20261 release
Dakota Gold intersects 1.49 g/t gold and 8.13 g/t silver over 38.1 meters with infill drilling at Richmond Hill
Infill drill hole RH26C-387 at the Richmond Hill Oxide Heap Leach Gold Project in South Dakota returned 1.49 g/t gold and 8.13 g/t silver over 38.1 meters, while RH26C-398 returned 1.35 g/t gold and 34.54 g/t silver over 28.2 meters starting 7 meters below surface. The 2026 campaign comprises 15,481 meters in 109 holes, with 13,718 meters in 92 holes completed and completion expected in Q3 2026. Results feed a pre-feasibility study due in the second half of 2026. Cash stood at $107 million as of March 31, 2026.
Drill results