Key facts
| Company | Transition Metals (TSXV: XTM) |
|---|---|
| Location | Ontario, Canada |
| Stage | Early exploration |
News releases6 on file
Transition Metals Drilling Returns Broad Intervals of Copper and 3E PGE (Pt + Pd + Au) Mineralization at the Saturday Night Project
Drilling completed in December 2025 at the 100%-owned Saturday Night PGE project, 30 kilometres north of Thunder Bay, Ontario, totalled 1,463 metres across an extension hole and two new holes. SN-25-03-X returned 14.44m of 0.61 g/t 3E PGE and 0.13% Cu, including 4.64m of 1.24 g/t 3E PGE and 0.21% Cu; SN-25-05 returned 10.75m of 0.76 g/t 3E PGE and 0.18% Cu. The mineralized footprint now measures a
Drill resultsTransition Metals Commences Follow-up Drilling at Saturday Night PGM Project amid Strengthening Platinum Markets
Drilling has resumed at the 100%-owned Saturday Night PGM project, about 30 kilometres northwest of Thunder Bay, Ontario, with a minimum of 1,500 m planned before year-end. The program will deepen hole SN-25-03 by up to 300 m to test the basal contact, plus holes targeting the up-dip extension of SN-25-02, which returned 14.00 metres grading 1.04 g/t 3E with 0.19% Cu. Officers and directors bought
Drill resultsTransition Metals Hits Thick Layered Intrusion with Anomalous Mineralization at Saturday Night Project, Thunder Bay, Ontario
Results from a two-hole, 1,417-metre drill program at the 100%-owned Saturday Night Project, 25 km north of Thunder Bay, Ontario, include hole SN-25-02 intersecting 14.00 m grading 1.04 g/t PGEs (Au+Pt+Pd) with 0.19% Cu, including 1.86 m at 2.55 g/t PGEs with 0.46% Cu. Hole SN-25-03 cut over 450 m of rift-related intrusion and a 15.02-metre interval (790.00–805.02 m) grading 472 ppm Cu and 142 ppm
Drill resultsTransition Metals Reports 14m of Ni-Cu-PGM Mineralization Intersected at Saturday Night Project, Ontario
Hole SN-25-02 at the 100%-owned Saturday Night Project, 25 kilometres north of Thunder Bay, Ontario, intersected 14.00m grading 1.04 g/t PGEs (Au+Pt+Pd), 0.07% Ni and 0.19% Cu, including 1.86m at 2.55 g/t PGEs and 0.46% Cu. The hole was a roughly 200m step-out from discovery hole SN-16-01 and reached 587m depth. A second hole, SN-25-03, was drilled 400m south to 830m, with results pending; the two
Drill resultsTransition Metals Commences Drill Program at its Saturday Night PGM Discovery, and will be in Attendance at VRIC and Roundup
Drilling has begun at the 100%-owned Saturday Night PGM project, 25 kilometres north of Thunder Bay, Ontario, with two holes totalling approximately 1,500 metres testing the basal contact of the Saturday Night layered intrusion. Half the cost, $200,000, is expected to be funded by a matching Ontario Junior Exploration Program grant. A 2016 hole returned 6.25 metres averaging 1.07 g/t PGMs, includi
Drill resultsTransition Metals Receives OJEP Grant Funding to Resume Drilling at its Saturday Night PGM Discovery in Early New Year
Matching grant funding of up to $200,000 under the 2024-25 Ontario Junior Exploration Program has been approved for the wholly owned Saturday Night PGM project, 30 kilometres northwest of Thunder Bay, Ontario, covering 50% of eligible exploration costs. A drill is expected to mobilize in early January 2025 for approximately 1,500 metres in a minimum of two holes, testing extensions to the 2016 dis
Drill results