Key facts
| Company | Lode Gold (TSXV: LOD) |
|---|---|
| Commodity | Gold |
| Location | California, USA |
| Stage | Early exploration |
About Fremont Gold
FREMONT – HIGH-GRADE TARGET IN MOTHER LODE (50,000,000 Oz produced)Underpinned by 1+2 Moz, NI 43-101 2023 PEA
News releases34 on file
Lode Gold Initiates Exploration to Evaluate Upside Potential at Historic High-Grade Mines Within Fremont Gold Mine
Lode Gold is initiating exploration to evaluate additional gold potential at its 100%-owned Fremont Gold Mine on privately owned patented land in Mariposa County, California. The work will cover all seven deposits and nine additional exploration targets, and the company is reviewing French Mine, a historical high-grade mine, as the first satellite deposit under review.
Drill resultsLode Gold completes first six holes of expanded 20-hole drill program at Fremont Gold Mine
The first six holes of a 20-hole drill campaign have been completed at the Fremont Gold Mine in Mariposa County, California, with the program expanded by ten holes to 4,200 metres (13,780 feet). Holes PT-J_001 through PT-J_006 were drilled at an azimuth of 240° and dip of -75° to target depths of 105.0 to 171.3 metres for metallurgy and geotechnics, using PQ-diameter core. Samples from the first t
Drill resultsLode Gold Appoints Patrick W. Garretson as Senior Technical Advisor – Adds Major Mining Company Experience to Fremont Gold Mine
Patrick W. Garretson has been appointed Senior Technical Advisor to the Fremont Gold Mine in Mariposa, California. Garretson has 35 years of mining experience with South32, Newmont, Goldcorp, Barrick and BHP Billiton, most recently as Project Lead managing Technical Services and the Taylor-Hermosa Feasibility Study for South32's Hermosa Project in Arizona. Lode Gold said upcoming Fremont milestone
ManagementLode Gold Submit Documents To Discharge Senior Secured Debt And Advances Fremont Gold Mine Into Next Phase Of Growth
All discharge documents have been submitted to release Lode Gold from its senior secured debt obligations, after which the Fremont Gold Mine in Mariposa, California, previously pledged as security, will be free of encumbrance and the Company and its subsidiaries will have no outstanding loan obligations. Over the next six months Lode Gold plans to develop a preliminary mine plan for Fremont to for
NewsLode Gold Expands Drill Program at Flagship Fremont Gold mine Project
An expanded drill program at the 100%-owned Fremont Gold Mine in Mariposa County, California will add four drill pads — PT-J 011, PT-J 012, HGD-002 and HGD-003 — through an amendment to the previously approved Authorized Use Permit. PT-J 011 and PT-J 012 are metallurgical core holes collecting PQ-diameter core for recovery mapping and geometallurgical domain modeling, while HGD-002 and HGD-003 are
Drill resultsLode Gold Further Strengthens Engineering, Geological & Permitting Team
Mine engineer Roberto Llovet Vázquez has been added to the Technical Advisory Board for the Fremont Gold Mine project in Mariposa, California. He is a Mine Engineer from the Polytechnic University of Madrid with over a decade of underground mining operations experience and has served as COO at underground operations in Spain, Peru and Mexico. The technical and permitting advisory team also include
ManagementLode Gold Commences Metallurgical Drilling At Fremont Gold Mine, Mariposa, Ca
Metallurgical drilling has begun at the Fremont Gold Mine in Mariposa, California, with an engineering firm engaged to oversee PQ core sampling protocols, optimize multi-phase metallurgical flowsheets, and evaluate processing configurations to manage CAPEX and OPEX. Trade-off studies will compare gravity versus flotation recovery. The broader exploration and drilling program at Fremont is schedule
CorporateLode Gold Receives Three-Year Drill Permit At Flagship Fremont Gold Mine, California
Mariposa County has approved a three-year Administrative Use Permit allowing surface exploration and drilling on Lode Gold's 100% owned patented land at the Fremont Gold Mine in Mariposa County, California. The permit enables a planned 3,500 to 4,500-metre drilling program for the second half of 2026, covering metallurgical, geotechnical, hydrogeological and infill drilling at the Pine Tree–Joseph
CorporateLode Gold Completes Full Repayment Of Fremont Gold Mine Property Secured Loan Ahead Of Schedule
Subsidiary Fremont Gold Mining LLC's senior secured loan, backed by the Fremont Gold Mine property in Mariposa County, California, has been fully repaid with approximately US$3.6 million of principal and accrued interest, ahead of its amended May 1, 2028 maturity. The repayment releases the property pledge and leaves Lode Gold and its subsidiaries with no loan obligations, and qualified the compan
FinancingLODE GOLD FURTHER UPSIZES PRIVATE PLACEMENT TO $9.872 MILLION AND CLOSES FINAL TRANCHE
Lode Gold's non-brokered private placement was upsized to $9,782,000, with the second and third (final) tranches closing through the issuance of 3,488,261 and 2,648,997 units at 27 cents per unit for additional gross proceeds of $941,830 and $715,229. Total proceeds across all three tranches were $9,715,229 from 35,982,331 units, each with a warrant exercisable at 45 cents for 36 months; insiders
FinancingLode Gold upsizes Private placement to $9M; closes first Tranche $8M
A non-brokered private placement has been upsized to $9 million, with a first tranche of 29,845,074 units at $0.27 per unit closing for gross proceeds of approximately $8.06 million; the second and final tranche is expected to close on or before July 31, 2026. Each unit includes one share and one warrant exercisable at $0.45 for 36 months, with acceleration if shares close at or above $0.80 for 10
FinancingLode Gold Engages Contractor to Initiate Drilling at Fremont Gold Mine
American Drilling Corp., a division of American Mining and Tunneling, has been engaged to carry out the 2026 drill program at the Fremont Gold Mine in Mariposa County, California, with personnel and equipment mobilizing before the end of July 2026. Phase 1 comprises 3,500 m of resource definition drilling: 1,400 m metallurgical and geotechnical and 600 m hydrological and infill at Pine Tree–Joseph
Drill resultsLode Gold Announces Non-Brokered Private Placement Of $7 Million Financing With Follow-On Investment From Lead Investor Coast Capital
A non-brokered private placement of up to $7,000,000 through the issuance of up to 25,925,926 units at $0.27 per unit was announced, each unit comprising one common share and one warrant exercisable at $0.45 for three years, with an acceleration right if shares trade at $0.80 or more for 10 consecutive days. Coast Capital LLC, an insider holding over 18%, will participate to increase its stake to
FinancingLode Gold Files NI 43-101 Technical Report for the Fremont Gold MINE on SEDAR+
An updated NI 43-101 technical report for the Fremont Gold Property in Mariposa County, California has been filed on SEDAR+, following the June 29, 2026 news release. At a 0.82 g/t cut-off, the resource estimate totals 19.9 Mt at 1.79 g/t Au for 1.15 Moz indicated and 38.5 Mt at 1.73 g/t Au for 2.17 Moz inferred. Pseudo-drillhole analysis showed grams x metre values of 79 to 87 g*m from 0 g/t to 3
Study resultsLode Gold Commences Engineering Studies at Fremont Gold Mine, Mariposa CA
Technical engineering studies and a project readiness assessment have been initiated at the Fremont Gold Mine in Mariposa County, California, to establish a technical baseline ahead of mine plan development and permitting. The work will review historical mining, metallurgical and engineering data, identify data gaps, and make recommendations supporting future NI 43-101 reporting and a PFS. The 202
Study resultsLode Gold Invites Shareholders to Fremont Gold Mine Webinar: 2026 MRE Delivers 1.1 Moz M&I Gold, path to value creation – june 4, 2026, AT 12pM PACIFIC (pst)
A technical webinar on the Fremont Gold Mine in Mariposa County, California will be held Thursday June 4, 2026 at 12 p.m. Pacific Standard Time, hosted via Zoom with a live Q&A and a replay to follow on the company website. Presenters include Technical Advisor Carlos Saban, VP Exploration Gary Wong, P.Eng., and CEO Wendy T. Chan, covering the updated MRE, plans toward a Preliminary Feasibility Stu
CorporateLode Gold’s New Mineral Resource Estimate: 1.11 MoZ of Gold – 18.8 mt at 1.84 g/t au (Measured & Indicated) and 1.99 MoZ of Gold (Inferred) – 33.1 mt at 1.86 g/t Au at Fremont Gold Mine
An updated NI 43-101 mineral resource estimate for the 100%-owned Fremont Gold Mine in Mariposa County, California, at a 1 g/t Au cut-off, defines 18,776 kt Indicated at 1.84 g/t Au for 1,110,444 oz and 33,107 kt Inferred at 1.86 g/t Au for 1,978,568 oz, based on three of seven deposits. The estimate reflects a pivot to bulk underground mining, replacing the 2025 model's 3.0 g/t cut-off and 133,00
Resource updateLode Gold Extends Construction Loan Agreement until 2028
The maturity date of Lode Gold's construction loan with Romspen Investment Corporation has been extended to May 1, 2028 from October 31, 2026 under an amendment to the loan agreement. A 2% extension fee applies only to the original principal, with half rebated if the loan is repaid on or before May 1, 2027. The company said the extension supports continued advancement of the Fremont Gold mine in M
FinancingLode Gold Submits Drill Permit Application At Fremont Gold Mine
A permit application for surface exploration drilling at the Fremont Gold Mine Project in Mariposa County, California has been submitted, prepared under county requirements, SMARA and subject to CEQA environmental review. The program would use existing drill pads and a centrifuge-based system for drilling fluids instead of settling ponds, and the permit, once approved, is expected to be valid for
CorporateLode GoLd Fremont Gold Mine Fast-Tracks Development with 3,500 m for Prelimenary Feasibility Study
Lode Gold outlined an accelerated plan for its Fremont Gold Project in Mariposa County, California, with a 3,500 m drill program in 2026 to support a Preliminary Feasibility Study targeted for completion by Q2 2027. The program comprises 1,400 m of metallurgical and geotechnical drilling and 600 m of hydrological and infill drilling at Pine Tree–Josephine, plus 1,500 m of step-out drilling at Chic
Study resultsLode Gold Completes Environmental Baseline Data Consolidation FOR the Fremont Gold MINE Project
A consolidation of historical and recent environmental baseline data for the Fremont Gold Mine Project in Mariposa County, California has been completed, integrating groundwater and surface water monitoring from 1986–1987, 2022 and 2025 into a single validated database. Waters are classified as calcium-magnesium-bicarbonate type with neutral pH; arsenic was detected below the drinking water Maximu
CorporateLode Gold Initiates New Mineral Resource Block Model for the FREMONT GOLD MINE, CALIFORNIA
A new Mineral Resource Estimate block model is underway for the Fremont Gold Project in Mariposa, California, incorporating over 7,000 historical underground channel samples digitized from original mine level maps and plans. The model will re-interpret the deposit as a continuous mineralized body rather than discrete vein-only domains and apply a lower cut-off grade based on updated underground mi
Resource updateLode gold initiates permit process for surface drilling AT FREMONT GOLD MINE
A legal and permitting advisory group based in San Francisco has been engaged to support permitting in Mariposa County, California for a drill program at the Fremont Gold Mine project. The permit application will seek authorization for ten surface drill holes totalling about 1,500 m, aimed at collecting material for metallurgical test work and geotechnical data for a rock mechanics study ahead of
CorporateLODE GOLD ENTERS INTO EXCLUSIVE LOI WITH A MINING COMPANY TO ADVANCE FREMONT GOLD PROJECT AND REPAY DEBT
Lode Gold Resources has signed an exclusive, confidential letter of intent with an unnamed mining company for its Fremont Gold Project in Mariposa, California, with a 45-day exclusivity and standstill period running to January 16, 2026. The contemplated arrangement would provide capital to advance Fremont and repay outstanding debt secured by the asset. Work to upgrade resources to Measured & Indi
AcquisitionLODE GOLD PROVIDES YEAR END REVIEW – UPCOMING MILESTONES AND KEY CATALYSTS ON FREMONT GOLD MINE
A year-end review of the Fremont Gold Project in Mariposa, California sets out 2025 milestones and 2026 plans. The 2025 MRE reports 35.93 Mt at 2.73 g/t Au for 3.16 Moz contained gold at a 1 g/t cut-off, and an internal scoping study evaluated a 100% underground operation scaling from 4,000 tpd to 6,000 tpd. Plans include 8,500 m of drilling and a PFS targeted for end-2026/early 2027, a 300-500 tp
CorporateLode Gold Adds 5,000 Historical Channel Samples to Upgrade Mineral Resource Estimate at Fremont Gold Mine, California
More than 5,000 historical underground samples have been recovered from legacy geological maps and sections at the past-producing Fremont Gold mine in Mariposa County, California, increasing the validated sample database from 3,212 to 8,593 records, with analysis underway. The 5,728 recovered underground samples include channel cuts, short wall-rock drill holes, rib channels and bulk car sampling,
Drill results