Key facts
| Company | Q2 Metals Corp. (TSXV: QTWO) |
|---|---|
| Commodity | Lithium |
| Location | Canada |
| Stage | Early exploration |
About Cisco Lithium Project
The Cisco Project is situated along the Frotet Evans Greenstone Belt, comprised of a volcanic package dominated by mafic to felsic metavolcanic rocks, which is also host to the Sirmac and Moblan lithium deposits, located 130 km and 180 km away, respectively.
News releases46 on file
Q2 Metals Files Technical Report for the Mineral Resource Estimate for the Cisco Lithium Project
A NI 43-101 technical report titled Mineral Resource Estimate for the Cisco Lithium Project, with an effective date of April 20, 2026 and signed June 3, 2026, has been filed on SEDAR+ by Q2 Metals Corp. The Cisco Deposit, in the James Bay region of Quebec, hosts a pit-constrained Inferred resource of 270 Mt at 1.36% Li2O (0.4% cut-off) plus 24 Mt at 1.34% Li2O underground-constrained (0.7% cut-off
Resource updateQ2 Metals Announces Inferred Mineral Resource Estimate on the Cisco Lithium Project with 295 Million Tonnes Grading 1.36% Li2O
An inaugural NI 43-101 inferred mineral resource estimate for the Cisco Lithium Project in the Eeyou Istchee James Bay region of Quebec totals 295 Mt at 1.36% Li2O, comprising 270 Mt at 1.36% Li2O pit-constrained at a 0.4% cut-off and 24 Mt at 1.34 Li2O underground at a 0.7% cut-off, for 9.9 Mt contained LCE. The estimate, by BBA with an effective date of April 20, 2026, used assays from 75 drillh
Resource updateQ2 Metals Appoints Keith Phillips as Executive Chair of the Board of Directors
Director Keith Phillips has been appointed Executive Chair of Q2 Metals' board, effective immediately; he joined the board in October 2025 after serving as CEO of Piedmont Lithium from 2017 until its 2025 merger with Sayona Mining. Winter drilling has re-commenced at the Cisco Lithium Project in Quebec's James Bay region, focused on infill drilling for a Preliminary Economic Assessment targeted fo
ManagementQ2 Metals Announces Results of AGM and Year-End Webcast
All matters brought before Q2 Metals Corp.'s Annual General Meeting held December 9, 2025 were approved, with 73,179,989 common shares represented, or 38.62% of outstanding shares as at the October 24, 2025 record date. The company will host a live year-end webcast on Thursday, December 18 at 08:00 AM PST (11:00 AM EST), reviewing 2025 performance and 2026 plans, followed by a Q&A. Its Cisco Lithi
CorporateQ2 Metals Reports Multiple Wide, Mineralized Intercepts from Infill Drilling at the Cisco Lithium Project, Including 95.1 m and 81.9 m each Grading 1.56% Li20
Infill drilling at the Cisco Lithium Project in the Eeyou Istchee James Bay region of Quebec returned intercepts including 95.1 m at 1.56% Li2O, 81.9 m at 1.56% Li2O and 66.5 m at 1.26% Li2O in hole CS25-040, 53.9 m at 1.53% Li2O in CS25-041, 32.7 m at 1.56% Li2O in CS25-042 and 38.2 m at 1.47% Li2O in CS25-043. Assays are pending on more than 20 holes, including CS25-044, which cut 457.4 m of con
Drill resultsQ2 Metals Intercepts 179 Metres of Continuous Spodumene Pegmatite North of the Mineralized Zone at the Cisco Lithium Project in Quebec, Canada
Drill hole CS25-065 at the Cisco Lithium Project in the Eeyou Istchee James Bay region of Quebec cut five spodumene pegmatite intervals, including a 179.2-metre continuous interval at 50 to 180 metres depth, north of the known mineralized zone; hole CS25-063 cut 15 intervals including one 75.4 metres wide. Since September 10, 2025, 7,781 metres over 21 holes were drilled, bringing totals to 67 hol
Drill resultsQ2 Metals Appoints Simon Gaivin as Vice President – ESG, Cisco Lithium Project Named as Finalist for Discovery of the Year by AEMQ
Simon Gaivin has been appointed Vice President, ESG at Q2 Metals, overseeing environment, community and First Nation relations and leading the company's ECOLOGO UL 2723 certification process; he joined the company in November 2024. The Cisco Lithium Project in Eeyou Istchee James Bay, Quebec has been named a finalist for the Association de l'exploration minière du Québec Discovery of the Year, to
ManagementQ2 Metals Increases Drill Activity and Provides Exploration Update on the Cisco Lithium Project in Quebec, Canada
Drilling at the Cisco Lithium Project in the Eeyou Istchee James Bay region of Quebec has totalled 46 holes for 20,138 metres since June 2025, with assays pending on all summer holes. Three drill rigs are operating and a fourth is expected in November 2025, with infill drilling of the 1.5 km mineralized zone aimed at an initial inferred mineral resource estimate. A $26 million flow-through private
Drill resultsQ2 Metals Metallurgy Confirms Cisco Lithium Project Suitability for DMS Processing
First-phase metallurgical testing on 2024 drill core from the Cisco Lithium Project in Eeyou Istchee James Bay, Quebec returned lithium recoveries of 69.6% to 74.1% at a 2.80 SG cut point and -6.3 mm crush size: Composite 18 at 74.1% recovery producing a 5.69% Li2O concentrate with 0.42% Fe2O3, Composite 21 at 69.6% and 5.08% Li2O with 0.55% Fe2O3, and Composite 23 at 71.6% and 5.60% Li2O with 0.4
Study results