Key facts
| Company | Pinnacle Silver and Gold Corp. (TSXV: PINN) |
|---|---|
| Commodity | Gold |
| Location | Mexico |
| Stage | Early exploration |
News releases29 on file
Pinnacle Prepares Plans for Drilling and Field Work to Follow Up on Polymetallic Discoveries at El Potrero
Pinnacle Silver and Gold has prepared a 16-hole, 1,876.5-metre Phase 1 diamond drill program to follow up silver-gold-lead-zinc mineralization on the Maria Fernanda 2 concession at its Potrero project in Durango, Mexico. Detailed mapping and sampling will also proceed on the northern El Potrero claim block, where silver-rich veins have returned assays up to 1,159 g/t Ag. A drill permit application
Drill resultsPinnacle Receives Permit for Surface Drilling Program at El Potrero and Provides Update on Other Permits for Production Restart
Pinnacle Silver and Gold has received a SEMARNAT permit for a surface drilling program at its past-producing El Potrero gold-silver project in Durango, Mexico, covering 110 drill sites and valid for two years. The first-pass program is planned at 48 holes for 5,540 metres, and the release also updates permitting for the mine, processing plant, tailings facility, powerline, water licence and other
CorporatePinnacle Confirms High-Grade Mineralization in Underground Drilling at El Potrero with up to 58.2 g/t Au and 631 g/t Ag
Pinnacle Silver and Gold reports underground drilling at the Pinos Cuates mine on its El Potrero property in Durango, Mexico, returning 6.19 g/t Au and 90 g/t Ag over 10.89 metres in hole EPUG26068 and 58.2 g/t Au and 631 g/t Ag over 0.41 metres within that interval. Assays for additional holes in the zone are pending.
Drill resultsPinnacle Provides First Results from Underground Drilling Program at El Potrero; Samples up to 59.2 g/t Au and 424 g/t Ag with Visible Gold
Pinnacle Silver and Gold reports first results from its underground drilling program at the El Potrero property in Durango, Mexico, with 58 of a planned 108 holes drilled and assays received for 37. Individual assays from the upper level of the Pinos Cuates mine reached 59.2 g/t Au and 424 g/t Ag over 1.07 metres, including fine-grained visible gold, and the known mineralized strike length there h
Drill resultsPinnacle Reopens Additional Historic Mine Workings at El Potrero and Samples up to 26.1 g/t Au and 511 g/t Ag
Pinnacle Silver and Gold reports that rehabilitation of historic underground workings at its El Potrero property in Durango, Mexico, opened the Dos de Mayo Norte workings, where channel sampling returned up to 26.1 g/t Au and 511 g/t Ag over 0.50 metres. The workings extend about 93 metres along the northwest strike of the Dos de Mayo vein, and surface drilling is planned for September-October 202
Drill resultsPinnacle Appoints Auramet Capital Partners, L.P. as Lead Project Financier for El Potrero Project
Pinnacle Silver and Gold Corp. has signed an agreement appointing Auramet Capital Partners, L.P. as Lead Project Financier to arrange or provide non-equity project financing of up to US$5 million for its El Potrero gold-silver project in Durango, Mexico. The agreement sets a seven-month Exclusivity Period and includes a US$400,000 break fee if Pinnacle accepts another offer.
FinancingPinnacle Receives More Positive Results from Second Round of Scoping Metallurgical Tests at El Potrero with Average Gold Recovery of 97.8% for the Main Dos de Mayo Vein
Pinnacle Silver and Gold reports second-round scoping metallurgical tests on its El Potrero gold-silver project in Durango, Mexico, with bottle roll leach gold recovery averaging 97.8% for the Dos de Mayo vein. Gold recoveries were 97.6% for Estrella and 97.4% for Capulin, while silver recoveries averaged 70.02% for Dos de Mayo, 64.7% for La Estrella and 80.5% for El Capulin.
Study resultsPinnacle Commences Underground Delineation Drilling Program at El Potrero
Pinnacle Silver and Gold has begun preparing for an underground delineation drilling program at its El Potrero gold-silver property in Durango, Mexico, with drilling starting at the Pinos Cuates mine. The current program totals 108 NQ-size holes over 2,416 metres across three historic mines, with Pinos Cuates accounting for 67 holes and 1,324 metres.
Drill resultsPinnacle Discovers More High-Grade Polymetallic Mineralization at El Potrero with Silver Assays up to 1,159 grams per tonne Underscoring District Scale Potential
Pinnacle Silver and Gold reports further polymetallic discoveries at its El Potrero project in Durango, Mexico, from ground follow-up of its LiDAR survey. The northern El Potrero block returned silver-rich veins with assays up to 1,159 g/t Ag, and the Paulina Breccia and Las Guasimas zones on the MF2 concession extend the vein system to approximately 1,100 metres of strike length.
Drill resultsPinnacle Discovers Silver-Lead-Zinc Mineralization Following up on LiDAR Survey at El Potrero
Pinnacle Silver and Gold Corp. reports discovery of silver-lead-zinc mineralization on the MF2 block of its El Potrero project in Durango, Mexico, following LiDAR-interpreted workings. Initial channel samples returned up to 266 g/t silver, 4.39% lead and 2.89% zinc, with additional results pending, and the mineralized breccia veins extend approximately 650 metres along strike.
Drill resultsPinnacle Provides Project Update for El Potrero as it Advances Towards a Production Decision
Pinnacle Silver and Gold provided a project update on its El Potrero gold-silver project in Durango, Mexico, saying underground rehabilitation of historic mine workings is expected to begin next week and underground delineation drilling by the second half of March. An environmental permit application for surface drilling has been submitted, with the program anticipated in about 90 days. A second r
CorporatePinnacle Amends Payment Terms for El Potrero Project
Pinnacle Silver and Gold has signed an amendment with the vendor of the Potrero Project in Durango, Mexico, splitting the original US$750,000 payment due February 21, 2026 into three equal US$250,000 payments on February 24, May 24 and August 24, 2026. All other cash payments and share issuances are unchanged.
CorporatePinnacle Samples up to 17.7 g/t Gold on La Estrella Vein and Extends Strike Length of La Dura Vein, Enlarging the Footprint of the Gold-Silver System at El Potrero
Pinnacle Silver and Gold reports surface and underground sampling at the El Potrero gold-silver project in Durango, Mexico, with individual channel samples up to 17.7 g/t Au and 24 g/t Ag over 0.5 metres on the La Estrella Vein. Surface sampling also extended mineralization along strike on the La Dura vein to approximately 45 metres.
Drill resultsPinnacle Provides Progress Update for El Potrero Gold-Silver Project
Pinnacle Silver and Gold Corp. provided a progress update on its El Potrero gold-silver project in Durango, Mexico, reporting 2025 sampling with grades up to 85.1 g/t Au and 2,280 g/t Ag and preliminary metallurgical recoveries averaging 95.09% for gold and 54.68% for silver. The company also outlined a 2026 plan of about 1,100 metres in roughly 50 underground delineation drill holes, with drillin
CorporatePinnacle Interprets Multiple New Targets From LiDAR Survey at El Potrero
Pinnacle Silver and Gold reports that an airborne LiDAR survey over its El Potrero gold-silver project in Durango, Mexico, confirmed the 1,600 metre known strike length of the Dos de Mayo vein system and identified a total of 64 adits, 6 shafts and 51 prospecting pits on the two claim blocks. The company says it will add to its geological team to follow up on the new targets.
Drill resultsPinnacle Prepares for Underground Drill Program on High-Grade Gold-Silver Targets at El Potrero
Pinnacle Silver and Gold plans an inaugural underground drill program at its El Potrero gold-silver project in Durango, Mexico, comprising approximately 2,600 metres in 112 holes over about six weeks. Holes will test the Dos de Mayo vein every 12.5 metres along strike and vertically, and development work in the historic workings is expected to begin early in the New Year and take about one month.
Drill resultsPinnacle Provides Further Details for El Potrero Finder’s Fee
Pinnacle Silver and Gold has received conditional TSX Venture Exchange approval for 191,580 Finder's Fee shares tied to the staged option of its El Potrero gold-silver project in Durango, Mexico. The finder, Juan Jose Camacho, is also due up to US$298,000 in cash under the schedule, including a second installment of 40,000 shares and US$8,000 now and a third of 40,000 shares and US$30,000 due Febr
NewsPinnacle Flies LiDAR Survey at El Potrero
Pinnacle Silver and Gold Corp. has flown an airborne LiDAR survey covering the entire 11 km² El Potrero gold-silver property in Durango, Mexico. Reprocessing and interpretation by GeoCloud Analytics will take about two weeks, with final results expected by early to mid-December.
Drill resultsPinnacle Receives Positive Results from Preliminary Metallurgical Tests at El Potrero with Average of 95.09% Gold Recovery
Pinnacle Silver and Gold reports preliminary metallurgical tests on three samples from the Pinos Cuates mine at its El Potrero gold-silver project in Durango, Mexico. Bottle roll cyanide leach tests gave gold recoveries of 92.81%, 95.68% and 96.79%, averaging 95.09%, while silver averaged 54.68%.
Study resultsPinnacle Delineates New Vein at El Potrero as Robust Epithermal System Takes Shape
Pinnacle Silver and Gold reports continued surface mapping and sampling at its El Potrero project in Durango, Mexico, extending high-grade gold-silver mineralization to surface over a vertical distance of up to 80 metres. Grab samples returned 2,280 g/t and 1,444 g/t silver at surface, and a newly defined parallel vein, El Capulin, about 200 metres away has been traced for approximately 375 metres
Drill resultsPinnacle Defines High-Grade Gold-Silver Mineralization in Dos de Mayo Mine at El Potrero
Pinnacle Silver and Gold reports underground channel sampling at the historic Dos de Mayo mine in the El Potrero Project, Durango, Mexico, with 53 channel samples in a raise returning a weighted average of 6.43 g/t Au and 110 g/t Ag for mineralized composites. The best composite was 11.2 g/t Au and 179 g/t Ag over 3.5 metres, and the company says drilling will be required to determine the extent o
Drill resultsPinnacle Samples up to 85.1 g/t Gold and 520 g/t Silver at El Potrero
Pinnacle Silver and Gold reports underground channel sampling at the historic Pinos Cuates mine, El Potrero Project, Durango, Mexico, returning assays up to 85.1 g/t gold and 520 g/t silver over 0.5 metres. The company also reports composite channel assays from a sub-level in the same zone, including 50.3 g/t Au and 269 g/t Ag over 1.7 metres, and plans an underground drilling program.
Drill resultsPinnacle Provides Update on High-Grade El Potrero Gold-Silver Project
Pinnacle Silver and Gold provides an update on its El Potrero gold-silver project in Durango, Mexico, reporting ongoing surface and underground sampling, a site visit to assess the processing plant and permitting, and plans for underground and surface diamond drilling. The release notes that the plant's basic infrastructure appears sound, with a final consultant report expected in about 3-4 weeks.
Drill resultsPinnacle Reports High-Grade Gold-Silver on Surface and in Underground Workings at El Potrero Project
Pinnacle Silver and Gold reports systematic underground channel sampling at the historic Pinos Cuates Mine on its El Potrero property in Durango, Mexico, returning composite channel assays of up to 19.4 g/t Au and 266 g/t Ag over 4.1 metres, including 37.3 g/t Au and 346 g/t Ag over 0.6 metres. Surface sampling at the Dos de Mayo vein system also returned grab samples of up to 13.2 g/t Au and 2,28
Drill resultsPinnacle Provides Progress Report on Field Work at El Potrero Gold-Silver Project and Grants Incentive Stock Options
Pinnacle Silver and Gold reports that Phase I field work at its El Potrero gold-silver project in Durango, Mexico, is progressing, with surface mapping extending the vein system about 1,100 metres northwest of the Dos de Mayo Mine and 132 samples submitted to the SGS lab in Durango City. The company also granted 500,000 incentive stock options to consultants at $0.05, expiring April 17, 2030, subj
CorporatePinnacle Samples up to 12.2 g/t Gold Equivalent and Commences Field Work at El Potrero Gold-Silver Project
Pinnacle Silver and Gold Corp. reports preliminary underground sampling at the El Potrero project in Durango, Mexico, with four chip channel samples from the Pinos Cuates Mine averaging 8.04 g/t gold and 146 g/t silver (9.70 g/t gold equivalent), and up to 12.21 g/t gold equivalent in one sample. The company also says Phase I field work has commenced on the project.
Drill resultsPinnacle Closes Non-Brokered Private Placement and Associated Acquisition of El Potrero Option
Pinnacle Silver and Gold Corp. has closed a non-brokered private placement raising gross proceeds of $800,000, subject to final TSXV approval, along with the associated staged option to acquire up to a 100% interest in the Potrero property in Durango, Mexico. The placement consists of 20,000,000 units at $0.04 per unit, and shares are expected to resume trading on February 28, 2025, subject to fin
FinancingPinnacle Provides Update on Proposed Acquisition of El Potrero Gold-Silver Project in Mexico
Pinnacle Silver and Gold Corp. provided an update on its proposed staged option to acquire up to a 100% interest, subject to a 2% NSR, in the Potrero gold-silver project in Durango, Mexico. The vendor and the company have extended the deadline to sign a Definitive Agreement to February 21, 2025, and the company anticipates closing by mid-February, subject to TSX Venture Exchange acceptance.
AcquisitionPinnacle Provides Updates on Proposed Acquisition of El Potrero Gold-Silver Project in Mexico, and on Canada Postal Strike and Mailing of the Company’s 2024 Annual General Meeting Materials
Pinnacle Silver and Gold Corp. said technical and legal due diligence on its proposed option to acquire up to a 100% interest in the Potrero gold-silver project in Durango, Mexico, is almost complete, with a TSXV filing expected by mid-January. The company also said its January 10, 2025 annual general meeting materials may be viewed on SEDAR+ and its website because of the Canada Post strike.
Acquisition