Key facts
| Company | VR Resources Ltd. (TSXV: VRR) |
|---|---|
| Commodity | Copper |
| Location | USA |
| Stage | Early exploration |
About New Boston - Projects
New Boston epitomizes the Company’s blue-sky exploration strategy of applying new exploration technologies and modern mineral deposit modeling to large-footprint yet underexplored porphyry copper systems in Nevada. The company will leverage the experience gained from exploration on its Bonita, Junction and Reveille properties in western Nevada to advance the large and fully zoned, porphyry-skarn-breccia system exposed on surface at New Boston.
News releases4 on file
VR Receives NOI Permit with Expanded Drill Site Coverage for its New Boston Moly-Copper-Tungsten- Silver Porphyry Project in Nevada
The Nevada BLM has approved VR Resources' NOI drill permit amendment and associated reclamation bond for the New Boston moly-copper-tungsten-silver porphyry project, doubling permitted drill sites at the Jeep Mine area from 8 to 16 and allowing drilling to proceed. The permit application, submitted September 11, was approved September 16, with the bond submitted October 6 and approved October 9. E
CorporateVR Submits NOI Permit Amendment to Expand Drill Sites for its New Boston Moly-Tungsten-Copper-Silver Porphyry Project in Nevada
An amendment application to the Nevada BLM has been submitted to double permitted drill sites from eight to sixteen under the existing Notice of Intent drill permit at the Jeep Mine area of the New Boston moly-tungsten-copper-silver porphyry project in Nevada, ahead of follow-up drilling planned this fall. The original NOI was received March 6, 2026. Hole NB26-003 intersected 317 m at 0.77% CuEq f
CorporateVR intersects 317 m at 0.77% CuEq starting at surface, above 419 m of 0.48% CuEq, in 881 m drill hole of continuous polymetallic stockwork veining at New Boston Porphyry-Skarn project, Nevada
Drill hole NB26-003 at the New Boston porphyry-skarn project in west-central Nevada returned 0.77% CuEq over 317 m starting at surface and 0.48% CuEq over 419 m from 460 m, including 0.98% CuEq over 31 m at 604 m in a newly identified diorite porphyry intrusion and skarn, and 33.43% CuEq over 2 m at 535 m on 1.48% WO3, 0.32% Cu and 427 g/t Ag. The 881 m hole ended in mineralization due to instabil
Drill resultsVR completes 2,900 ft hole and polyphase vein intersection at its New Boston Moly-Tungsten-Copper-Silver Porphyry Project in Nevada; core scanning and continuous geochemistry are underway
Drill hole NB26-003 at the Jeep Mine target on the New Boston moly-tungsten-copper-silver skarn and porphyry project in west-central Nevada was completed at 2,892 ft (881 m), with polyphase quartz veins and vein and disseminated sulfide logged throughout the hole; the sub-vertical hole became unstable and was terminated still in mineralized veining. Hyperspectral core scanning at TerraCore and con
Drill results