JUNIOR MININGINTELLIGENCE
CompaniesNewsProspectors EXLive NowMedia
JUNIOR MININGINTELLIGENCE
CompaniesNewsProspectors EXLive NowMedia
  1. Home
  2. /
  3. Companies
  4. /
  5. Purepoint Uranium Group Inc.
  6. /
  7. Hook Lake Project

Hook Lake Project

Gold · Canada

Hook Lake Project is a gold project in Canada, at the early exploration stage, held by Purepoint Uranium Group Inc. (TSXV: PTU).

13 news releases are filed under it here.

← Purepoint Uranium Group Inc. profileCompany website ↗

Key facts

CompanyPurepoint Uranium Group Inc. (TSXV: PTU)
CommodityGold
LocationCanada
StageEarly exploration

News releases13 on file

  1. Apr 4, 2024

    Purepoint Uranium Discovers New Lightning Zone Grading 0.29% U3O8 over 0.9 Metres as it Completes 2024 Winter Drill Program at Hook Lake Joint Venture

    Drilling at the Carter Corridor of the Hook Lake joint venture in Saskatchewan's southwestern Athabasca Basin intersected 0.29% U3O8 over 0.9 metres, including 0.68% U3O8 over 0.3 metres, in hole CRT24-10 at a true vertical depth of 375 metres, defining the new Lightning Zone. The completed winter program comprised four holes plus one lost hole totalling 2,332 metres, all with elevated radioactivi

    Drill results
  2. Feb 7, 2024

    Purepoint Uranium Starts Hook Lake Drill Program

    Drilling has begun at the Hook Lake Project on the southwestern edge of the Athabasca Basin, Saskatchewan, with approximately 2,500 metres planned in five holes testing the Carter Corridor. The program follows up hole CRT23-05, which returned 0.08% U3O8 (671 ppm U) over 0.4 metres (319.1 to 319.5m) from a 15-metre basement-hosted graphitic shear zone, with a boron halo over 35 metres. Hook Lake is

    Drill results
  3. Nov 20, 2023

    Purepoint Uranium Announces Upcoming Hook Lake Drill Program

    A winter drill program of approximately 2,500 metres in 5 holes has been approved for the Carter Corridor at the Hook Lake Project on the southwestern edge of Saskatchewan's Athabasca Basin, with drilling to begin in January 2024. The program follows up on hole CRT23-05, which returned 0.08% U3O8 (671 ppm U) over 0.4 metres from 319.1 to 319.5m, with greater than 800 ppm boron over 35 metres. Hook

    Drill results
  4. May 8, 2023

    Purepoint Uranium Updates Results for Winter Drill Program at Hook Lake Joint Venture

    Drill hole CRT23-05 on the Carter Corridor at the Hook Lake joint venture in Saskatchewan's southwestern Athabasca Basin returned 0.08% U3O8 (671 ppm U) over 0.4 metres from 319.1 to 319.5m, below the unconformity at 283m, within a 15-metre graphitic shear zone and surrounded by a 35-metre boron halo grading greater than 800 ppm B (305-340m). The winter program completed six holes totalling 2,710

    Drill results
  5. Mar 23, 2023

    Purepoint Uranium Reports Total Gamma Spikes as High as 8,850 cps as It Completes Winter Drill Program at Hook Lake Joint Venture

    The winter drill program at the Carter Corridor on the Hook Lake Joint Venture in Saskatchewan's southwestern Athabasca Basin has been completed, with 2,710 metres of diamond drilling in six holes. Hole CRT23-05 returned peak radioactivity of 8,850 counts per second, with three anomalous intervals over 34.8 metres including 0.9 metres at 3,950 cps and 2.2 metres at 1,660 cps. CRT23-06, a 100-metre

    Drill results
  6. Mar 1, 2023

    Purepoint Uranium to Present at the Red Cloud’s 2023 Pre-PDAC Mining Showcase and at the PDAC Conference

    President and CEO Chris Frostad will present at Red Cloud's Pre-PDAC Mining Showcase on March 3, 2023 at 1:50 pm ET at the Sheraton Centre Toronto Hotel, and at the PDAC 2023 Conference on March 8 at 10:26 am in the Uranium Session, room 803, Metro Toronto Convention Centre, where the company will also host booth #2636. The presentations will cover drill programs underway at the Hook Lake and Red

    Corporate
  7. Jan 18, 2023

    Purepoint Uranium Begins Drill Program at Red Willow

    Drilling has begun at the 100%-owned Red Willow project in the eastern Athabasca Basin, Saskatchewan, with approximately 2,800 metres of diamond drilling across 15 holes anticipated. Drilling started at the Osprey Zone, where hole OSP22-06 returned 0.47% U3O8 over 0.9 metres, with target depths of less than 200 metres. A second drill program is underway at the Hook Lake Joint Venture project in th

    Drill results
  8. Jan 11, 2023

    Purepoint Uranium Begins Winter Drill Program at Hook Lake Joint Venture

    Drilling has commenced at the Hook Lake Joint Venture on the southwestern edge of Canada's Athabasca Basin, with approximately 3,200 metres of diamond drilling across 8 holes planned to test electromagnetic targets along the Carter Corridor. The project is a joint venture between Cameco Corporation (39.5%), Orano Canada Inc. (39.5%) and Purepoint (21%) as operator, covering nine claims totaling 28

    Drill results
  9. Nov 22, 2022

    Purepoint Uranium Announces Approval of Upcoming Hook Lake Drill Program

    Joint venture partners have approved a winter exploration drill program at the Hook Lake Project on the southwestern edge of the Athabasca Basin, with drilling to begin in January 2023. The program comprises approximately 3,200 metres of diamond drilling in 8 holes to test the Carter Corridor, a 25-kilometre strike-length structural/conductive corridor almost entirely within the project. Hook Lake

    Drill results
  10. Nov 7, 2022

    Purepoint Uranium Discusses Three Ongoing Drill Programs Live at VirtualInvestorConferences.com November 8th

    President and CEO Chris Frostad will present an update on Purepoint Uranium's three ongoing drill programs, including the Hook Lake joint venture with Cameco and Orano, live at VirtualInvestorConferences.com on November 8, 2022 at 11 am ET, with one-on-one meetings available November 11, 2022. Current fully funded drilling is underway at Red Willow and Turnor Lake in October/November 2022, with fo

    Drill results
  11. Sep 13, 2022

    The Northern Miner Podcast CEO Spotlight with Chris Frostad

    An 11-minute Northern Miner Podcast interview features President and CEO Chris Frostad discussing the uranium market and Purepoint's Athabasca Basin projects with Adrian Pocobelli. Purepoint operates 12 advanced projects across approximately 175,000 hectares in the Athabasca Basin, hosting over 20 drill target areas. Its flagship Hook Lake Project is a joint venture with Cameco Corporation and Ora

    Corporate
  12. Aug 30, 2022

    Purepoint Uranium Group Inc. Obtains Receipt for Final Base Shelf Prospectus

    A final receipt has been obtained for a base shelf prospectus filed with securities regulators in each Canadian province and territory, allowing Purepoint Uranium to distribute common shares, warrants, units and subscription receipts for aggregate gross proceeds of up to $15 million over the 25-month period the prospectus remains effective. No agreements or arrangements to offer or sell securities

    Financing
  13. Jul 12, 2022

    Purepoint Uranium Initiates ZTEM Survey at Hook Lake Joint Venture

    A deep-sensing Z-Axis Tipper Electromagnetic (ZTEM) airborne survey has begun over the northern portion of the Carter Corridor at the Hook Lake Joint Venture in Saskatchewan's Athabasca Basin, a venture held by Cameco Corporation (39.5%), Orano Canada Inc. (39.5%) and Purepoint (21%) as operator. The survey will cover 653 kilometres of flight at 300 metre spacings, with results and interpretations

    Drill results

Related

Other Purepoint Uranium Group Inc. projects

  • Aurora Project · Uranium · Canada
  • Carson Lake · Uranium · Canada
  • Celeste Block Project · Gold · Canada
  • Dorado Project · Uranium · Canada
  • Russell South · Uranium · Canada
  • Smart Lake Project · Canada
  • Tabbernor project · Gold · Canada
Purepoint Uranium Group Inc. profile →Purepoint Uranium Group Inc. news →Reading an NI 43-101 →