Friday, Oct 30, 20263 releases
Thursday, Oct 29, 20263 releases
Apollo Silver Delivers Positive PEA for Calico
Emerita Announces Positive IBW Pre-Feasibility Study Results Highlighting US$776 Million After-Tax NPV (8%), 23.51% IRR and 21-Year Mine Life
HONEY BADGER SILVER ANNOUNCES FILING OF NI 43-101 TECHNICAL REPORT FOR THE PC SILVER MINE PRELIMINARY ECONOMIC ASSESSMENT
Wednesday, Oct 28, 20264 releases
Aurania to Participate in Deutsche Goldmesse Fall 2026 in Frankfurt
Aurania Resources will participate in the Deutsche Goldmesse Fall 2026 conference in Frankfurt, Germany, on November 13 and 14, 2026, with management available for one-on-one meetings and a presentation by Chairman, President & CEO Dr. Keith Barron on November 14. The release also reports that Aurania completed eight holes totaling 780.7 metres in its 2026 diamond drill program at the Thormódsdalur gold-silver project in Iceland, with assay results expected in November 2026.
Honey Badger Silver to Attend 2026 New Orleans Investment Conference and Precious Metals Summit Zurich
Honey Badger Silver (TSX-V: TUF) announced that members of its management team will attend the 2026 New Orleans Investment Conference, October 28–31, 2026 in New Orleans, Louisiana, and the 2026 Precious Metals Summit Zurich, November 9–11, 2026 in Zurich, Switzerland. The Company is set to present at the Zurich summit on November 10, 2026 at 4:30pm CET in Room 2.
28 Oct Pacifica Silver Intersects 5.04 m of 8.72 g/t Au and 49 g/t Ag in 500 m Step-Out, Outlining New High-Grade Shoot on Central Vein at Claudia
Pacifica Silver reported assay results from 27 holes at its 100%-owned Claudia Silver-Gold Project in Durango State, Mexico, including 5.04 m grading 8.72 g/t Au and 49 g/t Ag (799 g/t AgEq) from 104.63 m in hole 26CLAU150D on the Central Vein. The company said the results outline a new high-grade shoot extending about 750 m along strike on the Central Vein and extend the Aguilareña Vein 700 m to the south.
Tartisan Nickel Receives Early Exploration Permit for The Sill Lake Silver Project, Vankoughnet, Sault Ste. Marie, Ontario
Monday, Oct 26, 20264 releases
BLACKROCK SILVER AWARDS CIVIL ENGINEERING WORKS TO NEWFIELDS FOR PERMIT DESIGNS ON THE TONOPAH WEST PROJECT
Blackrock Silver's Nevada subsidiary, Blackrock Gold Corp., has signed a service agreement with NewFields Mining Design & Technical Services, LLC to prepare construction-level designs for permitting an exploration decline, test mining and 50,000 tonnes (55,000 tons) bulk-sample extraction at its Tonopah West project in Nye and Esmeralda Counties, Nevada. Designs are anticipated by year end, with submission to Nevada's Bureau of Mining Regulation and Reclamation expected in January 2027, and approvals expected to take about 240 to 270 days after submission.
GR Silver Mining Welcomes Shareholder Support at AGM
Metalero Mining Corp. to Participate in Deutsche Goldmesse Fall 2026 in Frankfurt
Metalero Mining Corp. (TSXV: MLO) will participate in the Deutsche Goldmesse Fall 2026 conference, held November 13 and 14, 2026, at The Westin Grand Frankfurt in Frankfurt, Germany. Management will hold one-on-one investor meetings and present to European investors during the event.
Prince Silver Appoints Patrick Toth as Vice President, Exploration and Announces Investor Relations Engagement
Prince Silver Corp. appointed Patrick Toth, B.Sc., P.Geo., as Vice President, Exploration, effective October 22, 2026, after he served as the Company's Exploration Manager. The release also announces a six-month investor relations engagement with Triomphe Holdings Ltd., doing business as Capital Analytica, for a cash fee of C$150,000 plus applicable taxes, subject to CSE acceptance.
Friday, Oct 23, 20261 release
Thursday, Oct 22, 20264 releases
Aztec Extends Oxide Gold Silver Mineralization Up To 190 M West At The North Extension At Tombstone Arizona Including 1158 M Of 067 Gt Aueq 052 Gt Au 811 Gt Ag In Tr26 45
Aztec Minerals reports results from nine reverse circulation drill holes (TR26-45 to TR26-53) at its Tombstone Property in southeastern Arizona, all of which intersected oxide gold-silver mineralization. Hole TR26-45 returned 115.8 m averaging 0.52 g/t Au and 8.11 g/t Ag (0.67 g/t AuEq) from 51.8 m, and the western step-outs extend the known oxide footprint about 190 m west of the North Extension. The maiden Mineral Resource Estimate is expected in November 2026, with assays pending for 22 further holes.
Kootenay Welcomes Mark Smith As Technical Advisor For La Cigarra Project Development
Kootenay Silver Inc. (TSXV: KTN) has appointed Mark Smith as a technical advisor to support planning for geotechnical drilling and engineering for the tailings facility in the La Cigarra PEA. The release also reports annual grants of options for 2.2 million shares, at $0.94 per option with a five-year term, and 1.11 million restricted and deferred share units.
Silver Storm Announces Participation in the 2026 New Orleans Investment Conference
Silver Storm Mining will participate in the 2026 New Orleans Investment Conference, running October 28-31, 2026, at the Hilton New Orleans Riverside hotel. The company is at Booth #137 and will host a corporate breakfast on Thursday, October 29, 2026, from 7:15 am to 7:45 am in room Churchill B2, to discuss ramp-up of operations at the La Parrilla Silver Complex toward steady-state production by 1Q 2027.
Proactive Investors, October 2026
Wednesday, Oct 21, 20265 releases
Cerro de Pasco Resources Acquires the Remaining Quiulacocha Tailings and Secures Surface Rights, Consolidating 100% of the Tailings
Cerro de Pasco Resources has signed definitive agreements with AMSAC, a Peruvian state-owned company, for the Quiulacocha tailings, including the portion outside its El Metalurgista concession, plus a usufruct of up to 30 years over about 123 hectares of land. The company paid US$6.65 million at closing, which took place on October 20, 2026, and the Transaction remains subject to TSXV acceptance.
Discovery Announces Details of Third Quarter 2026 Results Conference Call and Webcas...
Metalero Mining (MLO) Initiates Fall Exploration Program and Announces an Expansion of the Land Package at Benson
Metalero Mining has mobilized field crews to the Benson Project in British Columbia to begin fall soil sampling at the Bollos and Pinnacle porphyry copper-gold targets, the first systematic exploration on those targets. The company also said the British Columbia Mineral Titles Branch approved claim #1138294, adding 7 km² west of Cantin and expanding Benson to 173 km².
Outcrop Silver Extends Santa Ana Vein System Northward and Identifies Parallel Cascada Vein
Drilling at the Santa Ana silver project in Tolima, Colombia returned 1.37 m (0.74 m ETW) grading 1,084 g/t AgEq, including 0.30 m (0.16 m ETW) at 4,725 g/t AgEq, in hole DH687 on the newly delineated Cascada vein, subparallel to and in the footwall of Alaska. Results and interpretation indicate Alaska is the northern continuation of the Santa Ana structure, extending strike length to nearly 3 kilometres, with intercepts of 3.43 m (1.26 m ETW) at 307 g/t AgEq (DH665) and 8.39 m (3.61 m ETW) at 241 g/t AgEq (DH685). Four rigs are drilling, with assays pending.
Strategic Metals Grants Incentive Stock Options
Incentive stock options covering up to 3,325,000 common shares have been granted to directors, officers, employees and consultants of Strategic Metals Ltd. (TSX-V: SMD), exercisable at $0.28 per share for five years. The options vest quarterly beginning three months from the grant date. Strategic reports a current cash position of approximately $5 million.
Tuesday, Oct 20, 20265 releases
Drilling at Dome Continues to Confirm Large-Scale, Open-Pit Potential; New, High-Gra...
Fox Tungsten Mobilizes Fourth Drill Rig to Advance Exploration at Silverboss Property
Fox Tungsten has mobilized a fourth drill rig to its 100%-owned Silverboss property in south-central British Columbia, starting a dedicated drilling program targeting molybdenum-copper exploration potential. Drilling will initially focus on the 10 Mile Creek target, where the company is testing potential extensions of mineralization associated with the historic Boss Mountain molybdenum mine next door.
Silver Tiger El Tigre Construction Update
Strategic Metals and GGL Resources Property Transaction Approved
Final TSX Venture Exchange acceptance has been received for the Yukon copper-gold properties transaction with GGL Resources Corp., first announced July 27, 2026, with disinterested shareholder approvals obtained August 31, 2026 and GGL completing a four-for-one share consolidation. GGL can earn 70% in the Hopper, Kluane, Batt and Moraine properties in southwest Yukon by issuing 1,000,000 post-consolidation shares by October 31, 2026 and spending $10,000,000 by December 31, 2029, then 100% for a further $3,000,000, leaving Strategic a 2% NSR.
VR Receives NOI Permit with Expanded Drill Site Coverage for its New Boston Moly-Copper-Tungsten- Silver Porphyry Project in Nevada
The Nevada BLM has approved VR Resources' NOI drill permit amendment and associated reclamation bond for the New Boston moly-copper-tungsten-silver porphyry project, doubling permitted drill sites at the Jeep Mine area from 8 to 16 and allowing drilling to proceed. The permit application, submitted September 11, was approved September 16, with the bond submitted October 6 and approved October 9. Earlier hole NB26-003 intersected 317 m at 0.77% CuEq from surface above 419 m at 0.48% CuEq.
Monday, Oct 19, 20263 releases
Nicola Mining to Host One-on-One Meetings and Present at the Red Cloud Fall Mining Showcase 2026
Silvercorp Reports Operational Results and Financial Results Release Date for the Second Quarter, Fiscal 2027
Q2 Fiscal 2027 (ended September 30, 2026) production at the Ying Mining District totalled 213,320 tonnes of ore processed for 0.9 million ounces of silver, 1,371 ounces of gold, 7.6 million pounds of lead and 0.7 million pounds of zinc, down 41%, 34%, 41% and 51% year over year, with revenue of $72.1 million, down 13%, on realized prices of $61.83 per ounce silver and $3,955 per ounce gold. The GC Mine remains suspended pending an updated mine development design, with production resumption targeted for November 2027. Unaudited interim financial results are due November 5, 2026 after market close.
Sun Summit Receives Positive Metallurgical Test Results for the JD Project
Metallurgical testing on Creek Zone and Finn Zone composites from the JD Project in B.C.'s Toodoggone district returned gold extraction of 98-99% for Creek Zone and 89-95% for Finn Zone using a gravity-leach flowsheet at 150µm, with 93-96% and 90-94% respectively at 250µm. A gravity-flotation-leach flowsheet at 150µm gave overall gold recovery of 95-97% for Creek Zone and about 100% for Finn Zone. The company anticipates an inaugural Mineral Resource Estimate in Q1 2027.
Friday, Oct 16, 20261 release
Grizzly Closes Private Placement and Completes Midway-Beaverdell Option
A private placement first announced September 15, 2026 has closed, with 1,000,000 Units at $0.05, 325,000 FT Units at $0.055 and 4,866,668 CMFT Units at $0.06 issued for gross proceeds of $359,875; cash finders fees of $21,692 and 328,416 Finder Warrants were paid, leaving 240,313,037 shares outstanding and a four-month hold expiring February 17, 2027. The Company also paid $5,000 and issued 100,000 shares on October 13, 2026 to complete the Midway-Beaverdell Option, giving it 100% of 761.25 hectares in British Columbia's Greenwood Mining District, subject to a 1% NSR.
Thursday, Oct 15, 20262 releases
Honey Badger Silver Samples up To 279 G/t Silver, 5.82% Copper, & 0.83 G/t Gold and Identifies Multiple New Mineralized Occurrences at Its YAVA Project, NUNAVUT
Grab samples from the first exploration program at the 100%-owned Yava polymetallic VMS project in Nunavut returned up to 279 g/t silver, 5.82% copper, 0.83 g/t gold, 0.60% zinc and 0.32% lead at the historic Main Zone. The five-day August 2026 prospecting program collected 146 rock samples and identified new mineralized occurrences at the R-12, M-9, M-10 and South Zone electromagnetic targets across the 5,218-hectare property. Results are being integrated with historic data to plan follow-up work, including potential drilling.
OUTCROP SILVER Launches Project Argentum: Technical Work Plan Approved for Santa Ana Pilot Operation, Targeted for Production in 2027
Colombia's National Mining Agency has approved the Technical Work Plan for Concession Contract HFL-151 at the 100%-owned Santa Ana silver project in Falan, Tolima, covering Project Argentum, a pilot plant and underground mine of up to 40 tonnes per day on the La Porfía vein system via the La Ivanna portal, using cyanide- and mercury-free processing, with first production targeted in 2027. An Environmental Impact Assessment has been filed with CORTOLIMA, with the licence expected in early 2027. A Preliminary Economic Assessment is planned following filing of the updated resource technical report.
Wednesday, Oct 14, 20264 releases
GoGold Announces 2026 Annual Production
Kuya Silver Secures Processing Capacity Through Strategic Alliance with Camila PlantSecured expansion financing from Kuya Silver...
A Strategic Toll-Milling and Financing Agreement has been closed with SMRL Camila 2008, replacing the letter of intent announced January 27, 2026. Kuya Silver provided a $400,000 secured loan, bearing 7% annualized interest over 24 months with equal monthly repayments, to expand the Camila concentrate plant in Peru to about 280 wet tonnes per day. Camila will reserve up to 3,000 tonnes per month for Kuya through March 2027 and 4,000 tonnes monthly thereafter until loan maturity.
Silverco Mining Intercepts 1,280 g/t Silver over 3.35 Metres True Width at its 100%-Owned Cusi Mine in Chihuahua, Mexico
Drilling at the 100%-owned Cusi Property in Chihuahua, Mexico returned 1,222 g/t silver equivalent over 3.35 metres true width in hole UGCU26-09 (1,280 g/t Ag, 0.42 g/t Au, 1.28% Pb, 1.49% Zn), including 5,392 g/t AgEq over 0.65 mTW; hole UGCU26-10 returned 737 g/t AgEq over 4.18 mTW. The results come from 15 holes of an ongoing 30,000 metre program at Promontorio, San Miguel and San Juan, supporting a Mineral Resource update planned for H1 2027 and a production restart in Q4 2026.
Strategic Metals Identifies Eight Stacked Skarn Horizons Flanking Suspected Porphyry Target at Harry Project, Yukon
Mapping and prospecting at the wholly-owned Harry Project, 75 km southeast of Whitehorse, Yukon, outlined eight stacked, foliation-parallel skarn horizons across roughly 325 m of stratigraphy, alongside a 1,200 m by 700 m molybdenum-in-soil anomaly interpreted as a porphyry-type target over a buried intrusion. Continuous chip samples returned 103 ppm W, 47 ppm Sn and 22 ppm Mo over 14.40 m, 0.12% Cu and 0.47% Zn over 8.70 m, and 0.16% Cu with 219 ppm W over 2.00 m. The 2026 work was supported by the Yukon Mineral Exploration Program.
Tuesday, Oct 13, 20266 releases
Aurania Completes Drilling at Thormodsdalur Gold Project in Iceland
Eight diamond drill holes totalling 780.70 metres have been completed in the 2026 program at the Thormódsdalur epithermal gold-silver project, located about 20 kilometres east of Reykjavík, Iceland. Core recovery was at or close to 100% in most cases, versus approximately 50% or less in previous programs, with most holes twinning historical holes. Textures consistent with epithermal gold-silver mineralization were observed in every hole; samples were submitted to ALS and assays are expected in November 2026.
BLACKROCK SILVER ANNOUNCES GRADUATION TO THE TORONTO STOCK EXCHANGE
Common shares will begin trading on the Toronto Stock Exchange at the market open on October 15, 2026 under the symbol BRC, with a voluntary delisting from the TSX Venture Exchange effective the same date. Listings on the OTCQX (BKRRF) and Frankfurt Stock Exchange (AHZ0) continue. Under its at-the-market program, Blackrock Silver has sold 4,804,900 common shares at an average price of $1.17 for gross proceeds of $5,611,488 and net proceeds of $5,413,800.
Hannan Restarts Drilling at Stavaträsk Gold Project, Sweden
Diamond drilling has restarted at the Stavaträsk gold project in Sweden's Skellefteå district, with a second program of approximately 1,000 m in about 4 holes testing down-dip and strike extensions plus IP chargeability targets outside the drilled area. The maiden seven-hole, 1,040 m program intersected gold in every hole over 650 m of strike, including 4.6 m @ 7.2 g/t Au in ST2606 and 1.1 m @ 15.6 g/t Au in ST2605. Drilling is expected to finish during October 2026, with assays 6 to 8 weeks later.
NI 43-101 Technical Report Filed for the Gowganda Silver Tai...
A NI 43-101 technical report for the Gowganda Silver Tailings Project at the Castle Silver Property in Gowganda, Ontario has been filed on SEDAR, dated October 13, 2026 and effective August 1, 2026. It was prepared by Duncan Studd, M.Sc., P.Geo., of GeoVectorManagement Inc., an independent Qualified Person, and contains an updated 2026 Mineral Resource Estimate for the 100%-owned deposit, initially disclosed September 15, 2026. The property produced approximately 42 million ounces of silver between 1910 and 1972.
Silver One’s ZTEM Airborne Geophysical Survey Identifies 7 Additional Silver Targets And 6 Potential Porphyry Copper-Silver-Gold Systems At The Candelaria Project, Nevada. New Claims Staked
A helicopter-borne ZTEM survey flown in May 2026 by Geotech Ltd at the Candelaria Project, Nevada, identified seven additional silver targets (CM_01–CM_07) and six potential copper-silver-gold porphyry targets (CP_01–CP_06), all recommended for further exploration. Follow-up reconnaissance of 92 selected and channel rock samples returned up to 48,895 ppm copper, 4,383 ppm lead, 5,190 ppm zinc and 272 ppm silver. Silver One staked 382 new claims covering 3,128 ha (7,730 acres) southwest of the property, and appointed director Ken Engquist VP Project Development effective September 2026.
Strategic Metals Ltd. announces acquisition of Control and Direction of Securities of Trifecta Gold Ltd. and Creation of 11 Additional NSR Royalties
Strategic Metals received 6,265,000 common shares of Trifecta Gold Ltd. on October 13, 2026 as the final payment under a Property Option Agreement under which Trifecta completed its acquisition of a 100% interest in Mt. Hinton, Rye and nine other gold and silver projects in the Yukon's Tombstone Gold Belt. Strategic retains a 2% NSR royalty on each project, which Trifecta can buy down to 1% for 1,500 ounces of gold or the cash equivalent. Strategic's holding rose from 2,031,579 shares (3.60%) to 8,296,579 shares (13.23%).
Monday, Oct 12, 20262 releases
Cerro de Pasco Resources Awarded the Quiulacocha Tailings in AMSAC Public Bidding Process
Activos Mineros S.A.C. (AMSAC) awarded Public Auction No. 001-2026-AMSAC to subsidiary Cerro de Pasco Resources del Perú S.A.C. on October 12, 2026, covering transfer of the tailings held in the Quiulacocha Tailings Storage Facility (liability ID No. 6752, district of Simón Bolívar, Pasco, Peru) for economic reprocessing. The award remains subject to execution of definitive agreements with AMSAC, expected in the coming days. Once executed, the Company expects to hold the mineral and surface rights, consolidating these with its 100%-owned El Metalurgista concession.
Nicola Mining Inc. CEO Peter Espig Explains How the Merritt Mill Supports Exploration
Friday, Oct 9, 20262 releases
Discovery Enters into Asset Purchase Agreement to Acquire Certain Timmins Mineral Pr...
VIZSLA SILVER ANNOUNCES RESULTS OF ANNUAL GENERAL AND SPECIAL MEETING
Shareholders approved all motions at the annual general and special meeting held in Vancouver on October 8, 2026, including fixing the board at seven directors, electing Craig Parry, Michael Konnert, Simon Cmrlec, Harry Pokrandt, David Cobbold, Eduardo Luna and Suki Gill, appointing Deloitte LLP as auditor, and approving the amended and restated Shareholder Rights Plan. A total of 188,580,782 shares were voted, representing 53.11% of issued and outstanding shares as at the record date.
Thursday, Oct 8, 20263 releases
Alaska Silver Completes Record-Breaking 2026 Drill Program At Illinois Creek
9,496 metres were drilled across two rigs over 84 drill days at the 100%-owned Illinois Creek Project in western Alaska, exceeding the expanded 9,000-metre target and the original 6,000-metre plan, which was met in 54 drill days before a C$7,615,800 financing closed on August 17, 2026 funded the expansion. The program included 39 holes sampled (27 at Silver Sage, 12 at Waterpump Creek), 7,380 samples submitted for assay, and the deepest hole at the project at 1,288.24 metres. Assays are pending.
Nicola Mining Announces Extension of Agreement with Lower Nicola Site Services Ltd. and Completion of Drill Exploration for 2026 at Treasure Mountain
Silver X Grows the AgEq Processed by 42% and Gold 119% YoY as Nueva Recuperada Plant Expansion to 1,000 TPD Advances
Third quarter 2026 production at the Nueva Recuperada project in Peru included 54,681 MT processed, up 63% from 33,505 MT in 3Q25, with 138,724 oz silver (+47%), 1,641 oz gold (+119%) at head grades of 0.93 g/t, and 322,822 AgEq oz processed (+42%); AgEq produced was 225,237 oz (+35%). The plant averaged 594 tpd as throughput was limited during work to lift capacity to 1,000 tpd, expected in 4Q26. Ore mined reached 60,694 MT, building a roughly 6,000-tonne stockpile.
Wednesday, Oct 7, 20262 releases
Discovery Reports New, High-Grade Intersections at Pamour that Further Extend Minera...
Fox Tungsten Reports Initial Assay Results from 2026 Drill Program, Including High-Grade Intervals at RC South
Resource expansion drilling at RC South on the Fox Tungsten Project in British Columbia returned 2.1 metres grading 1.43% WO₃ from 34.6 metres in hole F26-003, 8.8 metres at 0.33% WO₃ from 43.6 metres including 1.0 metre at 1.94% WO₃ in F26-005, 1.2 metres at 1.97% WO₃ in F26-006, and 7.9 metres at 0.48% WO₃ from 84.0 metres including 0.4 metres at 9.63% WO₃ in F26-012. Exploration holes at Fox North, August Showing and RC Deep returned no significant tungsten grades. These are the first 18 holes of the 20,000-metre program; about 52 holes are complete, with drilling continuing to late October.
Tuesday, Oct 6, 20264 releases
Metalero Provides Updates to the Benson Copper-Gold Property Option
An update was given on the LOI dated January 17, 2025 to acquire a 100% undivided interest in the 166 km2 Benson copper-gold property, 21 contiguous claims 15 kilometres east of Quesnel, British Columbia. Metalero has paid $40,000 of the $100,000 cash consideration, with $60,000 due on or before January 17, 2027, and will issue 2,000,000 consideration shares upon TSXV approval at a deemed price equal to the market price on this release date, subject to a $0.05 floor. Exploration work totals $279,698.23 to date; no definitive agreement will be entered into.
Non-Brokered Critical Mineral Flow-Through Share Private Pla...
A non-brokered critical mineral flow-through private placement has closed, with 8,888,888 FT Shares issued at $0.18 per share for gross proceeds of $1,600,000, subject to final TSX Venture Exchange acceptance. Finder's fees of 7% ($112,000) in cash and 7% (622,222) non-transferable warrants exercisable at $0.18 for two years are also subject to Exchange approval. Securities carry a four-month and a day hold period expiring February 8, 2027. Proceeds will fund exploration at the Castle East Project.
Two of the Widest Silver Intersections to Date at Shallow Depths: 47 Metres at 68.2 G/T Silver (119.1 G/T Silver Equivalent) and 37 Metres at 86.3 G/T Silver (146.3 G/T Silver Equivalent)
Results from nine reverse circulation holes at the Prince Silver Project in Nevada include PRC-59 with 47.24 metres at 68.17 g/t Ag (119.13 g/t AgEq), 9.57% Mn, 2.40% Zn, 1.95% Pb and 0.26 g/t Au from 62.48 m, and PRC-60 with 36.58 metres at 86.30 g/t Ag (146.27 g/t AgEq) from 64.01 m, both in the Lyndon Limestone. PRC-54 returned 3.05 metres at 619.60 g/t Ag. As of September 27, 2026, 41 holes totaling 11,251 metres were completed; a maiden NI 43-101 resource estimate is targeted for early 2027.
Sun Summit Drills 23.5 Meters of 4.35 g/t Gold Including 4.50 Meters of 21.8 g/t Gold at the JD Project; Extends Creek Zone Mineralization 100 Meters Along Strike
Drilling at the Creek Zone of the JD Project in B.C.'s Toodoggone Mining District returned 23.5 meters of 4.35 g/t gold and 4.69 g/t silver from 109.0 meters, including 4.50 meters of 21.8 g/t gold, in hole CZ-26-023, plus 32.5 meters of 3.02 g/t gold in CZ-26-032. Results from the first 13 holes extended mineralization about 100 meters northwest along strike, where it remains open. Assays from 42 of the 55 holes in the 16,000-meter program are pending, with an inaugural resource estimate planned for Q1 2027.
Monday, Oct 5, 20262 releases
Cerro de Pasco Resources Announces AGM Results
All matters put to shareholders at Cerro de Pasco Resources' Annual General Meeting, held September 30, 2026, were approved, with 345,835,894 common shares representing 52.06% of issued and outstanding shares represented in person or by proxy. Eight directors were elected — John G. Booth, René Branchaud, John S. Carr, Guy Goulet, Frank Hodgson, Manuel Lizandro Rodriguez, Lara J.T. Smith and Steven Zadka — each with at least 85% of votes cast in favour, and Davidson & Company LLP was appointed auditors with 100% support. Pyers Griffith did not stand for re-election and will serve as Chief Strategy Officer.
Discovery Announces Receipt of Key Environmental and Land Use Permits for Cordero Pr...
Friday, Oct 2, 20261 release
Silvercorp Reports 2026 Annual General and Special Meeting Results
All matters put to shareholders at Silvercorp's annual general and special meeting held October 2, 2026 were approved, with 123,182,474 common shares, or 55.69% of votes attached to outstanding shares as at the record date, represented. Directors Rui Feng, Paul Simpson, Yikang Liu, Marina Katusa, Ken Robertson and Helen Cai were elected, and Deloitte LLP was re-appointed as auditor. A special resolution amending the Articles to align with Hong Kong Stock Exchange listing rules passed with 95.74% in favour, and amendments to the share-based compensation plan passed with 84.51%.
Thursday, Oct 1, 20264 releases
Alaska Silver Announces Transition of Aaron Schutt to CEO
Aaron Schutt became President and Chief Executive Officer of Alaska Silver effective October 1, 2026, succeeding co-founder Christopher (Kit) Marrs, who remains Executive Chairman. Schutt joined the board in May 2026 and was previously President and CEO of Doyon Limited until June 1, 2026. The Company granted 109,770 RSUs and 525,000 stock options exercisable at C$0.68 for five years, and issued 1,509,710 shares at $0.82 per share to settle outstanding management fee debt owed to officers.
Aurania Directors Receive Stock Options in Lieu of Fees
An aggregate of 81,000 stock options was granted to certain Aurania Resources directors on September 30, 2026 at an exercise price of $0.22, in lieu of cash payment of their third-quarter 2026 quarterly director fees. The options vested immediately on grant and are exercisable for three years from the grant date, with each director responsible for paying the full exercise price.
Hannan Extends Previsto Gold Breccia to 410 Metres, Open in All Directions
Channel and rock chip sampling at the Previsto Central gold zone, part of the 100% owned Previsto prospect in Peru, added 325 channel samples over 580.5 m and extended the mapped mineralized breccia by 105 m to 410 m of strike, open in all directions. All 648 channel samples across four campaigns returned mineralization above background. A panel sample returned 32.8 g/t Au and 130 g/t Ag; channel CH18046 returned 19.8 m @ 0.6 g/t Au, 6 g/t Ag including 2.0 m @ 3.1 g/t Au. DIA approvals are anticipated during Q1 2027.
Silver One Resources Announces Mobilization of RC Drill at Candelaria
A reverse-circulation rig was mobilized by National Drilling in September to the Candelaria Project in Nevada, with drilling to begin immediately; Major Drilling America will resume RC drilling in the second half of October and Evolve Drilling will mobilize a third RC/core rig in the same period. With three rigs, Silver One is targeting completion of its 25,000-metre program in the first quarter of 2027. A Pre-Feasibility Study is targeted for completion by the end of 2026, ahead of a construction decision targeted for late 2027.
Wednesday, Sep 30, 20263 releases
Emerita Resources Provides Update on Preliminary Feasibility Study
The Preliminary Feasibility Study for the Iberian Belt West Project in Spain is in final review, with release now expected in the coming weeks rather than the previously indicated timing. Emerita's recently updated Board, which has formed a Technical Committee of independent directors, expanded the final review to add technical and quality assurance oversight, the primary reason for the delay.
Nicola Mining’s triple threat in British Columbia | Beaver Creek 2026
Silvercorp Announces Further Amendments to Meeting Proposal
A further variation to the special resolution on proposed amendments to Silvercorp's Articles will be considered at the annual general and special meeting on October 2, 2026 at 10:00 a.m. Pacific time, with the proxy voting deadline extended to September 30, 2026 at 4:00 p.m. Pacific time. Article 16 will be amended to remove the Company's ability to request information on a proposed director nominee beyond that enumerated in Article 16, paragraph 4. Previously submitted proxies remain valid, and Laurel Hill Advisory Group, retained as proxy solicitation agent, will receive a $30,000 fee.