Key facts
| Company | Corcel Exploration Inc. (CSE: CRCL) |
|---|---|
| Commodity | Gold |
| Location | USA |
| Stage | Early exploration |
About Yuma King Project
The Yuma King Project is Corcel Exploration’s flagship copper-gold exploration asset, located in the historic Ellsworth Mining District of west-central Arizona. The project offers a combination of historical high-grade production, evidence of a porphyry-skarn system, strong infrastructure, and large-scale exploration potential.
News releases7 on file
CORCEL DRILLS CU-AU SKARN, INDICATIONS OF NEARBY PORPHYRY CU-AU CENTER AT THE YUMA KING PROJECT, ARIZONA
Final assay results from the Phase I drill program at the Yuma King Project in west-central Arizona covered 1,087 meters in six holes, with copper and gold in each hole. YK26-005A returned 8.97 meters of 0.46% Cu, 0.39 g/t Au, 3.8 g/t Ag and 250 ppm Mo from 116 meters. YK26-006 cut 4.4 meters of 0.71% Cu, 0.19 g/t Au from 28.05 meters and 24.5 meters of 0.47% Cu, 0.32 g/t Au from 212 meters, separ
Drill resultsCORCEL INTERSECTS SKARN-HOSTED COPPER-GOLD MINERALIZATION IN STEP-OUT DRILLING EXPANDING STRIKE LENGTH TO 900M AT THE YUMA KING PROJECT, ARIZONA
Step-out drilling at the Yuma King Project in west-central Arizona returned 40.25 metres of 0.52% Cu, 0.40 g/t Au, 4.49 g/t Ag and 85 ppm Mo from 30 metres in YK26-002, a 45-metre eastern step-out, and 32 metres of 0.17% Cu, 0.04 g/t Au, 2.47 g/t Ag and 25 ppm Mo from 25 metres in YK26-003, 350 metres west of YK26-001. Known mineralized strike length increased by 350 metres to approximately 900 me
Drill resultsCORCEL DRILLS 56.65 METERS OF 1.07% CU, 0.79 G/T AU AND 7.1 G/T AG IN THE FIRST DRILL HOLE AT THE YUMA KING PROJECT, ARIZONA
Drill hole YK26-001, the first hole of the completed Phase 1 program at the Yuma King Project in west-central Arizona, returned 56.65 meters of 1.07% copper, 0.79 g/t gold, 7.1 g/t silver and 180 ppm molybdenum from 3.35 meters downhole, including 7.85 meters of 2.28% Cu, 1.14 g/t Au from 24 meters and 8.80 meters of 2.07% Cu, 1.85 g/t Au from 45 meters. The program totalled over 1,087 meters in s
Drill resultsCORCEL EXPLORATION REPORTS POSITIVE RESULTS FROM AN INDUCED POLARIZATION SURVEY AT YUMA KING, ARIZONA
An initial induced polarization survey covering 10 line-km with a 2D pole-dipole array over the Yuma King West and Yuma King Mine targets at the Yuma King Project in Arizona has defined a new YK North Skarn target, largely hidden by cover rocks, from resistivity inversion. Near-surface resistive zones at Three Musketeers correlate with magnetite-destructive alteration, with soils up to 1.47 g/t Au
Drill resultsCORCEL EXPLORATION COMMENCES DRILL PROGRAM AT YUMA KING PROJECT
Diamond drilling has begun at the Yuma King copper-gold project in Arizona, with the fully permitted Phase 1 program expected to comprise approximately 1,500 metres across 6–8 drill sites, targeting known mineralization and step-out targets. Corcel also completed a 10 line-kilometre 2D pole-dipole induced polarization survey over the Yuma King Mine and Yuma King West targets, with data processing
Drill resultsCORCEL EXPLORATION ANNOUNCES GRANT OF PERMIT AND COMMENCEMENT OF IP SURVEY AT YUMA KING PROJECT
The US Bureau of Land Management has accepted Corcel Exploration's reclamation bond for the Yuma King copper-gold project in Arizona, authorizing site preparation and drilling. The Company plans approximately 1,500 metres of diamond core drilling across 6–8 sites targeting skarn and porphyry mineralization, with historical drilling at the Yuma King Mine intersecting 0.78% Cu, 0.53 g/t Au and 6.3 g
Corporate