Key facts
| Company | Surge Copper Corp. (TSXV: SURG) |
|---|---|
| Commodity | Gold |
| Location | USA |
| Stage | Early exploration |
About Berg Project
As released on June 13, 2023, the first ever publicly available economic study (PEA) for the Berg project lays out a 43-101 compliant Project plan showing a standalone Open Pit Copper Mine and concentrator facility lying within one of the largest undeveloped Copper belts in British Columbia. The project being within the traditional territory of the Wet'suwet'en First Nation and Wet'suwet'en peoples along with the Cheslatta Carrier Nation Surge looks to partner with the local communities and Nations make use of existing infrastructure such as road access and the fully hydroelectric green power grid in BC, to rapidly advance the project to the Pre-Feasibility (PFS) level of study to declare the first ever reserves for the Berg project in the near future.
News releases2 on file
Surge Copper Appoints Jennifer Anthony as Vice President, Environment and Regulatory Affairs
Jennifer Anthony has been appointed Vice President, Environment & Regulatory Affairs, effective January 12, 2026, leading environmental assessment, permitting, compliance, baseline programs and Indigenous and community engagement as the Berg Project in British Columbia advances through pre-feasibility. She previously served as Assistant Deputy Minister, Permitting Transformation with BC's Ministry
ManagementSurge Copper Advances Berg Toward Pre-Feasibility with Successful 2025 Drilling and Data Validation Program
Results from the 2025 program at the 100%-owned Berg copper-molybdenum-silver project in central British Columbia include 4,143 metres of diamond drilling across 4 resource conversion holes, 4 acid rock drainage holes and 11 geotechnical holes, plus re-assay of 17 historic holes drilled between 1964 and 1973. Hole BRG25-259 returned 235 metres of 0.31% CuEq from 278 metres, and re-assayed hole BRG
Corporate