Service company
WSP
Named in junior miners' releases
42 releases from 16 companies named WSP in the last 12 months: report author 34, consultant 8.
| Company | Releases | Latest |
|---|---|---|
| Revival GoldRVG | 8 | Nov 2, 2026 |
| Brunswick ExplorationBRW | 6 | Nov 4, 2026 |
| New Found Gold CorpNFGC | 6 | Sep 16, 2026 |
| Ore Group | 3 | Jun 16, 2026 |
| RPX Gold Inc.RPX | 3 | May 20, 2026 |
| First Mining Gold Corp.FF | 3 | Jan 7, 2026 |
| Nevada Lithium Resources Inc.NVLH | 2 | Apr 29, 2026 |
| STLLR Gold Inc.STLR | 2 | Jan 9, 2026 |
| Snowline GoldSGD | 2 | Dec 16, 2025 |
| Fortune Minerals LimitedFT | 1 | Oct 29, 2026 |
| Troilus Mining CorporationTLG | 1 | Sep 9, 2026 |
| Li-FT PowerLIFT | 1 | Jul 20, 2026 |
| Silver Storm MiningSVRS | 1 | Jul 4, 2026 |
| Gold Terra Resource Corp.YGT | 1 | Jun 15, 2026 |
| Blackrock SilverBRC | 1 | Mar 4, 2026 |
| PMET Resources Inc.PMET | 1 | Nov 15, 2025 |
What the releases say
Nov 4, 2026Report authorBrunswick Exploration
“SEC Technical Report Summary for the James Bay Lithium Project prepared by SLR Consulting (Canada), Wave International Pty and WSP Canada for Arcadium Lithium Plc., dated August 31, 2023.”
Brunswick Exploration Reports 1.73% Li2O over 302 Meters Including 142 Meters at 1.97% Li2O at the Anatacau Main ProjectNov 2, 2026Report authorRevival GoldMercur Project
“Revival Gold’s mine planning and geotechnical consultant, WSP USA Inc. (“WSP”), completed a trade-off study comparing the Company’s PEA heap leach facility (“HLF”) siting at West Mercur with an alternative site at Main Mercur;”
Revival Gold Advances Pre-Feasibility Study and Permitting Work at Mercur, Utah’s Largest Primary Gold Development ProjectOct 29, 2026ConsultantFortune Minerals Limited
“Worley Canada Services Ltd. (“ Worley ”) is leading the Study team, with P&E Mining Consultants Inc. (“ P&E ”), Micon International Limited (“ Micon ”) and WSP Canada Inc. (“ WSP ”) also contributing their respective expertise.”
Fortune Minerals Provides Nico Feasibility Study UpdateOct 8, 2026Report authorBrunswick Exploration
“SEC Technical Report Summary for the James Bay Lithium Project prepared by SLR Consulting (Canada), Wave International Pty and WSP Canada for Arcadium Lithium Plc., dated August 31, 2023.”
Brunswick Exploration Reports 1.31% Li2O over 202 Metres Including 85 Metres at 1.73% Li2O at the Anatacau Main ProjectOct 7, 2026Report authorRevival GoldBeartrack-Arnett Project
“In the Joss area, the Project currently hosts an underground sulphide Inferred Mineral Resource of 6,745,000 tonnes grading 4.05 g/T for 877,000 ounces of gold that is not included in Beartrack-Arnett’s 2023 first phase open pit, heap leach PFS economics (see “Preliminary Feasibility Study NI 43-101 Technical Report on the Beartrack-Arnett Heap Leach Project, Lemhi County, Idaho, USA” prepared by Kappes, Cassidy & Associates, IMC, KCH and WSP dated August 2nd, 2023, for further details).”
Revival Gold Intersects 8.4 g/T gold over 6.2 Meters and 8.5 g/T gold over 3.4 Meters Supporting Overall Continuity of Mineralization at the Beartrack-Arnett Joss TargetSep 17, 2026Report authorBrunswick Exploration
“SEC Technical Report Summary for the James Bay Lithium Project prepared by SLR Consulting (Canada), Wave International Pty and WSP Canada for Arcadium Lithium Plc., dated August 31 2023.”
Brunswick Exploration Intercepts 202 Metre-Wide Spodumene-Bearing Pegmatite Interval at the Anatacau Main ProjectSep 16, 2026Report authorNew Found Gold Corp
“¹ See the New Found Gold press release dated February 26, 2026 and Technical Report titled “New Found Gold Corp. Hammerdown Gold Project Preliminary Economic Assessment, Newfoundland and Labrador, Canada”, with an effective date of February 18, 2026, prepared by WSP Canada Inc.”
New Found Gold Declares Commercial Production at Hammerdown Gold MineSep 9, 2026Report authorTroilus Mining CorporationTroilus Project
“The Technical Report was prepared in accordance with NI 43-101 for Troilus with contributions from BBA Inc. (“BBA”), AGP Mining Consultants Inc. (“AGP”) and WSP Canada Inc. (“WSP”), and incorporates the results of the Company’s completed Basic Engineering program.”
Troilus Reports Updated Technical Report Following Completion of Basic Engineering, Delivering After-Tax US$3.2 Billion NPV5%, 22% IRR, and Cashflow of US$6.9 Billion at Base Case Gold Price of US $3,600/ozAug 4, 2026Report authorRevival GoldBeartrack-Arnett Project
“See “Preliminary Feasibility Study NI 43-101 Technical Report on Beartrack-Arnett Heap Leach Project, Lemhi County, Idaho, USA, prepared by Kappes, Cassidy & Associates, IMC, KCH and WSP August 2 nd , 2023”, for further details.”
Revival Gold Intersects 3.43 g/t Gold Over 131.7 Meters, Including 6.6 g/t Gold Over 42.5 Meters at Beartrack-Arnett in IdahoJul 20, 2026Report authorLi-FT Power
“Jeff began his career as a geotechnical engineer with Golder Associates working on both underground and open pit mining projects across Canada.”
LIFT Announces Key Executive Appointments for Next Phase of DevelopmentJul 6, 2026Report authorNew Found Gold Corp
“ ”) and New Found Gold’s Technical Report titled Technical Report titled “New Found Gold Corp. Hammerdown Gold Project Preliminary Economic Assessment, Newfoundland and Labrador, Canada”, with an effective date of February 18, 2026, prepared by WSP Canada Inc. [2] AISC is calculated as the sum of treatment and refining charges, royalties, onsite operating costs, sustaining capital costs, and closure costs, divided by the quantity of ounces sold.”
New Found Gold Provides Queensway and Pine Cove UpdateJul 4, 2026ConsultantSilver Storm Mining
“He worked at BBA Consultants and WSP for 8 years, where he provided project leadership, strategic planning, and corporate advisory services.”
Silver Storm Expands Senior Leadership and Technical TeamJun 25, 2026Report authorRevival GoldBeartrack-Arnett Project
“rnett’s 2023 first phase open pit, heap leach PFS economics (see “Preliminary Feasibility Study NI 43-101 Technical Report on the Beartrack-Arnett Heap Leach Project, Lemhi County, Idaho, USA” prepared by Kappes, Cassidy & Associates, IMC, KCH and WSP dated August 2nd, 2023, for further details).”
Drilling Intersects 14.9 g/t Gold Over 5.9 Meters and Extends Depth of Mineralization by 240 Meters at JossJun 16, 2026Report authorOre Group
“2026 Catalyst Pipeline Drilling commenced on the historic Kerr-Addison tailings deposit at McGarry, estimated at approximately 40 Mt, with WSP Canada retained to manage the program; metallurgical testing is anticipated in summer 2026 and an NI 43-101 mineral resource estimate is targeted for fall 2026.”
Orecap Portfolio Update: Companies Advance Key 2026 Milestones Across the GroupJun 15, 2026Report authorGold Terra Resource Corp.Yellowknife Project
“WSP has already completed a conceptual design of a downstream tailing storage facility that is contained within the Mining Lease boundaries of the Con Mine, which seeks to simplify the project footprint without requiring additional surface rights.”
Gold Terra Contracts SLR for Preliminary Economic Assessment on the Con Mine Property and the Crestaurum Deposit, Yellowknife, NWTJun 11, 2026Report authorNew Found Gold Corp
“1 See New Found Gold’s and Technical Report titled “New Found Gold Corp. Hammerdown Gold Project Preliminary Economic Assessment, Newfoundland and Labrador, Canada”, with an effective date of February 18, 2026, prepared by WSP Canada Inc. 2 The PEA is preliminary in nature, it includes Inferred Mineral Resources that are considered too speculative geologically to have economic considerations applied to them that would enable them to be categorized as Mineral Reserves, and there is no certainty t”
New Found Gold Provides Hammerdown UpdateMay 20, 2026Report authorRPX Gold Inc.Wawa Gold Project
“The PEA was prepared by DRA Americas Inc. (“DRA”) in accordance with National Instrument 43-101 (“NI 43-101”) and was supported by an updated 2026 Mineral Resource Estimate (“2026 MRE”) prepared by WSP Canada Inc., which reflected a 48% increase in indicated ounces compared to the 2024 MRE.”
RPX GOLD PROVIDES CORPORATE UPDATE AND NEXT STEPS TO ADVANCE THE WAWA GOLD PROJECT TOWARDS A PRE-FEASIBILITY STUDYMay 19, 2026ConsultantOre Group
“Key parameters to be characterised include: Vertical and lateral grade continuity Tailings depth and volumetric extent Material density and moisture conditions Metallurgical characteristics and gold recovery potential WSP Canada Inc., a leading engineering and environmental consulting firm, has been retained to manage the sonic drilling program.”
Stardust Metals Moves to Quantify Gold Opportunity from Kerr-Addison TailingsMay 19, 2026Report authorOre Group
“WSP Canada retained to manage the sonic drilling program, metallurgical study and resource estimate to follow.”
Stardust Metals Moves to Quantify Gold Opportunity from Kerr-Addison TailingsMay 14, 2026ConsultantRevival GoldMercur Project
“Mineral resource modeling and engineering design studies are underway with the Company’s key technical consultants including RESPEC, WSP, and KCA.”
Revival Gold Advances Mercur With A View To Be Utah’s Next New Operating Gold MineMay 11, 2026Report authorBrunswick Exploration
“: Regional Map of the Anatacau Main and Anatacau West Projects Table 2: Drill Hole Collars (UTM Nad83, Zone 18N) Note SEC Technical Report Summary for the James Bay Lithium Project prepared by SLR Consulting (Canada), Wave International Pty and WSP Canada for Arcadium Lithium Plc., dated August 31 2023.”
BRUNSWICK EXPLORATION DRILLS 17.7 METERS AT 1.10% LI2O WITHIN 123 METERS AT 0.72% LI2OApr 29, 2026Report authorNevada Lithium Resources Inc.Bonnie Claire Project
“The Company retained WSP to undertake a high-level desktop review to evaluate the suitability of the HBHM method which was identified as the preferred mining method in the Company’s 2025 (“ PEA ”).”
Independent Analysis Supports Hydraulic Borehole Mining Method Applicability for Bonnie Claire Lithium ProjectApr 29, 2026ConsultantNevada Lithium Resources Inc.Bonnie Claire Project
“Vancouver, British Columbia – April 29,2026 – Nevada Lithium Resources Inc. (TSXV: NVLH; OTCQB: NVLHF; FSE: 87K) (“ Nevada Lithium ” or the “ Company ”) is pleased to announce the results of an independent technical due diligence review conducted by WSP UK Limited (“ WSP ”) on the Hydraulic Borehole Mining Method (“ HBHM ”) at its 100% owned Bonnie Claire Lithium project (the “ Project ” or “ Bonnie Claire ”), located in Nye County, Nevada.”
Independent Analysis Supports Hydraulic Borehole Mining Method Applicability for Bonnie Claire Lithium ProjectApr 20, 2026Report authorRevival GoldBeartrack-Arnett Project
“In the Joss area, the project hosts an underground Inferred Mineral Resource of 6,745,000 tonnes grading 4.05 grams gold per tonne for 877,000 ounces of gold that is not included in the 2023 first phase open pit, heap leach PFS economics (see “Preliminary Feasibility Study NI 43-101 Technical Report on the Beartrack-Arnett Heap Leach Project, Lemhi County, Idaho, USA” prepared by Kappes, Cassidy & Associates, IMC, KCH and WSP dated August 2nd, 2023, for further details).”
Revival Gold Expands Drilling Program After Intersecting 6.4 g/T Gold Over 19 Meters at Beartrack-ArnettApr 15, 2026Report authorBrunswick Exploration
“Note SEC Technical Report Summary for the James Bay Lithium Project prepared by SLR Consulting (Canada), Wave International Pty and WSP Canada for Arcadium Lithium Plc., dated August 31 2023.”
BRUNSWICK EXPLORATION DRILLS 90.5 METERS AT 1.31% LI2O AT ANATACAU PROJECT