JUNIOR MININGINTELLIGENCE
CompaniesNewsProspectors EXLive NowMedia
JUNIOR MININGINTELLIGENCE
CompaniesNewsProspectors EXLive NowMedia
  1. Home
  2. /
  3. Companies
  4. /
  5. Scottie Resources Corp.
  6. /
  7. Scottie Gold Mine Project

Scottie Gold Mine Project

Gold · British Columbia, Canada

Scottie Gold Mine Project is a gold project in British Columbia, Canada, at the PEA stage, held by Scottie Resources Corp. (TSXV: SCOT).

3 resource estimates, 1 economic study and 18 news releases are filed under it here.

← Scottie Resources Corp. profileCompany website ↗

Key facts

CompanyScottie Resources Corp. (TSXV: SCOT)
CommodityGold
LocationBritish Columbia, Canada
StagePEA

Mineral resource estimates

3 reported estimates, newest first. Categories are as disclosed by Scottie Resources Corp.; inferred material carries the lowest confidence and cannot support a reserve.

CategoryTonnesAu g/tAu ozEffective
InferredNI 43-1013.6 Mt6.06 g/t703 kozOct 28, 2025
InferredNI 43-1011.7 Mt3.17 g/t174 kozFeb 2, 2025
InferredNI 43-1011.9 Mt8.66 g/t528 kozFeb 2, 2025

How the categories differ: Inferred vs Indicated vs Measured. Compare reports over time with the Resource Growth Tracker.

Economic studies

Preliminary economic assessment

Oct 28, 2025
NPV (5%)
US$216M
IRR
60.3%
Payback
1.2 years
Initial capex
US$129M
AISC
US$1,452/oz
Mine life
7 years
Annual production
65,400 oz
Gold price assumed
US$2,600/oz

Figures as extracted from each study, in US dollars as the studies report them. Open the report before relying on one.

News releases18 on file

  1. Oct 14, 2026

    Scottie Resources Announces Successful Completion of Drilling Program on Bow and Scottie Gold Mine Properties

    20 holes totalling 2,047 m have been completed on the Bow and Scottie Gold Mine properties in British Columbia's Golden Triangle, 35 km north of Stewart, with all holes intersecting structures favourable for gold mineralization. Drilling was carried out by Driftwood Diamond Drilling of Smithers, BC. Assays are expected to begin arriving in 5-7 weeks and will be released as received.

    Drill results
  2. Oct 14, 2026

    SCOTTIE RESOURCES INTERCEPTS 6.89 G/T GOLD OVER 5.8 METRES AT SCOTTIE GOLD MINE P-ZONE TARGET

    Drilling at the P-Zone of the Scottie Gold Mine project, 35 kilometres north of Stewart, BC, returned 6.89 g/t gold over 5.8 metres and 7.11 g/t gold over 2.20 metres, extending the zone to depth and to the west of previous drilling. Surface sampling identified a new vein zone between the Scottie Gold Mine and the D-Zone, with grab samples of 20.5 and 17.9 g/t gold. Stockwork holes returned 0.36 g

    Drill results
  3. Oct 14, 2026

    Scottie Resources and Nisga'a Nation Enter into Capacity Funding Agreement, Commencing the Path Towards Negotiations for an Impact Benefit Agreement for the Scottie Gold Mine Project

    A Capacity Funding Agreement has been signed with the Nisga'a Nation, represented by Nisga'a Lisims Government, providing funding for the Nation's technical review of permitting through independent consultants and legal costs for negotiating an Impact Benefit Agreement for the Scottie Gold Mine Project in British Columbia. The parties also agreed on an initial Interaction Matrix that will guide th

    Corporate
  4. Oct 14, 2026

    Scottie Resources Launches Major 2026 Growth Campaign with 50,000 Metre Drill Program at Scottie Gold Mine Project

    A fully financed $26 million 2026 exploration program will include approximately 52,000 metres of diamond drilling, with 50,000 metres at the road-accessible Scottie Gold Mine Project 35 kilometres north of Stewart in British Columbia's Golden Triangle and 2,000 metres in a first-ever drill program at the Cambria Property. Scottie drilling runs June through October using seven rigs, targeting the

    Drill results
  5. Oct 14, 2026

    Scottie Resources Completes over 10,000 M of Drilling on Its Scottie Gold Mine Project

    Over 10,000 m of drilling in 47 holes has been completed, with 7 drill rigs turning, as part of a fully financed 50,000 m program at the Scottie Gold Mine Project, 35 kilometres north of Stewart in British Columbia's Golden Triangle; assays are pending on the 47 holes and a Feasibility Study with updated MRE is targeted for H1 2027. On July 22, 2026, the company granted 584,075 options at $2.11, p

    Drill results
  6. Oct 14, 2026

    Scottie Resources Surpasses 25,000 Metres of Drilling at the Scottie Gold Mine Project

    More than 25,000 metres of drilling across over 100 holes has been completed at the Scottie Gold Mine Project, 35 km north of Stewart in British Columbia's Golden Triangle, representing about half of the fully financed 50,000-metre 2026 program. Eight diamond drills are turning, seven at Scottie Gold Mine and one at Cambria, where first-ever drilling has begun targeting 2,000–3,000 metres. Results

    Drill results
  7. Oct 14, 2026

    Scottie Resources Intercepts 9.7 g/t Gold over 18.00 m and 26.2 g/t Gold over 2.45 m at Blueberry Contact Zone at Scottie Gold Mine Project, BC

    Drilling at the Blueberry Contact Zone on the Scottie Gold Mine Project, 35 km north of Stewart, BC, returned 9.7 g/t gold over 18.00 m, including 40.4 g/t over 2.0 m, in hole SR26-492, plus 26.2 g/t gold over 2.45 m in SR26-489 and 14.6 g/t over 2.45 m in SR26-490. Over 40,000 m in 160 holes is complete of a planned 52,000-56,000 m program, with eight drills turning. An updated resource and Feasi

    Drill results
  8. Sep 9, 2026

    Scottie Resources Intercepts 9.7 g/t Gold Over 18.00 m and 26.2 g/t Gold Over 2.45 m at Blueberry Contact Zone at Scottie Gold Mine Project, BC

    First 2026 drill assays from the Blueberry Contact Zone at the Scottie Gold Mine Project, 35 km north of Stewart, BC, include hole SR26-492 with 9.7 g/t gold over 18.00 m (including 40.4 g/t over 2.0 m) and a further 15.9 g/t over 2.0 m, SR26-489 with 26.2 g/t over 2.45 m, and SR26-490 with 14.6 g/t over 2.45 m. Over 40,000 m in 160 holes is complete, with 52,000–56,000 m planned and eight drills

    Drill results
  9. Aug 18, 2026

    Scottie Resources Surpasses 25,000 Metres of Drilling at the Scottie Gold Mine Project

    More than 25,000 metres of drilling across over 100 holes has been completed at the Scottie Gold Mine Project, 35 km north of Stewart, British Columbia, representing about half of the fully financed 50,000-metre 2026 program. Eight diamond drills are turning, seven at Scottie Gold Mine and one at Cambria, where first-ever drilling has begun targeting 2,000–3,000 metres; roughly 2,000 metres have b

    Drill results
  10. Jul 23, 2026

    Scottie Resources Completes Over 10,000 M Of Drilling On Its Scottie Gold Mine Project

    Over 10,000 m of drilling in 47 holes has been completed, with seven rigs turning, as part of a fully financed 50,000 m program at the Scottie Gold Mine Project, 35 km north of Stewart in British Columbia's Golden Triangle; assays are pending on all 47 holes. Drilling targets the Blueberry Contact Zone, Scottie Gold Mine, Domino and other targets, with a Feasibility Study and updated MRE targeted

    Drill results
  11. May 21, 2026

    Scottie Resources Launches Major 2026 Growth Campaign with 50,000 Metre Drill Program at Scottie Gold Mine Project

    A fully financed $26 million, roughly 52,000 metre diamond drilling program is planned for 2026, comprising 50,000 metres at the Scottie Gold Mine Project 35 kilometres north of Stewart in British Columbia's Golden Triangle and 2,000 metres in the first drill program at the Cambria Property, running July to August. Scottie drilling will use seven rigs from June through October, focused on infill a

    Drill results
  12. May 12, 2026

    Scottie Resources and Nisga'a Nation Enter into Capacity Funding Agreement, Commencing the Path towards Negotiations for an Impact Benefit Agreement for the Scottie Gold Mine Project

    A Capacity Funding Agreement has been signed with the Nisga'a Nation, represented by Nisga'a Lisims Government, providing funding for the Nation's technical review of permitting through independent consultants and legal costs for negotiating an Impact Benefit Agreement for the Scottie Gold Mine Project in British Columbia. The project lies within the Nass Area, with part of the access road in the

    Corporate
  13. Mar 25, 2026

    Scottie Resources Determines Scottie Gold Mine Project below Impact Assessment Thresholds, Clearing Path to Advance Permitting

    The Scottie Gold Mine Project, as described in Scottie Resources' 2025 Preliminary Economic Assessment, does not require an environmental assessment under either the British Columbia Environmental Assessment Act or the Canadian Impact Assessment Act, following engagement with the Environmental Assessment Office and the Impact Assessment Agency of Canada. The company intends to advance through the

    Corporate
  14. Mar 18, 2026

    Scottie Resources Advances Direct-Ship Ore Strategy with Phase 2 Ore Sorting Study Success and Feasibility Study Launch

    Tetra Tech Inc. has been selected to lead a Feasibility Study on the 100%-owned Scottie Gold Mine Project in British Columbia's Golden Triangle, targeted for completion in Q2 2027 and evaluating a Direct-Ship Ore operation producing gold-bearing concentrate for Asian smelters. Phase 2 ore sorting tests confirmed Phase 1 results, with XRT recovering 82% to 92% of gold while accepting 50% to 65% of

    Study results
  15. Mar 9, 2026

    Scottie Resources Strengthens Leadership Team With Key Appointments & Additions As Company Advances Toward Development

    Effective immediately, Brad Rourke moves from Chief Executive Officer to Executive Chair, Dr. Thomas Mumford has been appointed President & CEO, and Chris Noon has been appointed Chief Financial Officer at Scottie Resources. The changes come as the company advances its Scottie Gold Mine Project in British Columbia's Golden Triangle toward production. Scottie states it is fully funded for its 2026

    Management
  16. Jan 22, 2026

    Scottie Resources Drills 14.8 g/t Gold Over 9.8 Metres and 17.6 g/t Gold Over 4.40 Metres at M-Zone at Scottie Gold Mine Project

    Drilling at the Scottie Gold Mine Project, 35 km north of Stewart, BC, returned 14.8 g/t gold over 9.80 metres in hole SR25-445, including 69.8 g/t gold over 2.0 metres, plus 17.6 g/t gold over 4.40 metres in SR25-439 and 21.1 g/t gold with 50.6 g/t silver over 3.45 metres in SR25-410, all at the M-Zone. Hole SR25-408 cut 7.56 g/t gold over 1.65 metres in the Wolf Zone. Blueberry Contact Zone resu

    Drill results
  17. Jan 15, 2026

    Scottie Resources Drills 16.1 g/t Gold Over 4.6 Metres at Fifi Zone and Discovers New Vein at Bend, Scottie Gold Mine Project, BC

    Drill hole SR25-416 returned 16.1 g/t gold over 4.60 m, including 56.5 g/t gold over 1.10 m, in the Fifi vein zone at the Scottie Gold Mine Project, 35 km north of Stewart, BC. SR25-409 cut 4.39 g/t gold over 5.00 m, including 16.8 g/t over 1.00 m, at the Road Zone, outside the resource block model but within the PEA open pit shell. Hydrological hole SR25-400 in the Bend area intersected a newly d

    Drill results
  18. Jan 6, 2026

    Scottie Resources Intercepts 6.41 g/t Gold Over 14.0 M, Continuing To Demonstrate High-Grade In Fifi Veins At Blueberry Contact Zone

    Drilling at the Blueberry Contact Zone of the Scottie Gold Mine Project, 35 km north of Stewart, BC, returned 6.41 g/t gold over 14.00 m in hole SR25-415, including 19.0 g/t over 4.00 m and 44.8 g/t over 1.00 m, in the Fifi vein zone. Hole SR25-413 returned 3.50 g/t gold over 5.35 m, including 6.35 g/t over 2.10 m, at the Blueberry Vein Zone, and SR25-371 returned 20.50 g/t gold over 1.10 m at Fif

    Drill results

Related

Other Scottie Resources Corp. projects

  • Cambria Project · Gold · Canada
  • Georgia Project · Gold · Canada
Scottie Resources Corp. profile →Scottie Resources Corp. news →Reading an NI 43-101 →