Key facts
| Company | Onyx Gold (TSXV: ONYX) |
|---|---|
| Commodity | Gold |
| Location | Canada |
| Stage | Early exploration |
About Munro-Croesus Gold
The Munro-Croesus Gold Project is located approximately 75 kilometers (47 miles) east of Timmins, Ontario along Highway 101. This large, 100% owned land package includes the past-producing Croesus Mine, which yielded some of the highest-grade gold ever mined in Ontario. The highly prospective geology is proximal to the Porcupine-Destor Deformation Fault Zone and Pipestone Fault and located approximately three kilometres (1.9 miles) northwest and along trend of Mayfair Gold’s multi-million ounce Fenn-Gib gold deposit.
News releases3 on file
Onyx Gold Consolidates Key Ground Around Argus and Advances Extensive 2026 Surface Exploration Program Across Munro-Croesus
Four arm's-length, all-cash patented property acquisitions completed during 2026 give Onyx 100% of the key surface and mineral rights within a three-kilometre radius of the Argus Gold System at the 100%-owned Munro-Croesus Project, 75 km east of Timmins, Ontario, including a historical access trail offering a second route from Highway 101, about 2.7 km away. The option over the 21-hectare patented
CorporateOnyx Gold Intersects 1.7 g/t Au over 67.0 Meters, Including 13.2 g/t over 6.0 Meters and Visible Gold Grading 73.4 g/t Au at Argus Main
Drill hole MC26-340 at the Argus Main zone of the 100%-owned Munro-Croesus Project, 75 km east of Timmins, Ontario, returned 1.7 g/t Au over 67.0 m, including 4.1 g/t Au over 24.5 m, 13.2 g/t Au over 6.0 m and 73.4 g/t Au over 1.0 m with visible gold, while MC26-329 returned 0.7 g/t Au over 144.5 m. Six holes extended the Argus West corridor about 100 m west-southwest. The 110,000 m program is abo
Drill resultsOnyx Gold Commences 50,000 m Phase Three Drill Program and adds Third Rig at the Munro-Croesus Gold Project, Ontario
A fully funded 50,000 m phase three diamond drill program has begun at the 100%-owned, 109 km² Munro-Croesus Project, 75 km east of Timmins, Ontario, budgeted at $11 million and using three drill rigs. It follows a completed 25,000 m, 81-hole campaign, with results from 45 holes pending. Allocations include ~36,000 m on a three km mafic variolitic basalt trend, ~4,500 m at GM Vein/Croesus Flow, ~1
Drill results