Service company
DRA Global
Named in junior miners' releases
53 releases from 8 companies named DRA Global in the last 12 months: report author 50, consultant 3.
| Company | Releases | Latest |
|---|---|---|
| Frontier LithiumFL | 19 | Nov 12, 2026 |
| NeoTech Metals Corp.NTMC | 13 | Nov 16, 2026 |
| Newcore GoldNCAU | 13 | Oct 28, 2026 |
| RPX Gold Inc.RPX | 4 | May 20, 2026 |
| Koryx CopperKRY | 1 | Oct 8, 2026 |
| Salazar Resources Ltd.SRL | 1 | Jul 15, 2026 |
| Avalon Advanced Materials Inc.AVL | 1 | Jan 19, 2026 |
| American Lithium CorpLI | 1 | Dec 16, 2025 |
What the releases say
Nov 16, 2026Report authorNeoTech Metals Corp.Hecla-Kilmer PROJECT
“Neotech Metals Engages DRA to Deliver Maiden Resource Estimate and Preliminary Economic Assessment at Hecla-Kilmer”
Neotech Metals Corp. Completes Inaugural Drilling Program at Torrance and Sampling Program at Hecla-KilmerNov 12, 2026Report authorFrontier Lithium
“A 2025 Mine and Mill Feasibility Study (FS), prepared by DRA Americas Inc. and entitled National Instrument 43-101 Technical Report FS PAK Lithium Project, Mine and Mill, outlines a 31-year Project life with an after-tax net present value of C$932 million at an 8% discount rate and an after-tax internal rate of return of 17.9%.”
FRONTIER LITHIUM HIGHLIGHTS CONTINUED ADVANCEMENT THROUGH 1P1P TO SUPPORT REGIONAL ROAD INFRASTRUCTUREOct 28, 2026Report authorNewcore GoldEnchi Project
“The Mineral Reserve Estimate was prepared for Newcore by Grant Carlson, P. Eng. of Fuse Advisors (part of SLR); the Mineral Resource Estimate was prepared for Newcore by Ryan Wilson, P. Geo, Matthew Halliday, P. Geo, Schadrac Ibrango, P. Geo of DRA Americas Inc. These individuals are independent qualified persons ("QP") within the meaning of NI 43-101.”
Newcore Gold Drilling Intersects 2.16 g/t Gold over 37.0 Metres, Including 5.10 g/t Gold over 9.0 Metres, at the Enchi Gold Project, GhanaOct 13, 2026Report authorNeoTech Metals Corp.Hecla-Kilmer PROJECT
“sment at Hecla-Kilmer October 13, 2026 Vancouver, British Columbia , October 13, 2026 – Neotech Metals Corp. (CSE: NTMC | OTC: NTMFF | FRA: V690) (“ Neotech ” or the “ Company “) is pleased to announce that it has entered into an agreement with DRA Global Limited ( “DRA” ) to conduct both the Maiden Resource Estimate (“ MRE ”) and Preliminary Economic Assessment (“ PEA ”) on the Company’s 100% owned Hecla-Kilmer Rare Earth project located in Ontario, Canada (the “ Project ” or “ Hecla Kilmer ”).”
Neotech Metals Engages DRA to Deliver Maiden Resource Estimate and Preliminary Economic Assessment at Hecla-KilmerOct 8, 2026ConsultantKoryx CopperHaib Copper Project
“I am very pleased with the performance of our in-house study team, working in conjunction with our lead engineering consultants, DRA Global Limited, and a range of experienced Namibian technical consultants who are all working very hard to deliver a PFS, based on credible assumptions and detailed specialist technical studies.”
Koryx Copper Provides Interim Update on Pre-Feasibility Study Progress for the Haib Copper Project in Southern NamibiaOct 6, 2026Report authorNewcore GoldEnchi Project
“The Mineral Reserve Estimate was prepared for Newcore by Grant Carlson, P. Eng. of Fuse Advisors (part of SLR); the Mineral Resource Estimate was prepared for Newcore by Ryan Wilson, P. Geo, Matthew Halliday, P. Geo, Schadrac Ibrango, P. Geo of DRA Americas Inc. These individuals are independent qualified persons ("QP") within the meaning of NI 43-101.”
Newcore Gold Drilling Intersects 1.16 g/t Gold over 41.0 Metres, Including 2.54 g/t Gold over 13.0 Metres, at the Enchi Gold Project, GhanaSep 21, 2026Report authorFrontier Lithium
“A 2025 Mine and Mill Feasibility Study (FS), prepared by DRA Americas Inc. and entitled National Instrument 43-101 Technical Report FS PAK Lithium Project, Mine and Mill, outlines a 31-year Project life with an after-tax net present value of C$932 million at an 8% discount rate and an after-tax internal rate of return of 17.9%.”
FRONTIER LITHIUM ANNOUNCES CLOSING OF CONVERTIBLE LOAN RESTRUCTURINGSep 17, 2026Report authorNewcore GoldEnchi Project
“The Mineral Reserve Estimate was prepared for Newcore by Grant Carlson, P. Eng. of Fuse Advisors (part of SLR); the Mineral Resource Estimate was prepared for Newcore by Ryan Wilson, P. Geo, Matthew Halliday, P. Geo, Schadrac Ibrango, P. Geo of DRA Americas Inc. These individuals are independent qualified persons ("QP") within the meaning of NI 43-101.”
Newcore Gold Drilling Intersects 2.59 g/t Gold over 69 Metres, Including 6.41 g/t Gold over 24 Metres, at the Enchi Gold Project, GhanaSep 14, 2026Report authorFrontier Lithium
“A 2025 Mine and Mill Feasibility Study (FS), prepared by DRA Americas Inc. and entitled National Instrument 43-101 Technical Report FS PAK Lithium Project, Mine and Mill, outlines a 31-year Project life with an after-tax net present value of C$932 million at an 8% discount rate and an after-tax internal rate of return of 17.9%.”
PAK PROJECT SELECTED FOR CANADA INVESTMENT SUMMIT PROSPECTUS AND ONLY LITHIUM PROJECT INCLUDED IN ONTARIO’S DEAL BOOKSep 10, 2026Report authorFrontier Lithium
“se | Sudbury | September 10, 2026 | TSX.V:FL; FRA:HL2; OTCQB: LITOF Frontier Lithium is pleased to announce the award of an updated feasibility study for the mine and mill stage of its PAK Lithium Project (the "Project") in northwestern Ontario to DRA Americas Inc. The feasibility study update will incorporate work completed since the Company's 2025 Feasibility Study ("FS") including the integration of value engineering results achieved to date, and focus on opportunities to optimize project eco”
FRONTIER LITHIUM INITIATES MINE AND MILL FEASIBILITY STUDY UPDATE FOR THE PAK LITHIUM PROJECTAug 26, 2026Report authorFrontier Lithium
“A 2025 Mine and Mill Feasibility Study (FS), prepared by DRA Global and entitled National Instrument 43-101 Technical Report FS PAK Lithium Project, Mine and Mill, outlines a 31-year Project life with an after-tax net present value of CA $932 million at an 8% discount rate and an after-tax internal rate of return of 17.9%.These results were disclosed in a press release dated May 28, 2025, and the accompanying technical report was filed on July 9, 2025 on SEDAR+ ( www.sedarplus.ca ).”
FRONTIER LITHIUM REPORTS FIRST QUARTER RESULTS AND RECENT HIGHLIGHTSAug 13, 2026Report authorFrontier Lithium
“A 2025 Mine and Mill Feasibility Study, prepared by DRA and entitled National Instrument 43-101 Technical Report FS PAK Lithium Project, Mine and Mill, outlines a 31-year Project life with an after-tax net present value of $932 million at an 8% discount rate and an after-tax internal rate of return of 17.9%.These results are disclosed in a press release dated May 28, 2025, and the accompanying technical report was filed on July 9, 2025 on SEDAR+ ( www.sedarplus.ca ).”
FRONTIER LITHIUM ANNOUNCES PROPOSED AMENDMENTS TO CONVERTIBLE LOANAug 7, 2026Report authorNewcore GoldEnchi Project
“DRA Americas Inc.: Ryan Wilson, P. Geo., Matthew Halliday, P. Geo., Schadrac Ibrango, P. Geo., (Geology and Mineral Resources), Claude Bisaillon, P. Eng. (Geotechnical Pit Design Criteria).”
Newcore Gold Files Pre-Feasibility Study Technical Report for the Enchi Gold Project, GhanaAug 6, 2026Report authorFrontier Lithium
“A 2025 Mine and Mill Feasibility Study, prepared by DRA and entitled National Instrument 43-101 Technical Report FS PAK Lithium Project, Mine and Mill, outlines a 31-year Project life with an after-tax net present value of $932 million at an 8% discount rate and an after-tax internal rate of return of 17.9%.These results are disclosed in a press release dated May 28, 2025, and the accompanying technical report was filed on July 9, 2025 on SEDAR+ ( www.sedarplus.ca ).”
FRONTIER LITHIUM SIGNS NRCAN CONTRIBUTION AGREEMENT TO ADVANCE BY-PRODUCT VALORIZATION AT THE PAK LITHIUM PROJECTJul 29, 2026Report authorNewcore GoldEnchi Project
“The Mineral Resource Estimate is from the technical report titled "Technical Report Mineral Resource Estimate Update, Enchi Gold Project, Ghana" dated May 1, 2026, with an effective date of March 18, 2026, prepared for Newcore by Ryan Wilson, P. Geo, Matthew Halliday, P. Geo, Schadrac Ibrango, P. Geo of DRA Americas Inc. in accordance with NI 43-101, and is available under the Company’s profile on SEDAR+ at www.sedarplus.ca .”
Newcore Gold Drilling Intersects 3.67 g/t Gold over 25.3 Metres, at the Enchi Gold Project, GhanaJul 27, 2026Report authorNeoTech Metals Corp.Hecla-Kilmer PROJECT
“Neotech Metals Engages DRA to Deliver Maiden Resource Estimate and Preliminary Economic Assessment at Hecla-Kilmer”
Neotech Metals Commences Metallurgical Process Development Program with Dorfner AnzaplanJul 15, 2026Report authorSalazar Resources Ltd.Curipamba
“Analysis of Economic Data for the El Domo Project Prices Assumed, DRA, October 26, 2021: US$1,700 Oz of Gold, US$23 Oz of Silver, 7,716 US$/t copper (US$3.5 /lb), US$0.95 /lb of lead, US$1.20 /lb of zinc Prices Assumed, SRK, December 31, 2025: US$2,600 Oz of Gold, US$31 Oz of Silver, 9,250 US$/t copper, 2,000 US$/t lead, 2,800 US$/t zinc Next Steps In accordance with National Instrument 43-101, the Company will file a technical report prepared for and addressed to Salazar, supporting the disclos”
Salazar Resources Reports El Domo after-Tax NPV (8% Discount Rate) of US$573 Million, Representing a 121% Increase Compared to the October 2021 Feasibility StudyJul 14, 2026Report authorFrontier Lithium
“A 2025 Mine and Mill Feasibility Study, prepared by DRA and entitled National Instrument 43-101 Technical Report FS PAK Lithium Project, Mine and Mill, outlines a 31-year Project life with an after-tax net present value of $932 million at an 8% discount rate and an after-tax internal rate of return of 17.9%.These results are disclosed in a press release dated May 28, 2025, and the accompanying technical report was filed on July 9, 2025 on SEDAR+ ( www.sedarplus.ca ).”
FRONTIER LITHIUM FILES YEAR-END MARCH 31, 2026 FINANCIAL STATEMENTSJun 30, 2026Report authorNewcore GoldEnchi Project
“The Mineral Resource Estimate is from the technical report titled "Technical Report Mineral Resource Estimate Update, Enchi Gold Project, Ghana" dated May 1, 2026, with an effective date of March 18, 2026, prepared for Newcore by Ryan Wilson, P. Geo, Matthew Halliday, P. Geo, Schadrac Ibrango, P. Geo of DRA Americas Inc. in accordance with NI 43-101, and is available under the Company’s profile on SEDAR+ at www.sedarplus.ca .”
Newcore Gold Drilling Intersects 3.51 g/t Gold over 21.0 Metres, Including 5.91 g/t Gold over 9.0 Metres, at the Enchi Gold Project, GhanaJun 24, 2026Report authorNewcore GoldEnchi Project
“The PFS was supported by Fuse Advisors Inc. (Part of SLR Consulting) for mine engineering, open pit optimization and design, mine planning, Mineral Reserve Estimate; Knight Piésold Ghana Ltd. for tailings storage facility design, project-wide hydrogeology, site water management, reclamation; and DRA Americas Inc. for Mineral Resource Estimate, pit geotechnical and hydrogeological model.”
Newcore Gold Announces Robust Pre-Feasibility Study for the Enchi Gold Project, GhanaJun 22, 2026Report authorNeoTech Metals Corp.Hecla-Kilmer PROJECT
“Neotech Metals Engages DRA to Deliver Maiden Resource Estimate and Preliminary Economic Assessment at Hecla-Kilmer”
Neotech Metals Approved for $500k CMIF GrantJun 16, 2026Report authorNewcore GoldEnchi Project
“The Mineral Resource Estimate is from the technical report titled "Technical Report Mineral Resource Estimate Update, Enchi Gold Project, Ghana" dated May 1, 2026, with an effective date of March 18, 2026, prepared for Newcore by Ryan Wilson, P. Geo, Matthew Halliday, P. Geo, Schadrac Ibrango, P. Geo of DRA Americas Inc. in accordance with NI 43-101, and is available under the Company’s profile on SEDAR+ at www.sedarplus.ca .”
Newcore Gold Drilling Intersects 1.37 g/t Gold over 24.0 Metres, Including 1.93 g/t Gold over 12.0 Metres, at the Enchi Gold Project, GhanaMay 27, 2026Report authorNeoTech Metals Corp.
“Neotech Metals Engages DRA to Deliver Maiden Resource Estimate and Preliminary Economic Assessment at Hecla-Kilmer”
Neotech Metals Announces Upsized Private Placement OfferingMay 20, 2026Report authorRPX Gold Inc.Wawa Gold Project
“The PEA was prepared by DRA Americas Inc. (“DRA”) in accordance with National Instrument 43-101 (“NI 43-101”) and was supported by an updated 2026 Mineral Resource Estimate (“2026 MRE”) prepared by WSP Canada Inc., which reflected a 48% increase in indicated ounces compared to the 2024 MRE.”
RPX GOLD PROVIDES CORPORATE UPDATE AND NEXT STEPS TO ADVANCE THE WAWA GOLD PROJECT TOWARDS A PRE-FEASIBILITY STUDYMay 20, 2026Report authorFrontier Lithium
“A 2025 Mine and Mill Feasibility Study (FS), prepared by DRA Global Limited and entitled National Instrument 43-101 Technical Report FS PAK Lithium Project, Mine and Mill, outlines a 31-year Project life with an after-tax net present value of $932 million at an 8% discount rate and an after-tax internal rate of return of 17.9%.These results have been disclosed in the Company's press release dated May 28, 2025, and the accompanying technical report was filed on SEDAR+ ( www.sedarplus.ca ) on July”
FRONTIER BOLSTERS EXECUTIVE ADVISORY COUNCIL TO DRIVE EXECUTION READINESS AND PROJECT FINANCING STRATEGY
In the firm's words
Originate – Project Development
Specialists in engineering consulting to advance conceptual, pre-feasibility and bankable feasibility studies through to successful project implementation.
Deliver – Project Delivery
EPCM, EPC and hybrid solutions with engineering design, project management and construction management.
Optimise – Operations & Maintenance
Insight, analysis, strategy and advanced technology to reduce operating and maintenance costs while enhancing productivity.
Advise
Portfolio excellence, operational readiness, operational excellence, asset care and sustainability solutions.
MOMS (Mine Operations Management System)
Operational intelligence system for mining and mineral processing companies.
Geology and exploration services
Offered within consulting under Originate.