JUNIOR MININGINTELLIGENCE
CompaniesNewsProspectors EXLive NowMedia
JUNIOR MININGINTELLIGENCE
CompaniesNewsProspectors EXLive NowMedia
  1. Home
  2. /
  3. Companies
  4. /
  5. Aldebaran Resources Inc.
  6. /
  7. Altar Project

Altar Project

Copper · Argentina

Altar Project is a copper project in Argentina, at the PEA stage, held by Aldebaran Resources Inc. (TSXV: ALDE).

6 resource estimates, 1 economic study and 4 news releases are filed under it here.

← Aldebaran Resources Inc. profileCompany website ↗

Key facts

CompanyAldebaran Resources Inc. (TSXV: ALDE)
CommodityCopper
LocationArgentina
StagePEA

Mineral resource estimates

6 reported estimates, newest first. Categories are as disclosed by Aldebaran Resources Inc.; inferred material carries the lowest confidence and cannot support a reserve.

CategoryTonnesAu g/tAu ozAg g/tAg ozCu %Effective
MeasuredNI 43-101796.6 Mt0.11 g/t2.71 Moz1.08 g/t27.62 Moz0.42 %Dec 31, 2024
IndicatedNI 43-1011620.7 Mt0.06 g/t2.86 Moz1.31 g/t68.46 Moz0.41 %Dec 31, 2024
InferredNI 43-1011216.9 Mt0.04 g/t1.73 Moz1.26 g/t49.24 Moz0.37 %Dec 31, 2024
MeasuredNI 43-101622.1 Mt0.10 g/t1.99 Moz1.04 g/t20.82 Moz0.44 %Mar 22, 2021
IndicatedNI 43-101576.1 Mt0.08 g/t1.43 Moz0.96 g/t17.78 Moz0.42 %Mar 22, 2021
InferredNI 43-101189.2 Mt0.06 g/t390 koz0.80 g/t4.84 Moz0.42 %Mar 22, 2021

How the categories differ: Inferred vs Indicated vs Measured. Compare reports over time with the Resource Growth Tracker.

Economic studies

Preliminary economic assessment

Sep 1, 2025
IRR
20.5%
Payback
4 years
Initial capex
US$1593M
Mine life
48 years
Gold price assumed
US$2,500/oz

Figures as extracted from each study, in US dollars as the studies report them. Open the report before relying on one.

News releases4 on file

  1. Sep 9, 2026

    Aldebaran Reports 513 m of 1.06% CuEq (1.01% Cu, 0.08 g/t Au & 3.58 g/t Ag), Within 1,257.30 m of 0.66% CuEq (0.62% Cu, 0.05 g/t Au & 1.94 g/t Ag) at the Altar Copper-Gold Project in San Juan, Argentina

    Drilling at the Altar copper-gold project in San Juan, Argentina returned 1,257.30 m of 0.66% CuEq (0.62% Cu, 0.05 g/t Au, 1.94 g/t Ag) from 135.70 m in hole ALD-26-267, including 513 m of 1.06% CuEq and 214 m of 1.57% CuEq. Other holes returned 1,323.20 m of 0.50% CuEq, 939.30 m of 0.58% CuEq, 1,354 m of 0.41% CuEq and 1,336 m of 0.38% CuEq. Assay delays push the updated resource estimate to Octo

    Drill results
  2. May 21, 2026

    Aldebaran Reports 1,339.30 m of 0.45% CuEq (0.38% Cu, 0.14 g/t Au & 2.54 g/t Ag) including 500 m of 0.71% CuEq (0.58% Cu, 0.35 g/t Au & 1.42 g/t Ag)at the Altar Copper-Gold Project in San Juan, Argentina

    Infill drilling at the Altar copper-gold project in San Juan, Argentina returned 1,339.30 m of 0.45% CuEq from 12 m depth in hole ALD-26-173EXT, including 500 m of 0.71% CuEq from 326 m; other holes included 1,059.20 m of 0.51% CuEq, 1,198.00 m of 0.43% CuEq and 826.10 m of 0.54% CuEq with 98 m of 1.07% CuEq. The seven holes aimed to upgrade Inferred resource blocks to Measured and Indicated. An u

    Drill results
  3. Apr 9, 2026

    Aldebaran Reports 936 m of 0.66% CuEq (0.62% Cu, 0.09 g/t Au and 1.16 g/t Ag), including 194 m of 0.99% CuEq (0.92% Cu, 0.19 g/t Au and 1.02 g/t Ag) at the Altar Copper-Gold Project in San Juan Argentina

    Infill drilling at the Altar copper-gold project in San Juan, Argentina returned 936.00 m of 0.66% CuEq from 130 m depth in hole ALD-26-049EXT, including 194 m of 0.99% CuEq from 346 m; other holes included 1,048 m of 0.40% CuEq from 260 m (ALD-26-159EXT) and 1,353 m of 0.29% CuEq from 70 m (ALD-26-171EXT). Six rigs are drilling to convert Inferred resources to Measured and Indicated, with an upda

    Drill results
  4. Oct 30, 2025

    Aldebaran PEA for the Altar Project Reports 48 Year Mine Life, After Tax NPV (8%) of US$2 Billion, and 20.5% IRR

    A preliminary economic assessment for the Altar copper-gold project in San Juan, Argentina reports a 48-year mine life (including 3 years of construction), an after-tax NPV (8%) of US$2.0 billion, a 20.5% IRR and a 4-year payback, using base-case prices of $4.35/lb Cu, $2,500/oz Au and $27/oz Ag. The 60,000 tpd open-pit and block-cave plan carries initial capex of $1.59 billion, LOM capital of $5,

    Study results

Related

Other Aldebaran Resources Inc. projects

  • Altar Copper Gold Project · Copper · Argentina
  • Rio Grande Project · Copper · Argentina
Aldebaran Resources Inc. profile →Aldebaran Resources Inc. news →Reading an NI 43-101 →