, 2025

    LODE GOLD EXECUTES AGREEMENT WITH AXIOM TO INITIATE DRILL TARGETING PLAN FOCUSED ON RIRGS TARGETS AT WIN AND GOLDEN CULVERT IN YUKON

    Corporate
  22. Feb 19, 2025

    Lode Gold Sets Date for Shareholder Meeting to Approve Plan of Arrangement for Spinout Monday, March 10, 2025 at 10am PST

    Corporate
  23. Feb 15, 2025

    Lode Gold Announces $1,000,000 Financing

    Financing
  24. Jan 20, 2025

    LODE GOLD CONFIRMS GEOLOGY CONSISTENT TO ADJACENT PUMA/KINROSS IN NEW BRUNSWICK: GOLD MINERALIZED RHYOLITES

    Drill results
  25. Jan 10, 2025

    LODE GOLD UPDATES US OTC MARKET SYMBOL TO LODFF

    Corporate

202442 releases

  1. Dec 31, 2024

    Lode Gold Closes $350,000 Financing

    Financing
  2. Dec 23, 2024

    Lode Gold Announces $350,000 Non-Brokered Financing

    Financing
  3. Dec 12, 2024

    Lode Gold: 2024 Year-End Review and 2025 Outlook

    Corporate
  4. Dec 5, 2024

    Lode Gold Receives Tsxv Conditional Acceptance for Spinout Transaction and Sets a Shareholder Meeting Date to Approve Plan of Arrangement (Each Shareholder Will Receive Shares of Spin Co Gold Orogen)

    Acquisition
  5. Nov 14, 2024

    Two New Reduced Intrusive (RIRGS) Targets, Totalling Four, Identified at Tombstone Belt, Yukon – Gold Orogen, New Spin Co of Lode Gold

    Drill results
  6. Nov 12, 2024

    Lode Gold Presents Strategic Initiatives and Exploration Plans at 121 Mining Investment Event in London, UK

    Corporate
  7. Oct 28, 2024

    Lode Gold Submits Application for Exchange Approval to Form Spin Co, Gold Orogen – a Yukon (Tombstone Belt) & New Brunswick Exploration Company

    Corporate
  8. Oct 22, 2024

    Lode Gold Signs Definitive Agreement to Execute Tax-Efficient Spin-Out, Creating Two Pure Play Companies

    Acquisition
  9. Oct 15, 2024

    Lode Gold Identifies New High Priority RIRGS Target “STEELHEAD” At WIN, TOMBSTONE BELT – YUKON

    Drill results
  10. Oct 9, 2024

    LODE GOLD CLOSES $3.5 MILLION FINANCING AND STRATEGIC ALLIANCE; READY TO ADVANCE PROPERTIES IN YUKON AND NEW BRUNSWICK

    Financing
  11. Sep 24, 2024

    Lode Gold Submits Application for Exchange Approval to Form Spin Co, Gold Orogen – a Yukon (Tombstone Belt) & New Brunswick Exploration Company

    Corporate
  12. Sep 24, 2024

    Lode Gold signs Letter of Intent to Execute Tax Efficient Spin-Out, Creating Two Pure Play Companies

    Acquisition
  13. Sep 11, 2024

    Lode Gold Files NI 43-101 Technical Report for its McIntyre Brook Gold Project in New Brunswick in Preparation for Spinout

    Study results
  14. Aug 27, 2024

    Lode Gold Signs $3.5 Million Strategic Alliance; Creating One of the Largest PRospective Land Packages in New Brunswick

    News
  15. Jul 15, 2024

    Lode Gold Closes Financing

    Financing
  16. Jul 15, 2024

    Lode Gold Files NI 43-101 Technical Report on its Yukon Properties, Tombstone Gold Belt, key to executing its spinout plan

    Study results
  17. Jul 3, 2024

    Lode Gold Provides Mid Year Shareholder Update

    Corporate
  18. Jul 3, 2024

    Lode Gold Appoints New CFO, Announces Management Changes

    Management
  19. Jun 27, 2024

    Lode Gold Pivots strategy to focus on underground opportunity & present results of the evaluation of a potential high-grade underground mine at fremont, mariposa, on the prolific mother lode gold belt

    Drill results
  20. Jun 6, 2024

    Lode Gold Commissions Cutting Edge QMAG(T) Geophysical Survey on Its Golden Culvert and Win RIRGS And Orogenic Gold Projects, Yukon

    Drill results
  21. Jun 3, 2024

    Lode Gold Reviews McIntyre Brook Project, New Brunswick – Establishes High Exploration Potential

    News
  22. May 31, 2024

    Lode Gold Announces $2M Non-Brokered Financing

    Financing
  23. May 15, 2024

    Lode Gold Sets Up Subsidiary company to Vend in Yukon and New Brunswick assets

    News
  24. Apr 25, 2024

    Lode Gold (Formerly Stratabound) Completes Second Year Commitments on Property Options Advancing McIntyre Brook Ownership

    Acquisition
  25. Apr 24, 2024

    Lode Gold (Formerly Stratabound) Engages Former Director as Advisor for Matters Related to the Fremont Project, Located ~500km from Castle Mountain

    Management
  26. Apr 10, 2024

    Lode Gold (Formerly Stratabound) Initiates Work to Investigate High-Grade Underground Potential at Fremont on the Prolific Mother Lode Belt, ~500 km from Equinox Gold

    Drill results
  27. Apr 2, 2024

    Lode Gold Gains 100% Ownership of Claims and Option Partners Agree to Take Shares – Mcintyre Brook Project, New Brunswick

    Acquisition
  28. Mar 18, 2024

    Lode Gold Closes Second Tranche of Private Placement for Total Oversubscribed Financing of $2.08 Million

    Financing
  29. Mar 6, 2024

    Lode Gold (Formerly Stratabound) Receives Expression of Interest on Yukon and New Brunswick Assets

    News
  30. Mar 5, 2024

    Lode Gold (Formerly Stratabound) Announces Closing of First Tranche of Private Placement and Plans for Proceeds

    Financing
  31. Mar 4, 2024

    THE Mining Investment Event of the North, Quebec City – June 4-6, 2024 Announces Glencore Canada as a Gold Sponsor of THE Student Sponsorship 2024

    Corporate
  32. Mar 1, 2024

    Lode Gold (Formerly Stratabound) Closes First Tranche of Financing for $1.43 Million

    Financing
  33. Feb 29, 2024

    THE Mining Investment Event of the North, Quebec City – June 4-6, 2024 Announces Keynote Speaker, Pierre Fitzgibbon, Quebec Minister of Economy, Innovation and Energy

    Corporate
  34. Feb 16, 2024

    Lode Gold (Formerly Stratabound) Announces Extension of Non-Brokered Financing

    Financing
  35. Feb 5, 2024

    Lode Gold (Formerly Stratabound) Appoints Carlos Saban to Its Technical Advisory Board

    Management
  36. Jan 31, 2024

    Lode Gold (Formerly Stratabound) McIntyre Brook Property, New Brunswick: Confirms Gold Endowment Potential Within Its 17km Strike of the >20-Million-Ounce Appalachian Gold Corridor

    News
  37. Jan 19, 2024

    Stratabound Announces Change of Name to Lode Gold Resources Inc.

    Corporate
  38. Jan 17, 2024

    Stratabound Announces January 19th Investor Presentation and Reception – Vancouver, BC

    Corporate
  39. Jan 13, 2024

    Stratabound Announces Jan 19 Investor Presentation Reception Vancouver BC

    Corporate
  40. Jan 10, 2024

    Stratabound Provides 2023 Update and Outlines 2024 Restructuring and Growth Strategy and Plans

    Corporate
  41. Jan 8, 2024

    Stratabound Welcomes Key Shareholder and Further Improves Balance Sheet

    News
  42. Jan 3, 2024

    Stratabound Minerals Announces Non-Brokered $1.5 Million Financing

    Financing

202313 releases

  1. Dec 20, 2023

    Stratabound Strengthens Team, Appoints Buddy Doyle, Geologist and Mining Executive, as VP Exploration

    Management
  2. Dec 19, 2023

    Stratabound Announces CEO Retirement & Appoints Interim CEO To Lead Strategic Restructuring and Growth Process in 2024

    Management
  3. Dec 14, 2023

    Stratabound Announces Completion of Shares for Debt Transaction

    Financing
  4. Dec 13, 2023

    New Discovery: Stratabound Confirms Reduced Intrusion-Related Gold System (RIRGS) up to 8.53 g/t Gold, Southern Tombstone Belt, Yukon Territory

    Drill results
  5. Dec 7, 2023

    Stratabound Acquires 100% Ownership of Golden Culvert Property and Investigates New Reduced Intrusion-Related Gold Systems, Tombstone Gold Belt, Yukon Territory

    Acquisition
  6. Nov 28, 2023

    Stratabound Announces Amendment to Debt Transaction

    Financing
  7. Nov 16, 2023

    THE Mining Investment Event of the North, Quebec City – June 4-6, 2024 Featuring Critical & Battery Metals Day, June 5

    Corporate
  8. Sep 28, 2023

    Stratabound Announces Working Capital Loan

    Financing
  9. Sep 12, 2023

    Stratabound Announces Debt Restructuring and Reduction Through Shares for Debt Transaction, Corporate Update and AGM Results

    Financing
  10. Sep 11, 2023

    Stratabound Announces Appointments of Wendy Chan and Martin Stratte to the Board of Directors

    Management
  11. Apr 4, 2023

    Stratabound Files PEA Technical Report for the Fremont Gold Project, California Mother Lode Gold Belt

    Study results
  12. Feb 15, 2023

    Stratabound Announces Positive PEA for Fremont Gold Project; 11 Year Mine Life with Average Annual Production of 118,000 Gold Ounces at an AISC of US$1,082/oz and an After-Tax NPV5% of US$210M

    Study results
  13. Jan 24, 2023

    Stratabound Minerals Corp. Announces Closing of Financing

    Financing

202215 releases

  1. Dec 29, 2022

    Coast Capital Midas Master Fund LP Announces Increase in Ownership of the Common Shares of Stratabound Minerals Corp.

    Corporate
  2. Dec 22, 2022

    Stratabound Minerals Corp. Closes First Tranche of Non-Brokered Private Placement

    Financing
  3. Dec 14, 2022

    Stratabound Minerals Corp. Announces $2M Financing

    Financing
  4. Oct 20, 2022

    Stratabound Provides Exploration Updates and Issues Stock Options

    Drill results
  5. Oct 18, 2022

    Eric Sprott Announces Holdings in Stratabound Minerals Corp.

    News
  6. Oct 3, 2022

    Stratabound Files NI 43-101 Technical Report on Updated Mineral Resource Estimate on Fremont Gold Project

    Resource update
  7. Aug 18, 2022

    Stratabound Increases Mineral Resource Estimate on Fremont Gold Project

    Resource update
  8. Aug 11, 2022

    Stratabound Reports on Exploration Progress on Golden Culvert and Win Gold Projects and Receives Yukon Government Exploration Grant

    Drill results
  9. Jun 16, 2022

    Stratabound Appoints Keith Boyle as Fremont Gold Project Director and Provides Results of AGM Voting

    Management
  10. Jun 8, 2022

    Stratabound Commences Exploration at McIntyre Brook in Emerging Triple Fault Gold District, Receives Approval of New Brunswick Funding Grant, Extends Loan and to Present During PDAC

    Drill results
  11. Apr 14, 2022

    Stratabound Doubles Land Position in Emerging New Maritime Gold District

    News
  12. Mar 28, 2022

    THE Mining Investment Event of the North Welcomes Additional Keynotes, Sponsors, Companies As It Continues To Ramp Up Inaugural Event

    Corporate
  13. Mar 23, 2022

    Stratabound Commences 2022 Work Program at Fremont Gold Project

    Drill results
  14. Mar 21, 2022

    Stratabound Launches New Website and Enhanced Marketing Campaign

    Corporate
  15. Feb 28, 2022

    Stratabound Minerals Corp.: Invitation to Red Cloud’s 2022 Very Pre-PDAC Mining Showcase

    Corporate

Related

Lode Gold profile →Financings →All junior mining news this week →Company directory →Reading drill results →