Friday, Oct 30, 20263 releases
Thursday, Oct 29, 202623 releases
A2Gold to Sell Bolo for $1.5 Million and Up to $2.8M in Contingent Payments
American Tungsten Advances the IMA Mine Project: New Vein Discovery, Strong Infill Drill Results and Ongoing PEA Development
Apollo Silver Delivers Positive PEA for Calico
Managements Discussion & Analysis (Sept Quarterly Report)
AuMEGA Metals' management's discussion and analysis for the quarter ended September 30, 2026 reports a third-quarter net loss of $4.4 million, against $2.2 million a year earlier, driven mainly by higher exploration spending. The company ended the quarter with cash of approximately $23.0 million and no debt. The filing also updates drilling at Cape Ray West, the Isle aux Morts Granite, Bunker Hill and the Intersection Project, where assays remain pending.
Appendix 5B Cash Flow Report 30 September 2026
AuMEGA Metals reported a quarterly cash flow report for the quarter ended 30 September 2026, showing net cash used in operating activities of CAD $3,669 thousand for the quarter and CAD $9,050 thousand year to date. Cash and cash equivalents at quarter end were CAD $23,012 thousand, and the company estimated 6.3 quarters of funding available.
Interim Financial Report - 30 September 2026
AuMEGA Metals reported an unaudited interim loss of $8,166,226 for the nine months ended 30 September 2026, compared with a restated loss of $8,200,114 for the same period in 2025. Cash and cash equivalents stood at $23,016,208 at period end, following share and warrant issues in March and April 2026. The company's exploration focus is in Newfoundland, Canada.
BULGOLD Inc. To Present Its Emerging Gold Exploration Story At The Munich Mining Conference
Canstar Resources Reports 1.8 m Grading 6.1% Zinc, 106 g/t Silver and 2.0 g/t Gold at Mary March; Mobilizes for Fall Drilling
Cantex Reports Successful 2026 Drill Program with Initial Results Including a 14 Meter Intersection Containing 4 Meters of 29.45% Lead-Zinc on its 100% Owned Silver-Lead-Zinc-Germanium North Rackla Project, Yukon
Emerita Announces Positive IBW Pre-Feasibility Study Results Highlighting US$776 Million After-Tax NPV (8%), 23.51% IRR and 21-Year Mine Life
Enduro Metals Discusses 2026 Exploration Season at Newmont Lake; Extends IP Coverage at Andrei and Southmore; New Porphyry Occurrence identified at FK
Enduro Metals reported on its 2026 exploration season at its 100%-owned Newmont Lake Project in British Columbia's Golden Triangle, following field work that ended in late September. The company extended induced polarization coverage northeast of the Andrei drilling area, completed IP surveys at Southmore and Camp, and identified a new porphyry-style occurrence at FK. Assay results from the Andrei drill program and surface sampling remain pending.
Freegold Reports Golden Summit Drill Results and Updates Progress Toward 2027 PFS 160.6 m at 1.80 g/t gold; updated resource estimate targeted for Q2 2027
Getchell Gold Corp. Announces Richard Buzbuzian as CEO
Headwater Gold Stakes the Ollie Epithermal Gold Project in Nevada’s Walker Lane
HONEY BADGER SILVER ANNOUNCES FILING OF NI 43-101 TECHNICAL REPORT FOR THE PC SILVER MINE PRELIMINARY ECONOMIC ASSESSMENT
LAURION Intersects 1.80 m @ 17.10 g/t Au and 9.24 g/t Ag, including 0.80 m @ 31.50 g/t Au and 15.60 g/t Ag, and 10.05 m @ 1.11 g/t Au and 2.12 g/t Ag, Including 1.85 m @ 4.11 g/t Au and 8.23 g/t Ag, in LBX26 117 at Ishkōday’s A-Zone
Luca Intersects 19 Metres of 6.3 g/t Gold Equivalent from the Creston Vein at Tahuehueto Mine
Luca Mining reported new 2026 exploration assays from its Tahuehueto gold-silver mine in Durango, Mexico, led by 18.7 metres of 6.28 g/t gold equivalent at the Creston Vein in hole TRT26-15, which the company said was wider and higher-grade than previously anticipated and lies in an area scheduled for mining in H1 2027. Additional results were reported from the Catorce Block and Santiago vein.
Midland Intersects Several New Gold-Bearing Intervals on its Willbob Project in the Labrador Trough
Midland Exploration Inc. (TSX-V: MD) reported results from its 2026 summer diamond drilling campaign on the Willbob gold project in the Labrador Trough, with 19 holes totalling 2,994.00 metres. Highlights include drill hole WB-26-046 intersecting 3.53 g/t Au over 11.30 metres in the Pump Pad Ridge area, and WB-26-035 returning 8.31 g/t Au over 0.50 metres in the Ants area. Assays for four holes (WB-26-048 to WB-26-051) are partial, with further results pending.
Midland intersecte plusieurs nouveaux intervalles aurifères sur son projet Willbob dans la Fosse du Labrador
Midland Exploration (TSX-V: MD) reports results from its 2026 summer diamond drilling campaign on the Willbob gold project in the Labrador Trough, Quebec, where 19 holes totalling 2,994.00 metres were completed. Highlights include 3.53 g/t Au over 11.30 metres at Pump Pad Ridge (hole WB-26-046) and 3.02 g/t Au over 6.45 metres at Ferricrete (WB-26-039). Results for four holes (WB-26-048 to WB-26-051) are pending.
SLAM Accepts Conditional Offtake Offer From Ocean Partners For 40,000 Wet Metric Tonnes Of Zinc-Lead-Copper-Silver Ore From New Brunswick
SLAM Exploration has accepted a conditional offer from Ocean Partners USA, Inc. to buy approximately 40,000 wet metric tonnes of its polymetallic ore from the Ahearn property in New Brunswick. The offer is not a binding sale agreement and remains subject to buyer KYC, refinery sample testing and a definitive contract. The material has not yet been extracted, and extraction is expected to start in Spring 2027, pending provincial approvals not yet obtained.
Standard Uranium Confirms Strong Radioactivity up to 48,000 cps at Surface and Discovers New Showings at the Corvo Uranium Project
Standard Uranium reports preliminary 2026 prospecting results at its Corvo Uranium Project in northern Saskatchewan, with handheld scintillometer readings of 20,000 to 48,000 cps in outcrop at the Manhattan East showing and a newly discovered showing on the Brooklyn trend reading up to 13,400 cps. Nine outcrop grab samples are at SRC laboratories, and assay results will be released once received and reviewed by the qualified person.
Latest · October 29, 2026StrikePoint Gold Commences Drilling at Northumberland Gold ProjectRead the release
StrikePoint Gold has commenced drilling at its 100%-owned Northumberland Gold Project in Nevada, using a core rig from NISS Global. The initial Phase 1 program is planned at approximately 15,000 meters for resource infill and expansion and metallurgical sampling, with additional rigs to be added early in the New Year.
Western Exploration Advances Doby George Permitting
Wednesday, Oct 28, 202623 releases
American Eagle Gold Appoints Marina Katsimitsoulias to its Board of Directors
American Eagle Gold has appointed Marina Katsimitsoulias, CPA, CA, to its Board of Directors effective immediately, and she will also chair the Audit Committee. The Board now has six directors, four of whom are independent.
Aurania to Participate in Deutsche Goldmesse Fall 2026 in Frankfurt
Aurania Resources will participate in the Deutsche Goldmesse Fall 2026 conference in Frankfurt, Germany, on November 13 and 14, 2026, with management available for one-on-one meetings and a presentation by Chairman, President & CEO Dr. Keith Barron on November 14. The release also reports that Aurania completed eight holes totaling 780.7 metres in its 2026 diamond drill program at the Thormódsdalur gold-silver project in Iceland, with assay results expected in November 2026.
BULGOLD Inc. Expands Strategic Exploration Position Around The Lutila Gold Project With Two New Exploration Licences
The Slovak Ministry of Environment has granted BULGOLD Inc. (TSXV: ZLTO) two new exploration licences, Chlmok (44.5 km²) and Sulina (62.4 km²), contiguous with its 100%-owned Lutila Gold Project in central Slovakia. The additions bring its total regional exploration position to 139.1 km², including the 32.2 km² Lutila Gold Project.
Banyan Extends Mineralization into the Airstrip–Powerline Gap at AurMac, Yukon, Intersects 1.34 g/t Au over 20.2 metres and 1.18 g/t Au over 27.5 metres
Banyan Gold reports six drillholes from the Airstrip Deposit at its AurMac Project in Yukon, Canada, including AX-26-921, which intersected 1.34 g/t Au over 20.2 metres and 1.18 g/t Au over 27.5 metres in the gap between the Airstrip and Powerline Deposits. Results from the other five holes (AX-26-904, -908, -909, -913 and -915) highlight extensions to higher-grade zones in central Airstrip.
Bold Ventures Samples High Grade Gold at Traxxin Highlights Ring of Fire Progress
Bold Ventures reports preliminary results from its Fall 2026 channel sampling at the Traxxin Project, 130 kilometers west-northwest of Thunder Bay, Ontario, with gold values from 9 to 24,800 ppb (0.009 to 24.8 g/t) across 30 samples received so far. Results from 84 additional channel samples are pending. The release also notes the federal government's matching $1 billion pledge for Ring of Fire roads.
Brixton Metals Announces Non-Brokered Private Placement Of Up To $6 Million
Brixton Metals plans a non-brokered private placement of up to $6 million in flow-through and critical mineral flow-through shares. National flow-through shares are priced at $0.68 each and CMFT shares at $0.71 each, with a four-month-and-one-day hold period. Proceeds will fund exploration at the Thorn Copper-Gold Project in British Columbia and the Langis Silver-Cobalt Project in Ontario, and the offering is subject to TSX Venture Exchange acceptance.
Copper Fox Congratulates BC Conservative Party
Copper Fox Metals congratulates BC Conservative Party Premier Designate Lorne Doerkson on an election victory and says the party's "one connected economy" strategy is set to shift resource development in Northern BC. The company says the shift bodes well for its 25% interest in the Schaft Creek Joint Venture with Teck Resources and its 100% owned Eaglehead project.
Dynasty Gold Discovers New Mineralization to 323m at Depth in Pelham and Expands Mineralization to 185m at Depth in South-Pelham at Thundercloud
Dynasty Gold Corp. reports assay results from its recent diamond drill campaign at the 100%-owned Thundercloud project in the Manitou-Stormy Lakes greenstone belt of Northwest Ontario. Hole DP26-07 extended the Pelham Zone to 323 metres at depth, with five consecutive samples between 315.5 and 323 metres grading up to 6.26 g/t gold. At South-Pelham, the company reports mineralization expanded to 185 metres at depth, with hole DP26-04 intersecting gold from 8 metres down to 185 metres.
GRG Resources Announces Start of First Drill Program at Atakama Gold Project, Chile
GRG Resources has started its first diamond drilling program at the Atakama Gold Project in Chile, planned for up to 4,000 metres. The initial 10 holes totalling 2,000 metres will test the Paula target and are expected to be completed by year-end, while geophysics and trenching proceed at three other priority areas.
GoldMining Commences Pre-Feasibility Study and Begins Infill Drilling with Three Drills at the São Jorge Project, Brazil
GoldMining Inc. has commenced a Pre-Feasibility Study and started a planned 6,000-metre infill diamond drilling program with three rigs at its 100%-owned São Jorge Gold Project in Pará State, Brazil. The company expects the PFS to be completed in the first half of 2028.
Golden Cariboo Plans Step Out and Infill Drilling to Upgrade Resource
Golden Cariboo Resources plans its next drilling phase at the Quesnelle Gold Quartz Mine Property near Hixon, British Columbia, with 100 metre step-out drilling at the Halo and North Hixon zones and infill drilling to about 50 metre centres in priority areas. The work follows the company's inaugural NI 43-101 Mineral Resource Estimate and could support upgrading part of the Inferred resource to Indicated.
Gunnison Copper Awards Equity Across Its Workforce to Mark NYSE American Debut Under the Ticker &quo...
Gunnison Copper intends to award equity to 115 eligible permanent employees to mark its October 26, 2026 debut on NYSE American under the ticker GUNN. The awards are planned as restricted share units with a 12-month vesting period from the initial listing date and will be granted after required regulatory processes and filings are completed.
Headwater Gold Intersects 46.33 Metres Grading 1.34 g/t Gold in its First Hole at Jake Creek and Provides Exploration Update
Honey Badger Silver to Attend 2026 New Orleans Investment Conference and Precious Metals Summit Zurich
Honey Badger Silver (TSX-V: TUF) announced that members of its management team will attend the 2026 New Orleans Investment Conference, October 28–31, 2026 in New Orleans, Louisiana, and the 2026 Precious Metals Summit Zurich, November 9–11, 2026 in Zurich, Switzerland. The Company is set to present at the Zurich summit on November 10, 2026 at 4:30pm CET in Room 2.
Lion Rock Adds Tantalum and Gold Mining Veteran Terry Lyons to Board
Newcore Gold Drilling Intersects 2.16 g/t Gold over 37.0 Metres, Including 5.10 g/t Gold over 9.0 Metres, at the Enchi Gold Project, Ghana
Newcore Gold reports diamond drill results from the Nyam Gold Deposit at its Enchi Gold Project in Ghana, including hole NBDD093 with 2.16 g/t Au over 37.0 m from 205 m, including 5.10 g/t Au over 9.0 m from 233 m. The intersections are below the pits that constrain the Mineral Reserves. The release covers four diamond drill holes totalling 1,192 m.
P2 Gold Extends Gold-Copper Mineralization along the Southwest Margin of the Lucky Strike Zone
P2 Gold reports drill results from seven reverse circulation holes along the southern and southwest margins of the Lucky Strike Zone at its Gabbs Project in Nevada, with all but hole GBR-134, which was lost to ground conditions, expanding the zone. Highlights include hole GBR-137 intersecting 0.52 g/t gold and 0.22% copper over 60.96 meters starting at 59.44 meters downhole. The company says the zone is thickening to the south and southwest and remains open in all directions.
Quimbaya Gold Expands Tahami Land Position by 37% to 43,496 Hectares
Quimbaya Gold reports that ten new mineral applications covering 11,845.6 hectares have lifted its Tahami Project in Segovia, Antioquia, Colombia, to 43,496 hectares, an increase of about 37% from 31,650 hectares during 2026. The applications are recorded as current in the Colombian national mining cadastre but are not granted titles.
Rackla Metals to Present at Emerging Growth 2026 Virtual Investor Conference
Rackla Metals (TSXV: RAK) will have VP Exploration Scott Casselman present at the Emerging Growth Conference 2026 Virtual Investor Conference (EGC 97) on October 28, 2026, at 8:25am PT / 11:25am ET. The presentation will be delivered by video webcast, with an archived version to be made available afterward.
RELEVANT GOLD EXPANDS LEWISTON PROJECT BY 5,800 ACRES
Relevant Gold Corp. has staked 294 additional BLM unpatented lode mining claims covering approximately 5,800 acres at its Lewiston Project in Fremont County, Wyoming, raising the company's Lewiston land position to approximately 20,000 acres. The staking covers prospective ground along an interpreted 2.5 km extension of the Burr trend and adjacent structural corridors.
Scottie Resources Hits 23.1 g/t Gold over 7.00 m and 20.6 g/t Gold over 5.60 m Reinforcing High-Grade at Blueberry Contact Zone
Scottie Resources reported further high-grade gold drill intercepts from its 2026 program at the Blueberry Contact Zone of the Scottie Gold Mine Project near Stewart, British Columbia. Highlights include 23.1 g/t gold over 7.00 m at Blueberry 3 (hole SR26-526), 20.6 g/t gold over 5.60 m at Fifi 2 (hole SR26-532), and 83.8 g/t gold over 1.60 m at Road 1 (hole SR26-503). The company also said more than 85% of 2026 assays are pending and an updated Mineral Resource Estimate and Feasibility Study are planned for H1 2027.
Sterling Expands Mineralized Footprint to 2km With Near Surface Intercept in 850m Eastern Step Out
Sterling Metals reported initial assays from three holes drilled from a new pad about 850m east of its MEPS copper zone at the Soo Copper Project in Ontario, with SC-26-20 returning 206.2m grading 0.28% CuEq from 49.8m to 256.0m. The company says the eastern step-out expands the drilled mineralized footprint to approximately 2km east-west.
Westward Gold Announces Appointment of Mr. Andrew Lee to Board of Directors
Westward Gold Inc. has appointed Andrew Lee to its Board of Directors as Independent Director, effective October 28, 2026, replacing Allan Fabbro, who had served in that role since June 2023. Lee is Vice President, Finance at Wheaton Precious Metals Corp. and a director of Pacific Empire Minerals Corp.
Tuesday, Oct 27, 202618 releases
Athena Announces $1 Million Non-Brokered Private Placement
Athena Gold Corporation (CSE: ATHA) announced a non-brokered private placement to raise up to $1,000,000 through up to 5,000,000 units at $0.20 per unit. Each unit consists of one common share and one common share purchase warrant exercisable at $0.25 for 36 months. Proceeds will advance exploration and development at the Laird and Forester properties in Ontario, plus working capital.
Awalé Connects Charger 1 and Charger 2 – Extending Gold Mineralization Across 300 Metres of Strike, Including 8.7 g/t Gold over 25 Metres and 7.0 g/t Gold over 28 Metres
Awalé Resources reports step-out diamond drilling at its Charger target in the Odienné Project, Côte d'Ivoire, connecting Charger 1 and Charger 2 over approximately 300 metres of strike. Highlights include 8.7 g/t gold over 25 metres in CHDD-62 (Charger 2) and 7.0 g/t gold over 28 metres in CHDD-52 (Charger 1), with results from a further 33 Charger holes pending.
Camino and Nittetsu Launch Next Phase of Detailed Engineering for the Puquios Copper Project in Chile with Ausenco
Camino Minerals Corporation (TSXV: COR) announced that it has held the kickoff meeting to launch the next phase of detailed engineering services with Ausenco Chile Ltda. for the Puquios copper project in Chile. The launch follows the successful completion of the Critical Engineering Phase study with Ausenco.
Emperor Resumes Fully Funded Drilling Program at Duquesne West
Emperor Metals (CSE: AUOZ) said it has resumed diamond drilling at its Duquesne West Gold Project in Quebec's Southern Abitibi Greenstone Belt after a planned pause used to incorporate new assay results into an updated AI-assisted three-dimensional geological model. The company said it remains fully funded and expects to provide additional assay results and exploration updates as drilling progresses.
Gold X2 Announces Definitive Agreements for Proposed Spin-Out of Net Smelter Royalty to Shareholders
Gold X2 Mining has entered into definitive agreements for the proposed spin-out of a 1.0% net smelter return royalty on the Moss Gold Project in Ontario to shareholders, through a new subsidiary, SpinCo. Under a plan of arrangement, Gold X2 shareholders would receive one-fifth of one SpinCo share for each Gold X2 share held. The arrangement requires shareholder, Supreme Court of British Columbia and TSX Venture Exchange approvals, and SpinCo shares will not be listed immediately after closing.
Juggernaut Confirms Area Of 550 M By 500 M Of Extensive High Grade Gold Mineralization With Surface Samples Up To 7.68 Oz/T Gold On Goldswarm That Remains Open And Drill Ready On New District Scale Gold Silver Copper Discovery On 100% Controlled Big One Property, Golden Triangle, B.C. (PDF Link)
Juggernaut Exploration reports 2026 surface grab samples at its Goldswarm Discovery on the Big One property in the Golden Triangle, British Columbia, with gold assays up to 239.02 g/t Au (7.68 oz/t Au). The company says gold mineralization is confirmed over an area of 550 m by 500 m that remains open and drill ready, with an inaugural drill program planned for 2027. The release also gives Motherlode Zone drill results, including hole BO-26-29 at 2.57 g/t Au over 3.00 m.
Lahontan Gold Provides Corporate Update on Santa Fe and West Santa Fe Drill Programs
Lahontan Gold provides a corporate update on drilling at its Santa Fe Mine Project and nearby West Santa Fe Project in Nevada's Walker Lane, with 13,334 metres of drilling completed year to date. The update reports 2,092 metres of diamond core drilling, 1,976 metres of sonic core drilling and 31 RC holes totaling 7,497 metres at Santa Fe, and nine West Santa Fe RC holes totaling 1,769 metres, with results pending for the remaining holes.
Lion Rock Receives State and County Permits for Pegmatite Extraction & Bulk Sampling
Nevada King Intercepts 2.58 g/t Au Over 29.3m From Surface and Bottoming in Mineralization at East Ridge and Continues to Expand Near Surface Oxide Gold at Silver Park
Nevada King Gold reported assay results from its Rotary Air Blast (RAB) reconnaissance drilling at the East Ridge Target and Silver Park Target within its 100%-owned Atlanta Gold Mine Project in eastern Nevada. Hole AT26ERB-70 intersected 2.58 g/t Au over 29.3m from surface, ending in mineralization, and the RAB drilling is limited to a maximum depth of 30 metres. The Company plans deeper RC drilling to test the mineralized systems at depth.
NexGold Reports Progress on Development Activities at the Goldboro Gold Project in Nova Scotia
NexGold Mining Corp. reported progress on development of its 100%-owned Goldboro Gold Project in Nova Scotia through mid-October 2026, including early works construction that commenced in mid-September and an updated Feasibility Study it expects to complete by the end of Q4 2026. The release also reports completion of the 716,619-share issuance to Sprott Streaming in satisfaction of a US$675,000 quarterly royalty minimum payment.
Osisko Gold Provides Construction Progress Update on the Cariboo Gold Project
Osisko Gold Group provided a construction progress update on its 100%-owned Cariboo Gold Project in British Columbia, reporting about 28% overall completion based on approximately $355 million incurred through September 30, 2026, with an estimated remaining cost to complete of approximately $907 million. The company said the project remains on schedule for first gold pour in Q1 2029 and commercial production in H2 2029, with detailed engineering about 42% complete and over 50% of procurement packages awarded.
QGold Completes First Milestone Payment for Quartz Mountain Gold Project Through Share Issuance
QGold has completed the first annual milestone payment to Alamos Gold under the Share Exchange Agreement for the Quartz Mountain Gold Project in Oregon, paid by issuing 22,859,861 common shares at a deemed price of C$0.1937 per share, for an aggregate value of approximately C$4,427,955 (US$3,150,000). Alamos now holds 36,784,563 common shares, or 16.96% of the outstanding shares, and the Payment Shares carry a statutory hold expiring February 23, 2027.
Salazar Resources Provides El Domo Construction Update, Initiates Drill Program at Tarqui and Engages IR firms
Salazar Resources Ltd. (TSXV: SRL) reports that Silvercorp's El Domo construction was hit by rainfall 489% above the six-year average in its fiscal second quarter, with works suspended during 77 days of rain, and that drilling has started at the Yumi gold-silver veins on its 100%-owned Tarqui project. The company also engaged Minera IR Inc. for investor relations at C$6,000 per month and Market Equities Limited for corporate communications at US$100,000, both subject to TSXV acceptance.
Sankamap Discovers 1,000 Metre Long New High-Grade GoldSystem at North Fauro Property
Sankamap Metals (CSE: SCU) reports discovery of a new hydrothermal gold system about 1,000 metres long at its 100%-owned Fauro Property in the Solomon Islands, based on rock sampling in the northern portion of the property. Rock samples returned gold assays of 18.85 g/t, 9.57 g/t, 9.53 g/t and 5.98 g/t, with molybdenum up to 446 ppm. Only 12% of 1,245 rock samples from the 2026 program have been reported, and the discovery zone has never been drill tested.
Sitka Gold Completes 60,000 Metre Diamond Drill Program at its RC Gold Project in Yukon; Appoints Termuende as Chairman of the Board
Sitka Gold Corp. has completed its planned 60,000 metre diamond drilling program at its 100% owned RC Gold Project in Yukon, with 59,531 metres in 149 holes drilled and results pending for 90 holes totalling approximately 30,242 metres. The company also appointed Tim Termuende to its Board of Directors as Chairman.
Sterling Metals Announces Board and Management Changes
Sterling Metals elected Richard Patricio to its board at its annual and special shareholder meeting held October 26, 2026. The company also appointed Albert Contardi as Non-Executive Chairman, replacing Mark Goodman, who will remain a director.
West Red Lake Gold Reports Q3 2026 Production and Continued Operational Momentum at the Madsen Mine
West Red Lake Gold reported Q3 2026 gold production of 7,859 ounces at its Madsen Mine in Ontario's Red Lake district, bringing year-to-date output to 22,102 ounces. The company also revised its 2026 Madsen production guidance to 27,000 to 32,000 ounces, down from 35,000 to 45,000 ounces, citing labour challenges and the ramp-up expected in the second half.
White Gold Intersects 2.73 g/t Gold over 21.8m, including 4.18 g/t Gold over 8.8m, Extending VG Deposit High-Grade Mineralization 120m Down-Plunge to 350m
White Gold Corp. reports hole QV26-025 at its VG Deposit in Yukon, Canada, returned 2.73 g/t Au over 21.75m, including 4.18 g/t Au over 8.80m, from 259.25m, extending mineralization about 350m down-plunge. Five holes at Ryan's Surprise also extended the stacked lens system about 50m to both the west and east.
Monday, Oct 26, 202621 releases
Argenta Silver Identifies Potential Second Silver System – Near-Surface – at El Quevar; Mobilizes Third Drill Rig to Test Surface Mineralization
Argenta Silver reports four newly drilled shallow holes at the Mani target, 700 to 800 meters south of its Yaxtché deposit at the El Quevar Project in Salta Province, Argentina, with silver mineralization from or near surface, including QVD-482 at 249 g/t Ag over 22.0 m from 2.0 m. The company says the results support a potential second silver system separate from Yaxtché and has mobilized a third drill rig to conduct a 20-hole shallow drilling program at Mani.
Azimut’s New Exploration Results Support Large-Scale Gold Vein Field at Wabamisk
Azimut Exploration reports that a 3-kilometre by 5-kilometre gold-bearing vein field has been recognized over the Rosa-Dome Sector at its Wabamisk Property in Québec's James Bay region, with the area largely untested by drilling. A new gold showing, Ginger, returned up to 3.71 g/t Au in grab samples and 1.40 g/t Au over 2.0 m in a channel sample, and the company plans a minimum 7,000-metre diamond drilling program later this year.
BLACKROCK SILVER AWARDS CIVIL ENGINEERING WORKS TO NEWFIELDS FOR PERMIT DESIGNS ON THE TONOPAH WEST PROJECT
Blackrock Silver's Nevada subsidiary, Blackrock Gold Corp., has signed a service agreement with NewFields Mining Design & Technical Services, LLC to prepare construction-level designs for permitting an exploration decline, test mining and 50,000 tonnes (55,000 tons) bulk-sample extraction at its Tonopah West project in Nye and Esmeralda Counties, Nevada. Designs are anticipated by year end, with submission to Nevada's Bureau of Mining Regulation and Reclamation expected in January 2027, and approvals expected to take about 240 to 270 days after submission.
Blue Sky Uranium Highlights Amarillo Grande in 2026 NEA/IAEA Global Uranium Report
Blue Sky Uranium reports that its Amarillo Grande uranium-vanadium project in Argentina, including the Ivana deposit, is included in the 2026 NEA/IAEA "Red Book," Uranium 2026: Resources, Production and Demand. The report lists Ivana as having the largest uranium resource among Argentina's seven deposits when inferred resources are excluded, and notes that the Company's resource figures are not reported under NI 43-101 standards.
Clean Air Metals Announces Auditor Review of Q2 Financial Statements
Clean Air Metals said its auditor, Manning Elliott LLP, completed a review as of October 22, 2026 of its second quarter interim financial statements for the six months ended July 31, 2026, which are included in its October 14, 2026 management information circular. No amendments were made other than removing the "Notice of No Auditor Review." The review relates to the annual general and special meeting scheduled for November 13, 2026.
Fury Intersects 14.95 g/t Gold over 4.25 Metres at Eau Claire, Extending High-Grade Mineralization 60 Metres Up-Dip
Fury Gold Mines reports additional Phase 2 drill results from its Eau Claire Gold Project in Quebec's James Bay region, led by hole 26EC-131 with 14.95 g/t gold over 4.25 metres true width, about 60 metres up-dip from historical hole ER15-572. Three other holes returned 13.15 g/t gold over 1.50 metres, 6.81 g/t over 1.39 metres and 7.03 g/t over 1.50 metres. Results will be included in the next mineral resource update.
GR Silver Mining Welcomes Shareholder Support at AGM
GRG Resources Corp. Announces Binding Offer to Sell 1.5% NSR Royalty to Mogotes Metals for $13 Million
GRG Resources Corp. has entered into a binding offer with Mogotes Metals Inc. to sell its 1.5% net smelter returns royalty on the Filo Sur Project for $13,000,000, comprised of $6,500,000 in cash and $6,500,000 in Mogotes Metals common shares. A definitive agreement is still to be negotiated, and completion is targeted by December 29, 2026, subject to conditions including TSX-V approval.
Gunnison Copper Officially Begins Trading on NYSE American Under Ticker "GUNN"
Gunnison Copper's American Depositary Receipts began trading today on the NYSE American under the ticker GUNN, with each ADR representing 30 common shares. The listing is not a new offering, and no capital is being raised; ADR issuance fees are waived through January 23, 2027.
Latin Metals - Q3 2026 Update
Latin Metals' Q3 2026 update reports that, as of end-September, it has about US$179 million in potential partner investment under option agreements and 195,000 metres of aggregate drilling commitments, up from US$16.4 million and 15,000 metres in September 2024. The release also covers the Minsur option on the Lacsha Copper Project in Peru, the Organullo Gold Project option to Aumin in Argentina, and C$1.875 million raised from warrant exercises in September.
Lode Gold Initiates Exploration to Evaluate Upside Potential at Historic High-Grade Mines Within Fremont Gold Mine
Lode Gold is initiating exploration to evaluate additional gold potential at its 100%-owned Fremont Gold Mine on privately owned patented land in Mariposa County, California. The work will cover all seven deposits and nine additional exploration targets, and the company is reviewing French Mine, a historical high-grade mine, as the first satellite deposit under review.
Morien Announces Strategic Aggregate Royalty Alliance with Rife Royalties
Morien Resources has signed a non-binding term sheet with Rife Royalties to form an alliance for acquiring construction aggregate royalties in the United States and Canada. Under the proposed structure, Morien would source and evaluate opportunities, Rife would provide acquisition capital, and Morien could earn up to an 8% beneficial interest in each royalty acquired, subject to a definitive agreement.
NevGold Appoints Sean Waller to Board of Directors; Key Addition of Project Development and Mineral Process Engineering Expertise
NevGold Corp. has appointed Sean I. Waller, M.Sc. Eng., FCIM, to its Board of Directors, effective immediately, as the Company enters its Engineering Phase. Waller is a mineral processing engineer with over 40 years of international experience in project development and was previously a Vice President of AMEC Mining and Metals.
New Break Refines Targets as 2026 Drilling Resumes at its Moray Gold Project
New Break Resources says drilling has resumed at its 100% owned Moray gold project, 49 km southeast of Timmins, Ontario, with a fall 2026 program expected to comprise a minimum of 1,500 metres in approximately four to six drillholes. The first hole is intended to be the deepest drilled on the property, targeting hematite altered mafic volcanics in the Zavitz gold zone at a 70 degree dip.
Onyx Gold Drills 166.0 Meters of 0.7 g/t Gold at Argus Main and Extends Argus Trend to 2.6 Kilometers with New Gold Intercepts at Big Break and JM
Onyx Gold reports assay results from 31 additional drill holes at its Argus Gold System and Pipestone Fault corridor on the 100%-owned Munro-Croesus Project, 75 kilometers east of Timmins, Ontario. Highlights include 0.7 g/t Au over 166.0 m at Argus Main (MC26-343) and 18.8 g/t Au over 2.3 m at JM (MC26-350), and gold is now identified along an approximately 2.6 km trend.
Perpetua Resources Awarded Up to $40 Million in U.S. Army Funding to Advance Domestic Tungsten Supply for American Defense
Perpetua Resources announced a new 36-month, $40 million award through the U.S. Army's Defense Ordnance Technology Consortium to evaluate producing tungsten concentrate at its Stibnite Mining District project in Idaho. The cost-share program will fund drilling, metallurgical testing and permitting and engineering of an exploration decline. The initial 18-month phase is expected to cost about $18 million, shared equally with the Army.
Puma Exploration Announces Kinross Gold Corporation’s Ongoing Commitment
Kinross Gold plans to fund another year of exploration at Puma Exploration's Williams Brook Project in Northern New Brunswick under the current Option Agreement. Year 3 includes a minimum $3M work commitment, pending Kinross Board approval, with the final budget and program to be confirmed before the 2026 year-end.
Red Metal Defines 3-Kilometre Chargeability Trend Along Copper Gold Bearing Vein Structures at Carrizal
Red Metal Resources reported final results from 2D and 3D induced polarization and resistivity surveys over its Carrizal copper-gold-cobalt property near Vallenar, Chile, identifying a chargeability trend about 3 kilometres long that follows mapped veins to depths of 350 to 500 metres. The highest-priority target is a roughly one-kilometre anomaly along the Gorda vein extending to about 550 metres, tested by only one drill hole. The release also announces the engagement of Oak Hill Financial Inc. for advisory and investor relations services, at $12,000 per month.
SLAM Completes Goodwin Drill Program Highlighted By New Discovery 2,000 Meters Northwest Of Logan Zone And 1.53% Cu-Eq Over 14.45 Meters; New SLAM President Hosting Exhibit At The 2026 NOIC
SLAM Exploration reports results from its 2026 diamond drilling program on the Goodwin Copper-Nickel-Cobalt Project in New Brunswick's Bathurst Mining Camp. Nineteen holes totaling 3,350 core-meters tested VTEM conductors, and hole GW26-33 returned 14.45 core-meters grading 1.53% Cu-Eq 95%, while GW26-36 opened a new sulphide mineralization area about 2,000 meters northwest of the Logan zone. Assays for 213 samples remain pending.
Snowline Gold Appoints Randy Smallwood to Board of Directors
Snowline Gold has appointed Randy Smallwood to its Board of Directors as an Independent Director, effective October 26, 2026. Smallwood is non-executive Chair of Wheaton Precious Metals Corp., where he served as President and CEO from 2011 to March 2026, and co-founded the company in 2004.
Thunder Gold Intersects Continuous Gold Mineralization Averaging 0.407 g/t Au Over 336.0 Metres and 0.527 g/t Au Over 290.1 Metres at Tower Mountain, Ontario
Thunder Gold Corp. reports infill drilling at its Tower Mountain Property, 40 kilometres west of Thunder Bay, Ontario, with hole TM26-223 intersecting 0.527 g/t Au over 290.1 metres and hole TM25-188/188X intersecting 0.407 g/t Au over 336.0 metres. Both intervals are within the Inferred component of the 2026 Mineral Resource Estimate, and the company says all thirteen infill holes to date are reconciling to the model with drilled grades about 5% higher than predicted.
Friday, Oct 23, 20268 releases
Quarterly Report to 30 September 2026
Alkane Resources reported a Q1 FY27 gold equivalent production of 40,740 AuEq oz at an AISC of $2,805/AuEq oz, with cash and bullion of $440 million after paying its maiden dividend of 2 cents per share, fully franked. The quarterly report also reaffirms FY27 gold equivalent production guidance of 163-177koz at an AISC of $2,900-$3,200 per ounce.
Copper Fox Announces Change to Financial Year-End
Copper Fox Metals has elected to change its fiscal year-end from October 31 to December 31, aligning it with the Schaft Creek Joint Venture's year-end. The company has submitted a request to the Canada Revenue Agency for approval of the change and has filed a Notice of Change of Financial Year-End on SEDAR+.
GoldMining Releases 2025 Sustainability Report
GoldMining Inc. has published its fourth annual Sustainability Report, covering fiscal 2025. The report lists zero lost-time incidents among employees, 1,887 hours of health, safety and emergency-response training, and 100% of drill sites reclaimed in fiscal 2025.
Japan Gold Announces Results of Annual General Meeting
Japan Gold's annual general meeting, held October 22, 2026 in Vancouver, approved all board resolutions in its September 11, 2026 information circular, including fixing the board at seven directors and continuing the 2023 Omnibus Equity Incentive Plan. Seven directors were re-elected, and the board then reappointed Victor Flores and Tania Tchedaeva, increasing it to nine members.
Koryx Copper Interview with Crux Investor | October 2026
Nicola Mining Provides Merritt Mill Operational Update
SLAM Mobilizes Drill Team To Moose Lake, Intersecting Broad Zones Of Brecciated And Altered Rock With Visible Stibnite Along The Moose Lake Fault Zone
SLAM Exploration has mobilized its drill team to the Moose Lake Gold-Antimony-Silver Project in New Brunswick after completing its Goodwin campaign. Two NQ diamond holes, ML26-01 (77.0 meters) and ML26-02 (147.5 meters), totaling 224.5 meters, were drilled beneath antimony-bearing trenches along the Moose Lake Fault Zone, with assay results pending.
Starcore Announces Results of Annual General Meeting
Starcore International Mines reported results of its annual general meeting held October 23, 2026, at which 19.28% of eligible shareholders were present. Shareholders elected all six management-nominated directors, with votes for ranging from 97.81% to 99.34%, and approved all other matters with over 96% support, including the appointment of Baker Tilly WM LLP as auditors and a Stock Option Plan.
Thursday, Oct 22, 202626 releases
Aztec Extends Oxide Gold Silver Mineralization Up To 190 M West At The North Extension At Tombstone Arizona Including 1158 M Of 067 Gt Aueq 052 Gt Au 811 Gt Ag In Tr26 45
Aztec Minerals reports results from nine reverse circulation drill holes (TR26-45 to TR26-53) at its Tombstone Property in southeastern Arizona, all of which intersected oxide gold-silver mineralization. Hole TR26-45 returned 115.8 m averaging 0.52 g/t Au and 8.11 g/t Ag (0.67 g/t AuEq) from 51.8 m, and the western step-outs extend the known oxide footprint about 190 m west of the North Extension. The maiden Mineral Resource Estimate is expected in November 2026, with assays pending for 22 further holes.
Brixton Metals Announces Closing of Option Agreement to Acquire a 100% Interest in the Silver Focused Silvergruvan Project in Sweden
Brixton Metals announced that the TSX Venture Exchange approved for filing its option agreement with McKnight Resources AB to acquire a 100% interest in the Silvergruvan Property in Hällefors Municipality, Örebro County, Sweden. The option effective date is October 21, 2026. To exercise the option, Brixton must make share issuances totaling $1,500,000 and exploration expenditures totaling $3,300,000 over the option period.
Canagold Drills 69.8 g/t Gold (Au) over 2.6m; Within 4.64m Averaging 52.8 g/t Au and 0.83% Antimony (Sb)
Canagold Resources has reported assay results from three additional holes (NP26-07, NP26-08 and NP26-09) in its 14-hole, 7,277 m drilling program at the New Polaris Gold Project in northwestern British Columbia. The highlight is 52.8 g/t Au and 0.83% Sb over 4.64 m from 503 m down hole in NP26-08, including 69.8 g/t Au and 0.13% Sb over 2.64 m.
Cassiar Gold Announces Insider-Led Private Placement for up to $3 Million
Cassiar Gold plans a non-brokered private placement of up to $3,000,000, with hard dollar units at $0.35 and flow-through units at $0.50, and insiders will participate. The release also reports TSX Venture acceptance of 500,000 units to the Dease River First Nation at a deemed price of $0.52 under their Exploration Agreement.
Dryden Gold Continues to Expand the Gold Rock Gold System
Dryden Gold reports additional assay results from its ongoing drill campaign at the Gold Rock Gold System in the Dryden District of Northwestern Ontario. Highlights include hole DGR-078 returning 8.57 g/t gold over 1.10 meters and hole DGR-087 returning 3.23 g/t gold over 1.60 meters, with 12.62 g/t gold over 1.85 meters, including 54.40 g/t over 0.40 meters, from the Elora Hanging Wall area.
E3 Lithium Approaches Completion of Phase 2 of its Demonstration Facility and Outlines Path to Commercialization
E3 Lithium says Phase 2 of its Demonstration Facility at the Clearwater Project in Alberta is approaching completion, with Phase 2 having moved more than 60,000 m3 to date. The company outlines a path toward shovel-ready status, Final Investment Decision and commercial production of approximately 12,000 tonnes of battery-grade lithium carbonate per year in Stage 1, with the 30-column DLE system restart planned for Q4 2026.
Eminent to Attend the 52nd Annual New Orleans Investment Conference
Eminent Gold Corp. (TSXV: EMNT) will attend the 52nd Annual New Orleans Investment Conference at the Hilton New Orleans Riverside from October 28 to 31, 2026. President and CEO Dr. Dan McCoy will present on Thursday, October 29, 2026, at 3:25 p.m. and will be available to meet investors during the conference.
Fitzroy Minerals and Fleet Space Technologies Use Machine-Learning to Define 9 Untested Targets at the Buen Retiro Copper Project, Chile
Fitzroy Minerals reports results of an integrated seismic and machine-learning targeting study, completed with Fleet Space Technologies, at its Buen Retiro Copper Project near Copiapó, Chile. The model identified nine new, untested target areas within 400 metres of surface, and Fitzroy has started a 5,000-metre diamond and RC drilling program to test them.
Fortuna to release third quarter 2026 financial results on November 4, 2026; Conference call at 12 p.m. Eastern time on November 5, 2026
Green Bridge Metals Launches Early Engagement Efforts with Tribal Rights Holders and Community Stakeholders in Minnesota, Including Cultural Monitoring at Titac North
Green Bridge Metals says it has qualified Tribal cultural monitors at each proposed drill site in northeastern Minnesota ahead of a six-hole drill program at Titac North, set to begin in mid-October 2026. The release also describes an early engagement initiative with Tribal rights holders and community stakeholders, including outreach for initial meetings, and says IBA has flagged no concerns at the sites reviewed so far.
Gunnison Copper Hosts Secretary of the Interior Doug Burgum and Congressman Juan Ciscomani, Highligh...
Gunnison Copper hosted U.S. Secretary of the Interior Doug Burgum and Congressman Juan Ciscomani at its producing Johnson Camp Mine in Cochise County, Arizona, on October 20, 2026, and dedicated Gunnison Copper Patriots Plaza. The company also announced planned one-time equity awards with a target value of US$2,500 per eligible permanent employee, and anticipates NYSE American trading under GUNN on or about October 26, 2026.
Kenorland Minerals Announces $11 Million Non-Brokered Private Placement
Kenorland Minerals Ltd. (TSXV: KLD) plans a non-brokered private placement of up to 5,238,095 common shares at $2.10 per share, for gross proceeds of up to CAD $11,000,000. The financing is expected to close on or about November 3, 2026, subject to conditions including TSX Venture Exchange approval, and proceeds will fund exploration, potential property acquisitions and working capital.
LatAm Lithium Announces AGM Results
LatAm Lithium Corp. reports that shareholders approved all management resolutions at its Annual General and Special Meeting held October 22, 2026. Approved items include setting the number of directors at four, electing Rodney Campbell, Jeremy Wright, Stephen J. Wilkinson and Brian Crawford to the board, and a share consolidation on the basis of three pre-consolidation common shares for one post-consolidation common share.
Minaurum Discovers Blind Silver Vein Grading 669 g/t AgEq Over 2.05 Metres, Highlighting Potential for Additional Blind Veins of Scale; Resource Expansion Drilling Returns 367 g/t AgEq Over 2.65 Metres at Europa Sur at the Alamos Silver Project
Minaurum Silver reports the discovery of the Africa vein zone, a previously unrecognized blind vein at its Alamos Silver Project in Sonora, Mexico, with hole AL26-268 returning 669 g/t AgEq over 2.05 metres. Resource-expansion drilling also returned 367 g/t AgEq over 2.65 metres at Europa Sur, part of the ongoing Phase II, 50,000-metre program.
NevGold Extends Oxide Mineralization By Over 100 Meters: 7.27 g/t AuEq Over 3.0 Meters (6.18 g/t Au, 0.28% Sb) Within 1.55 g/t AuEq Over 32.0 Meters (0.92 g/t Au, 0.16% Sb); And 8.04 g/t AuEq Over 3.0 Meters (0.36 g/t Au, 1.98% Sb) Within 0.42% Sb Over 42.7 Meters
NevGold Corp. reported additional gold-antimony assays from the 2026 drill program at its Limousine Butte Project in Nevada, including 7.27 g/t AuEq over 3.0 meters within 1.55 g/t AuEq over 32.0 meters (hole LB26-011) and 8.04 g/t AuEq over 3.0 meters within 0.42% Sb over 42.7 meters (hole LB26-008). The company says the results extend mineralization over 100 meters east of the Resurrection Ridge resource, with 38 holes still awaiting assays.
New Found Gold Announces Queensway Gold Project Revised PEA and Updated MRE: After-Tax NPV Increases to $1.7 B with 126% IRR; Measured and Indicated Mineral Resource Increases by 38%
New Found Gold reported a revised Preliminary Economic Assessment (PEA) and updated Mineral Resource Estimate (MRE) for its 100%-owned Queensway Gold Project in Newfoundland and Labrador. The PEA shows an after-tax NPV5% of $1.728 billion and a 126% IRR at US$3,600 per ounce of gold, and the Measured and Indicated Mineral Resource increased 38% to 1.920 Moz Au.
Pirate Gold Corp. Closes Brokered Private Placement for Aggregate Gross Proceeds of $13.6 Million
Pirate Gold Corp. has closed its brokered private placement for aggregate gross proceeds of $13,609,430. The offering issued 48,277,000 flow-through common shares at $0.215 each and 13,050,000 special flow-through common shares at $0.2475 each, and remains subject to final TSX Venture Exchange approval.
Scottie Resources Reports 27.9 g/t Gold over 4.15 m and 51.6 g/t Gold over 2.25 m at Blueberry Contact Zone
Scottie Resources reported further drill assays from its 2026 program at the Blueberry Contact Zone within the Scottie Gold Mine Project, 35 kilometres north of Stewart, BC. Hole SR26-509 returned 27.9 g/t gold over 4.15 m, including 65.0 g/t gold over 1.65 m, at the Lemoffe 1 vein, and hole SR26-504 returned 51.6 g/t gold over 2.25 m, including 84.1 g/t gold over 1.25 m, at the Fifi vein zone.
Scottie Resources Announces Closing of Second and Final Tranche of Non-Brokered Private Placement
Scottie Resources closed the second and final tranche of its non-brokered private placement, issuing 823,369 offered shares (including 128,369 flow-through shares) for gross proceeds of C$2,413,443.90. Common shares were priced at C$2.90 and flow-through shares at C$3.10. Including the first tranche, the non-brokered offering raised C$14,921,111.80, and the offering remains subject to final TSX Venture Exchange acceptance.
Silver Storm Announces Participation in the 2026 New Orleans Investment Conference
Silver Storm Mining will participate in the 2026 New Orleans Investment Conference, running October 28-31, 2026, at the Hilton New Orleans Riverside hotel. The company is at Booth #137 and will host a corporate breakfast on Thursday, October 29, 2026, from 7:15 am to 7:45 am in room Churchill B2, to discuss ramp-up of operations at the La Parrilla Silver Complex toward steady-state production by 1Q 2027.
Sranan Gold Reports 3-Metre Channel Sample Grading 20.89 g/t Gold at Lawatino’s 101 Zone
Sranan Gold reports a 3-metre channel sample from trench 26LACH-008 at the 101 Zone on its Lawatino Gold Project in southeastern Suriname grading 20.89 g/t gold, including 1 metre grading 55.04 g/t gold. Grab samples from the 101 Zone also returned up to 57.58 g/t gold, and the company plans to start mobilizing drilling equipment to Lawatino in early 2027.
Sun Peak Recommences Drill Program at the Safra VMS Project, Saudi Arabia
Sun Peak Metals Corp. announced that a 3,000-meter diamond drill program with two drills is underway at its 100%-owned Safra copper-zinc-gold-silver VMS Project in the Kingdom of Saudi Arabia. The program will test extensions of Safra Main, the untested Safra North and Safra East target areas, following up on the May 2026 maiden campaign in which all seven holes drilled at Safra Main intersected mineralization.
Proactive Investors, October 2026
Sunday Lake Gold Corp. Graduates to OTCQX® Best Market in the United States
Sunday Lake Gold Corp. has qualified to trade on the OTCQX Best Market, upgraded from the OTCQB Venture Market, and begins trading today under the symbol "WLBMD." The company holds a 598 km² property position along the Detour-Fenelon gold trend in Quebec's Abitibi region.
Sunday Lake Gold Corp. Begins Trading on OTCQX Best Market
White Gold Corp. Announces Completion of First Tranches of Fully Subscribed $10M W2 Critical Minerals Corp. Subscription Receipt Financing
White Gold Corp.'s subsidiary W2 Critical Minerals Corp. closed the first and second tranches of its non-brokered private placement of subscription receipts, with gross proceeds of $5,763,750 from the first tranche and $1,000,000 from the second, which included Agnico Eagle Mines Limited. The remaining balance of the up to $10 million offering is fully subscribed and will close in due course, in connection with the planned spin-out of W2.
Wednesday, Oct 21, 202613 releases
Axo Metals Receives Approval to Trade on the OTCQB Venture Market Under the Symbol AXOCF
Axo Metals Corp. has been approved to trade on the OTCQB Venture Market in the United States under the symbol AXOCF, beginning October 21, 2026. Its shares continue to trade on the TSX Venture Exchange under AXO, and they are also now eligible for electronic clearing and settlement through DTC.
- Capacitor Metals Corp.Study results
Capacitor Metals Corp. Engages SRK Consulting for updated Preliminary Economic Assessment for the Upper Fir Tantalum & Niobium Deposit, British Columbia
SRK Consulting has been engaged to complete an updated NI 43-101 compliant Preliminary Economic Assessment for the Upper Fir Tantalum and Niobium Deposit in British Columbia, with completion expected within Q1 2027. SRK visited the Blue River site in early September, reviewing portions of the +59,000 metres of prior drilling and the bulk sample pits from which about 2,000 tonnes were extracted before the 2011 Amec PEA. The study will factor in current tantalum and niobium prices and currency exchange changes.
Discovery Announces Details of Third Quarter 2026 Results Conference Call and Webcas...
Gemdale Gold Completes Phase 2 2026 Drill Program at its Pontio Gold Project, Finland
Gemdale Gold Inc. reports completion of its Phase 2 2026 infill drill program at its Pontio gold project in Finland, consisting of 2,860 metres across 14 holes, primarily infilling the S1 Sector to a 50-metre drill profile spacing. Assay results from the program are expected over the coming weeks and months, and preliminary metallurgical test work results are anticipated in the coming weeks. The company plans a maiden Mineral Resource Estimate in early 2027.
Golden Cariboo Completes Property Purchase for Camp in Hixon, B.C. to Support Year-Round Exploration
Golden Cariboo Resources has completed the purchase of a 5.36 acre freehold property in Hixon, British Columbia, for a total price of $300,000 CAD, to serve as a camp supporting year-round exploration at its nearby Quesnelle Gold Quartz Mine Property. The property comprises two adjacent lots on Highway 97, and the company has mobilized its Atco 5 unit skid-mounted trailers to the site. Water studies, permitting and septic system engineering for the camp are in progress.
Green Bridge Metals Commences Phase 2 Diamond Drilling Program at the Titac Project, Minnesota, USA
A Phase 2 diamond drilling program has begun at the Titac Project in northeastern Minnesota, comprising six core holes totalling approximately 2,600 metres to a target depth of about 400 metres, spaced roughly 125 metres apart in a fence-style section across the Titac North prospect. The program aims to update the titanium resource model and assess copper and vanadium potential toward a preliminary economic assessment. Titac South hosts an inferred resource of 46.6 million tonnes grading 15% TiO₂ per the September 18, 2024 technical report.
Kingfisher Completes 2026 Drill Program at HWY 37 Project with 13,551 m Drilled, Golden Triangle
The 2026 diamond drill program at the HWY 37 Project in British Columbia's Golden Triangle is complete, with 13,551 m drilled in 24 new holes plus an extension of HW-25-011, finishing October 15, 2026. All nine Hank porphyry holes (about 8,070 m) intersected the porphyry system or its alteration halo, including visual porphyry-style quartz-chalcopyrite-pyrite stockwork from 634 m to 846 m in HW-26-028 and from roughly 778 m to end of hole in HW-26-031. Assays are pending; an approximately 20,000 m program is planned for 2027.
Lavras Gold Approves Fourth Diamond Drill Rig to Fast-Track Cerrito North Drill Testing; Fazenda-Butia LP Application Remains on Track
A fourth diamond drill rig has been approved to begin first-pass testing of the Cerrito North target at the Lavras do Sul Project in Rio Grande do Sul, Brazil, with a 2,000 metre, 22-hole programme (15 holes of 70m, two of 100m, five of 150m) forming part of the approximately 25,000m programme announced September 14, 2026. Cerrito North, 2km north-northwest of the Cerrito deposit, has a 1,600m by 400m gold-in-soil anomaly and rock samples up to 6.52 g/t Au. FEPAM renewed the Fazenda-Butia Terms of Reference to October 7, 2028; the LP application remains targeted for end-December 2026.
Outcrop Silver Extends Santa Ana Vein System Northward and Identifies Parallel Cascada Vein
Drilling at the Santa Ana silver project in Tolima, Colombia returned 1.37 m (0.74 m ETW) grading 1,084 g/t AgEq, including 0.30 m (0.16 m ETW) at 4,725 g/t AgEq, in hole DH687 on the newly delineated Cascada vein, subparallel to and in the footwall of Alaska. Results and interpretation indicate Alaska is the northern continuation of the Santa Ana structure, extending strike length to nearly 3 kilometres, with intercepts of 3.43 m (1.26 m ETW) at 307 g/t AgEq (DH665) and 8.39 m (3.61 m ETW) at 241 g/t AgEq (DH685). Four rigs are drilling, with assays pending.
Quartz to Commence Phase 5 Drilling at Maestro, Targeting Prodigy Expansion and Multiple Potential Sulphide-Mineralized Systems
Phase 5 diamond drilling at the 100%-owned Maestro Gold-Silver Project near Houston, central British Columbia, is scheduled to begin on October 22, 2026. The program will provide first drill tests of previously undrilled IP chargeability anomalies exceeding 30 mV/V with modelled vertical extents of approximately 400 metres north of Prodigy, and step-out drilling to expand the Prodigy discovery. Four prior phases totalled 12,951 metres in 21 holes; permits cover 37 additional drill sites.
Rackla Metals to Present at Kinvestor Day 2026 Virtual Investor Conference
CEO and Director Simon Ridgway is scheduled to present at the Kinvestor Day 2026 Virtual Investor Conference on Thursday, October 22, 2026 at 12:00pm PT / 3:00pm ET. The event includes company presentations, live Q&A sessions, and a roundtable discussion with Adrian Day, Andy Schectman and Garrett Goggin. Rackla Metals is a Vancouver-based junior explorer focused on tungsten and rare earth minerals in the Tombstone-Tungsten Belt of eastern Yukon and western Northwest Territories.
Strategic Metals Grants Incentive Stock Options
Incentive stock options covering up to 3,325,000 common shares have been granted to directors, officers, employees and consultants of Strategic Metals Ltd. (TSX-V: SMD), exercisable at $0.28 per share for five years. The options vest quarterly beginning three months from the grant date. Strategic reports a current cash position of approximately $5 million.
Trilogy Metals Announces Completion of 2026 Field Program at the Upper Kobuk Mineral Projects, Appointment of David Thomas as Senior Vice President, Project Development of Ambler Metals
The 2026 summer field program at the Upper Kobuk Mineral Projects in northwestern Alaska's Ambler Mining District has been completed, with all 42 planned geotechnical, hydrogeological, condemnation and exploration holes drilled over approximately 5,200 meters. Drill-target assessments and mapping were also completed along the 100-kilometer VMS belt, which contains about 30 known historic VMS occurrences and electromagnetic anomalies, to support 2027 drilling. Ambler Metals, a 50/50 joint venture with South32, appointed David Thomas Senior Vice President of Project Development to lead Arctic Project engineering.
Tuesday, Oct 20, 202624 releases
Alkane Drilling Confirms and Extends Gold-Antimony Mineral System at Nagambie, Victoria
Initial drilling at the Nagambie gold-antimony project in Victoria returned 3.3g/t gold and 0.7% antimony over 10.6m (ETW 10.4m) from 156.3m in ADD001, including 17.0g/t gold and 5.9% antimony over 1.3m, plus 1.2g/t gold and 2.5% antimony over 9.7m from 306.3m, and 0.6g/t gold and 0.8% antimony over 22.6m from 592.59m in ADD013. Three holes totalling 1,868m have been drilled since June 2026, intercepting the C2 zone 115m below its previously known extent. Alkane is spending $12.5M over three years to earn 60% of Nagambie, with rights to 80%.
Athena Appoints Jordan Quinn as Vice President of Exploration
Jordan Quinn, P.Geo., has been appointed Vice President of Exploration of Athena Gold Corporation, effective immediately, succeeding Benjamin Kuzmich, P.Geo., who resigned from the role and will continue as Lead Technical Advisor in a consulting capacity. Quinn previously served as Athena's Lead Technical Advisor and has over 10 years of experience, including work at Newmont, Barrick and more than two years as a production geologist at the Musselwhite Mine. Drills are expected to return to the Laird Lake project in Ontario shortly.
Axo Metals Drilling Intercepts 48.0 Metres of 1.18 g/t Au From Surface at Recently Discovered Luz del Cobre Target; Additional Results Include 3.94 g/t Au Over 15.0 Metres
Drilling at the San Antonio project in Sonora, Mexico returned 48.0 metres grading 1.18 g/t Au from surface in hole SOSAP-26-069 at the Luz del Cobre target, about 750 metres east of the Sapuchi resource pit, plus 3.94 g/t Au over 15.0 metres from 12 metres in SOSAP-26-083 and 22.0 metres of 1.62 g/t Au in SOSAP-26-053. Results cover 33 holes and roughly 3,700 metres. Axo also terminated the La Gallina option agreement at La Huerta, Jalisco, retaining the Juanes concession.
Brixton Metals Reports 97.0% Gold Recovery in Initial Metallurgical Work from the Trapper Gold Target
Scoping-level metallurgical testwork by SGS Canada on a single high-grade composite (10.3 g/t Au, 27.6 g/t Ag) from the Trapper Gold Target at the Thorn Project in NW British Columbia returned combined gravity and rougher flotation gold recovery of 97.0%, with gravity recovering 12.3% of gold into a concentrate grading 1,486 g/t Au. Final two infill holes returned 120.00 m of 0.67 g/t gold (THN26-393) and 138.00 m of 0.80 g/t gold (THN26-394). A maiden resource estimate is expected in Q1 2027.
Cadillac Mines Intersects 10.96 Grams Per Tonne Gold Over 4.4 Metres Approximately 75 Metres Down-Dip of Previous Drilling and Identifies a Third Shear at Galloway’s Moriss Zone
Drilling at Dome Continues to Confirm Large-Scale, Open-Pit Potential; New, High-Gra...
Eagle Plains Increases Saskatchewan Royalty Portfolio
Under a purchase and sale agreement dated October 19, 2026, Apogee Minerals Ltd. will acquire a 100% interest in five non-core claim blocks totalling 1,965 hectares adjacent to and within Apogee's Knife Lake Copper Project in east-central Saskatchewan for $20,000 cash and 1,000,000 Apogee common shares. Eagle Plains retains a 2.5% net smelter royalty, 1% of which Apogee may buy for $2,000,000. Closing is subject to TSXV acceptance. Separately, Eagle Plains and Pacific Imperial Mines have terminated the option agreement on the Brownell Lake VMS project.
Eminent Gold to Present at Red Cloud's Fall Mining Showcase 2026
Eminent Gold will present at Red Cloud's Fall Mining Showcase 2026, held in person at the Omni King Edward Hotel in Toronto on October 28 and 29, 2026. Michael Bebek, Head of Communications, is scheduled to present on Thursday, October 29, 2026 at 11:20 AM Eastern Standard Time. The company is drilling in Nevada, with exploration assets including Hot Springs Range, Celts and Gilbert South, and Kinross as a strategic investor.
Emperor Reports Additional Drill Results and Continues to Strengthen Conceptual Phase 1 Open-Pit
Final assay results from seven additional drillholes at the Duquesne West Project in Quebec include DQ26-51 with 26.3 m grading 1.0 g/t Au from about 40 m vertical depth, including 2.0 m at 4.3 g/t Au, and DQ26-22 with 19.2 m at 1.2 g/t Au, including 6.3 m at 2.8 g/t Au. Results have been reported for 51 of 66 holes, with 15 pending. An additional 3,000–5,000 m of fully funded diamond drilling is planned, alongside selective overburden stripping and grade-control drilling within a conceptual Phase 1 open pit to support a possible updated resource estimate and PEA.
Excalibur Reports Gravity Survey Results from Rangefront Target at Bellehelen
A ground gravity survey at the Rangefront Target on the Bellehelen Silver-Gold Project in Nye County, Nevada covered approximately 20 square kilometres over a 6 km by 3.4 km grid with 420 stations at 200 m spacing, completed in September 2026. Results identify a gravity high associated with the Rangefront Fault and subtler features interpreted as fault splays and the Bellehelen Fault intersection, and are being combined with CSAMT, geochemical and geological data to refine drill targets. The Company also granted a director 300,000 incentive stock options on October 19, 2026 at $0.105 per share for five years.
Fortuna intersects 0.96 g/t gold over 350 meters at the Lindero Mine, Argentina
Fox Tungsten Mobilizes Fourth Drill Rig to Advance Exploration at Silverboss Property
Fox Tungsten has mobilized a fourth drill rig to its 100%-owned Silverboss property in south-central British Columbia, starting a dedicated drilling program targeting molybdenum-copper exploration potential. Drilling will initially focus on the 10 Mile Creek target, where the company is testing potential extensions of mineralization associated with the historic Boss Mountain molybdenum mine next door.
Gunnison Copper to Commence Trading on NYSE American October 26, 2026, Under Ticker Symbol "GUN...
Gunnison Copper's American Depositary Receipts are expected to begin trading on the NYSE American under the ticker "GUNN" on or about October 26, 2026, subject to SEC registration effectiveness and final exchange approvals. Each ADR represents thirty common shares, and conversions into ADRs begin October 23, 2026 through BNY.
Headwater Gold Plans Drill Program at Whiskey Project, Nevada
K2 Drills 83.82m of 3.40 g/t Au including 19.81m of 7.51 g/t Au at Dragonfly
Hole DF26-031 returned 83.82m of 3.40 g/t Au from surface, including 48.77m of 4.98 g/t Au from 35.05m and 19.81m of 7.58 g/t Au from 64.01m, at the Dragonfly Zone of the 100%-owned Mojave Project in Inyo County, California. Other holes returned 100.58m of 1.01 g/t Au (DF26-030), 38.10m of 1.38 g/t Au (DF26-029) and 28.95m of 3.11 g/t Au (DF26-032). K2 has drilled 42 holes totalling 8,013m of a 14,000m program, with 27 Newmont Zone holes pending.
Klondike Gold Completes 2026 Drilling, Advances Planned Mineral Resource Estimate Update and Reports Additional Montana Creek Gold Royalties
Approximately 12,446 meters of diamond drilling in 60 holes was completed in 2026 at the 100%-owned Klondike District Project in the Dawson Mining District, Yukon, targeting extensions adjacent to the pit-constrained Lone Star MRE; complete assays remain pending, and an updated NI 43-101 Mineral Resource Estimate incorporating 2022-2026 drilling is targeted for the first half of 2027. Cumulative 2026 Montana Creek placer royalty receipts reached 544.14 ounces of flake gold at roughly 82% purity through October 15, 2026, up 238.6 ounces since August 26, 2026, with about 440 ounces at 99.99% purity credited.
Morien Announces Filing of Initial Project Description for the Lazy Head Aggregate Project
An Initial Project Description for the Lazy Head Marine Terminal, the marine export component of the Lazy Head Aggregate Project near Canso, Nova Scotia, has been submitted to the Impact Assessment Agency of Canada by proponent Carver Mineral Resources, with a provincial Environmental Assessment Registration Document to be filed shortly. The quarry is designed for up to 3.4 million tonnes per year over an approximately 85-year life, with initial capital of about $284 million and an 18 to 24-month construction period. Morien will receive a milestone payment upon permitting and a production royalty, with its costs reimbursed by Carver.
QGold Initiates 2026 Drilling Campaign at Mine Centre
Drilling began September 12, 2026 at the Mine Centre Gold Project in Ontario, with an initial phase targeting mineralised vein systems about 500 m northeast of the Foley Mine and the South Foley area. The first four holes at the Zinc and Twin vein targets south of the historic Foley Mine are complete and subsequent holes have started. A second phase will test targets farther northeast, including the Ferguson showing, Manhattan vein and Golden Star Mine areas, with an initial mineral resource estimate targeted for early 2027.
RIVERSIDE RESOURCES OPTIONS CECILIA PROJECT, SONORA, MEXICO TO CALU
An option agreement has been completed with Calu Resources Corp, under which Calu can earn a 100% interest in the Cecilia Project in Sonora, Mexico by making aggregate cash and share payments of C$1,200,000 and funding C$6,650,000 in exploration expenditures over five years; Calu has paid the initial C$50,000. Riverside's subsidiary Ravena Resources will operate the exploration programs for a 10% management fee, and Riverside retains an existing 2.0% NSR royalty.
Strategic Metals and GGL Resources Property Transaction Approved
Final TSX Venture Exchange acceptance has been received for the Yukon copper-gold properties transaction with GGL Resources Corp., first announced July 27, 2026, with disinterested shareholder approvals obtained August 31, 2026 and GGL completing a four-for-one share consolidation. GGL can earn 70% in the Hopper, Kluane, Batt and Moraine properties in southwest Yukon by issuing 1,000,000 post-consolidation shares by October 31, 2026 and spending $10,000,000 by December 31, 2029, then 100% for a further $3,000,000, leaving Strategic a 2% NSR.
VR Receives NOI Permit with Expanded Drill Site Coverage for its New Boston Moly-Copper-Tungsten- Silver Porphyry Project in Nevada
The Nevada BLM has approved VR Resources' NOI drill permit amendment and associated reclamation bond for the New Boston moly-copper-tungsten-silver porphyry project, doubling permitted drill sites at the Jeep Mine area from 8 to 16 and allowing drilling to proceed. The permit application, submitted September 11, was approved September 16, with the bond submitted October 6 and approved October 9. Earlier hole NB26-003 intersected 317 m at 0.77% CuEq from surface above 419 m at 0.48% CuEq.
Broad Shallow Gold in First Goldenclad Drillhole
Partial assays from GCD001, the first drill hole at Goldenclad (ML960, ML1092 and GL3694) at the Spur Project in New South Wales, returned 83 m @ 1.27 g/t Au from 6 m, including 42 m @ 2.23 g/t Au from 12 m, 6 m @ 3.75 g/t Au from 26 m and 8 m @ 4.83 g/t Au from 46 m. Results cover the upper 100 m only, with the hole continuing towards about 500 m depth. Goldenclad sits about 1 km along strike from the Consols Zone, and a second hole, GCD002, has been collared.
Becoming a substantial holder
White Gold Expands The High Grade Core At Golden Saddle Deposit Intersecting 513 Gt Gold Over 79M Within 147Gt Gold Over 381M And Significantly Extends The Vg Deposit High Grade Mineralization By 90M To 320M Down Plunge Across 150M Of
Drilling at the White Gold Project in Yukon returned 1.47 g/t Au over 38.08 m from 397.12 m in hole WHTGS26D0219 at Golden Saddle, including 5.13 g/t Au over 7.88 m and 10.48 g/t Au over 2.88 m, extending the Main Zone high-grade core about 50 m west at 300 m vertical depth. At VG, hole QV26-026 cut 2.53 g/t Au over 18.90 m from 172.10 m and QV26-024 cut 0.71 g/t Au over 38.45 m, extending mineralization from roughly 230 m to 320 m down-plunge over about 150 m of strike. Assays are pending from 49 additional holes.
Monday, Oct 19, 202622 releases
Azimut and Centerra Amend Option Agreement for the Corvet and Kaanaayaa Properties
An amendment to the option agreement with a wholly owned subsidiary of Centerra Gold Inc. on the Corvet and Kaanaayaa properties in the Eeyou Istchee James Bay region of Quebec reduces Year 6 minimum exploration expenditures under the second option phase from $1,500,000 to $1,250,000, lowering second-option minimum expenditures from $10,000,000 to $9,750,000 and total expenditures for Centerra to earn up to 70% from $16,000,000 to $15,750,000. Cash payments of up to $850,000 and all other material terms are unchanged, subject to TSX Venture Exchange acceptance.
Benton Resources Announces Grant of Stock Options
Benton Resources' board approved the grant of incentive stock options to certain officers, directors, employees and consultants to purchase up to an aggregate of 5,650,000 common shares. The options are exercisable at $0.09 per share and expire on October 16, 2031, subject to the company's stock option plan, applicable vesting provisions and TSX Venture Exchange approval.
2026 Metallurgical Program Achieves 90% Copper Recovery And 88% Gold Recovery At The Hope Brook Gold Project
Locked-cycle flotation testing on mineralization from the 100%-owned Hope Brook Gold Project in Newfoundland produced a concentrate grading approximately 24% copper, 300 g/t gold and 93 g/t silver, with 90.3% copper recovery; leaching of cleaner tails brought overall gold recovery to 88%. Rougher flotation tests showed up to 96.6% gold and 98.6% copper recovery, and gravity testing identified 53.7% gravity-recoverable gold. The work, done at Base Metallurgical Labs under Canenco Consulting, supports a flotation and leaching flowsheet for the company's PEA.
Blue Sky Uranium Commences Field Programs to Test New Discovery Potential at Amarillo Grande Argentina
Exploration field activities have begun at the Amarillo Grande Uranium-Vanadium Project in Río Negro Province, Argentina, starting with greenfield work at Bajo de Valcheta, followed by a pilot radon survey at the Ivana Deposit and radon and lead-isotope surveys along the Ivana Corridor. The agreed program includes approximately 500 metres of RC drilling at the Cuatro target, subject to access and permitting. Activities span twelve months with an approved and funded initial six-month program financed by COAM through IMSA.
Cadillac Mines Announces Appointment Of Two New Officers
Copper Fox Provides Update on 2026 Activities at Schaft Creek Project
A C$9.1 million 2026 program is underway at the Schaft Creek copper-gold-molybdenum-silver project in northwestern British Columbia, operated by the Schaft Creek Joint Venture in which Teck Resources holds 75% and Copper Fox 25%. Work over the past three months included metallurgical testwork on coarse particle flotation and comminution, core-scanning mineralogical characterization, continued environmental baseline data collection, and initiation of tailings, water-balance, geochemical and Access Road Trade-Off studies. Camp and infrastructure upgrades have been completed.
Erdene Provides Q3 2026 Update and Notice of Conference Call and Webcast
Bayan Khundii processed 164 thousand tonnes of ore at 1,788 tonnes per day and 2.3 g/t gold with 96% recoveries in Q3 2026, with Erdene Mongol selling 11,853 ounces of gold and 3,046 ounces of silver at $4,315/oz and $62/oz for $51 million (C$71 million) gross revenue, and repaying $20 million of debt to leave $93 million outstanding. About 16,000 metres of drilling is planned across the Khundii Minerals District in Q4, plus a 102 line-kilometre 3D DCIP and MT survey at Zuun Mod–Khuvyn Khar. Q3 results are due November 4, 2026, with a call November 5 at 9:00 AM ET.
Stonegate Capital Partners Initiates Coverage on Fitzroy Minerals
Stonegate Capital Partners has initiated research coverage on Fitzroy Minerals, publishing an initiation report on the company. Fitzroy trades as TSXV: FTZ, OTCQX: FTZFF and FSE: C3Y.
Heliostar Reports 52.4m Grading 5.84 g/t Gold from the High Grade Panel and C...
Drill results from the 100%-owned Ana Paula project in Guerrero, Mexico include 52.4 m grading 5.84 g/t gold from 46.9 m, including 12.6 m at 17.8 g/t, and 24.8 m at 5.14 g/t from 43.0 m in the High Grade Panel, plus Expansion Zone intercepts of 8.0 m at 6.88 g/t from 469.0 m and 3.4 m at 10.64 g/t from 604.9 m. The 2025-2026 infill program totalling 122 holes and 35,121 metres is complete and will support the Feasibility Study. Heliostar also engaged Native Ads Inc. for investor awareness services for up to twelve months at a cost of up to $200,000.
Lode Gold completes first six holes of expanded 20-hole drill program at Fremont Gold Mine
The first six holes of a 20-hole drill campaign have been completed at the Fremont Gold Mine in Mariposa County, California, with the program expanded by ten holes to 4,200 metres (13,780 feet). Holes PT-J_001 through PT-J_006 were drilled at an azimuth of 240° and dip of -75° to target depths of 105.0 to 171.3 metres for metallurgy and geotechnics, using PQ-diameter core. Samples from the first two holes have been submitted for assay.
McFarlane Lake Mining Outlines Fully Funded 50,000-metre Phase 2 Drilling Program at Juby Gold Project
A fully funded 50,000-metre Phase 2 drilling program is planned over 12-15 months at the 100%-owned Juby Gold Project west of Gowganda, Ontario, with three drills deployed before November 1, 2026 — two on resource expansion and one on infill drilling and new targets — funded by September 2026 financing that raised C$17.25 million gross. A scoping study starts this quarter with results by late Q2 2027, and an advanced exploration closure plan submission is targeted for early 2027. McFarlane also granted 7,270,000 options and RSUs, with options exercisable at $0.48.
Military Metals Announces Reinstatement and Four-Year Extension of Trojarova Antimony-Gold Exploration License in Slovakia
The exploration licence for the Trojárová Antimony-Gold Project in Slovakia has been reinstated and extended for a four-year term expiring October 18, 2030, following the October 2, 2026 annulment of the Ministry of the Environment's May 28, 2026 cancellation decision. Trojárová hosts an inferred mineral resource of 6.5 million tonnes grading 1.02% antimony and 1.06 g/t gold, containing approximately 67,000 tonnes of antimony and 222,000 ounces of gold. The Company will establish a local advisory board and has begun discussions with Slovakia's Ministry of Economy on the pathway to a mining authorisation.
Nicola Mining to Host One-on-One Meetings and Present at the Red Cloud Fall Mining Showcase 2026
Renegade Gold Channels 16.2 g/t Au over 5.0 m, Including 56.1 g/t Au over 1.4 m at BobJo, Confederation Belt, Red Lake, Canada
Surface channel sampling at the BobJo project, about 85 km east of Red Lake, Ontario, returned 16.2 g/t Au over 5.0 m, including 56.1 g/t Au over 1.4 m, along with 4.0 g/t Au over 12.1 m, 11.2 g/t Au over 1.7 m, 4.3 g/t Au over 4.7 m and 1.2 g/t Au over 19.5 m; grab samples returned 65.3, 63.0, 48.6 and 14.6 g/t Au. Mineralization extends over 100 m north of the historic BobJo shaft. The 2026 Confederation Belt greenfields program is complete, with LP-Uchi corridor results pending and targets being advanced toward drill-readiness for 2027.
Notification regarding unquoted securities - RAU
194,000 unquoted options exercisable at CAD 0.175 and expiring 13 June 2028, issued under an employee incentive scheme, were exercised on 7 October 2026, resulting in the issue of 194,000 unquoted common shares. None were held by key management personnel or associates. Following the issue, 79,709,298 common stock and 3,631,000 of the CAD 0.175 options remain on issue, alongside 38,494,751 quoted CHESS Depositary Interests.
Salazar Resources to Begin Drilling the Yumi Gold-Silver Veins at Tarqui, with Porphyry Drilling Planned at Monja, Ecuador
A two-phase drill program follows the closing of a $3,500,000 non-brokered private placement: Phase 1 is approximately 1,500 metres in five holes of about 300 metres each at the previously undrilled Yumi gold-silver veins on the 100%-owned Tarqui project, Morona Santiago Province, Ecuador, starting late October 2026. Phase 2 contemplates up to approximately 3,500 metres in four holes at the Monja copper-gold porphyry from Q1 2027, subject to surface access and permits. Over-limit assay of sample 400362 returned 105 g/t Au and 1,038 g/t Ag.
Silvercorp Reports Operational Results and Financial Results Release Date for the Second Quarter, Fiscal 2027
Q2 Fiscal 2027 (ended September 30, 2026) production at the Ying Mining District totalled 213,320 tonnes of ore processed for 0.9 million ounces of silver, 1,371 ounces of gold, 7.6 million pounds of lead and 0.7 million pounds of zinc, down 41%, 34%, 41% and 51% year over year, with revenue of $72.1 million, down 13%, on realized prices of $61.83 per ounce silver and $3,955 per ounce gold. The GC Mine remains suspended pending an updated mine development design, with production resumption targeted for November 2027. Unaudited interim financial results are due November 5, 2026 after market close.
Stillwater Critical Minerals Files NI 43-101 Technical Report for the Updated Stillwater West Mineral Resource Estimate in Montana, USA
An NI 43-101 technical report dated October 16, 2026 has been filed for the updated mineral resource estimate at the 100%-owned Stillwater West project in Montana, USA, prepared by Mine Technical Services with QPs Timothy O. Kuhl and Dr. Ted Eggleston. The estimate, unchanged from the August 27, 2026 announcement, includes a first Indicated resource of 29.4 Mt grading 0.38% NiTEq and 805.1 Mt grading 0.34% NiTEq Inferred at a 0.20% NiTEq cut-off, plus 6.6 billion pounds of Inferred chromium.
Sun Peak Closes Non-Brokered Private Placement
The second and final tranche of a non-brokered private placement closed on October 16, 2026 for gross proceeds of $1,689,404, bringing total Offering proceeds to $11,398,762 from 28,496,907 units at $0.40 per unit, each unit comprising one common share and one-half warrant exercisable at $0.55 for two years. Insiders subscribed for 375,000 units for $150,000. Proceeds will fund exploration in Saudi Arabia and Ethiopia, offering costs and working capital; TSXV final acceptance is pending.
Sun Summit Receives Positive Metallurgical Test Results for the JD Project
Metallurgical testing on Creek Zone and Finn Zone composites from the JD Project in B.C.'s Toodoggone district returned gold extraction of 98-99% for Creek Zone and 89-95% for Finn Zone using a gravity-leach flowsheet at 150µm, with 93-96% and 90-94% respectively at 250µm. A gravity-flotation-leach flowsheet at 150µm gave overall gold recovery of 95-97% for Creek Zone and about 100% for Finn Zone. The company anticipates an inaugural Mineral Resource Estimate in Q1 2027.
Thunder Gold Intersects Continuous Gold Mineralization Averaging 1.178 g/t Au Over 102.0 Metres at Tower Mountain, Ontario
Drill hole TM26-221 at the Bench Target on the Tower Mountain Property, 40 km west of Thunder Bay, Ontario, returned 1.178 g/t Au over 102.0 metres and ended in mineralization averaging 0.785 g/t Au over 12.0 metres outside the current optimized pit limit; TM26-220, 200 metres above, returned 0.551 g/t Au over 75.0 metres. Ten infill holes to date averaged roughly 10% above 2026 MRE model-predicted grades, and planned drilling is being increased. A 285 line-kilometre MobileMT airborne survey is to be completed by October 31, 2026, with initial results by November 15.
Velocity Provides Update on Sale of Bulgarian Assets
Türker Global Madencilik has delivered written notice, dated October 15, 2026, electing to proceed to closing of its acquisition of Velocity's Tintyava Exploration Assets, including the Rozino gold project in Bulgaria, with closing anticipated on or about December 14, 2026, subject to conditions precedent and funding requirements. The total purchase price is US$55.0 million, of which US$16.5 million has been received, with the remaining US$38.5 million to be placed in escrow before closing. The separate option over the Non-Tintyava Exploration Assets, for an additional US$4.0 million, remains unexercised.
Friday, Oct 16, 20267 releases
Dryden Gold and Eagle Lake First Nation Sign Early Exploration Agreement
An Early Exploration Agreement with Eagle Lake First Nation, signed August 18, 2026, sets a framework for engagement, environmental stewardship and employment, training and contracting opportunities tied to Dryden Gold's exploration in the Nation's traditional territory in Northwestern Ontario. Under the agreement, Dryden Gold will reimburse Eagle Lake First Nation $25,000 for its environmental review, to be settled through the issuance of 113,636 common shares at a deemed price of $0.22 per share, subject to TSX Venture Exchange approval and a four-month-plus-one-day hold period.
Grizzly Closes Private Placement and Completes Midway-Beaverdell Option
A private placement first announced September 15, 2026 has closed, with 1,000,000 Units at $0.05, 325,000 FT Units at $0.055 and 4,866,668 CMFT Units at $0.06 issued for gross proceeds of $359,875; cash finders fees of $21,692 and 328,416 Finder Warrants were paid, leaving 240,313,037 shares outstanding and a four-month hold expiring February 17, 2027. The Company also paid $5,000 and issued 100,000 shares on October 13, 2026 to complete the Midway-Beaverdell Option, giving it 100% of 761.25 hectares in British Columbia's Greenwood Mining District, subject to a 1% NSR.
Koryx Copper Update | RCTV at Precious Metals Beaver Creek 2026
North Peak Re-Engages ICP Securities for Automated Market Making Services
ICP Securities Inc. has been re-engaged effective October 15, 2026 to provide automated market making services for North Peak Resources Ltd. (TSX Venture: NPR), including use of its proprietary algorithm, ICP Premium®. The services are to be provided in compliance with the policies and guidelines of the TSX Venture Exchange and other applicable securities legislation.
Quartz Closes $1.7 Million Unit Financing
A private placement of 4,247,500 units closed for gross proceeds of $1.7 million, leaving Quartz Mountain Resources with a working capital position of $4 million. Robert Dickinson, Chairman, and his associates took 1,500,000 FT Units, and insider The Sutton Group Inc. took 1,500,000 Units. FT Unit proceeds will fund exploration of the company's British Columbia gold-silver-copper projects, with non-FT proceeds going to exploration and general working capital. Securities are subject to a four month and one day hold period, with final TSX Venture Exchange approval pending.
Quimbaya Gold Defines a Copper-Molybdenum Porphyry System at Tahami Center
All six holes of the first phase at Tahami Center, Segovia, Antioquia, Colombia, totaling 2,928 meters, intersected a copper-molybdenum porphyry system with geochemically anomalous but sub-economic grades, averaging 0.021% Cu and 31 ppm Mo below the oxide zone. TCDH-006 returned 526.95 meters at 0.041% Cu and 34.1 ppm Mo from 131.90 meters, including 98.70 meters at 0.062% Cu. Drilling at Tahami Center will pause for modelling while drilling continues at Tahami South, with stream sediment sampling and drone magnetic surveys starting Q1 2027.
Trident Provides Updated Information Regarding Its Marketing Engagement with Freedom Financial Research, LLC
At the TSX Venture Exchange's request, Trident Resources restated and supplemented disclosure from its September 21, 2026 release concerning its engagement of Freedom Financial Research, LLC of Charlottesville, Virginia for investor awareness services. Under the agreement dated September 11, 2026, as amended October 1, 2026, FFR will distribute eight dedicated emails across four subscriber audiences for a fixed fee of US$150,000, paid from working capital, with no securities issued. The 30-day term began September 21, 2026, subject to TSXV acceptance.
Thursday, Oct 15, 202612 releases
Deep Drilling Intersects Epithermal Mineralisation 1km Below Proprietary Pit at Peak Hill
Diamond drill hole PHD084 at the Peak Hill Gold Project in New South Wales was completed to 1,651m, returning 0.42 g/t Au over 6.4m from 1,000.6m, including 1.02 g/t Au over 2m, and 0.11 g/t Au and 0.02% Cu over 153m, including 0.46 g/t Au and 0.06% Cu over 4.8m. The hole intersected advanced argillic alteration about 1km below the Proprietary open cut but did not resolve the targeted porphyry. Drilling of 6,600m is planned to start in November, supported by a $165,000 NSW Critical Minerals exploration grant.
BULGOLD Inc. Defines The 2.2KM-Long BL Vein Corridor At The Lutila Gold Project
Mapping, prospecting and historical data synthesis has traced the subvertical BL Vein over a near-continuous 2.2-km north-south strike length on the eastern flank of the North East Block at the Lutila Gold Project, Slovak Republic, 1.1 km to 1.7 km from drill hole KPDD005. Historical 2004 diamond drilling returned 26.2m @ 0.91g/t Au from 97m (KG-BL-1) and 24.3m @ 0.76g/t Au from 51.7m (KG-BL-2). A combined 62 rock samples averaged 0.56g/t Au, 4.9g/t Ag, 364ppm As and 512ppm Sb.
Blue Lagoon Records Its First Finalized Gold and Silver Production From Dome Mountain
%PDF-1.3 %��������� 3 0 obj << /Filter /FlateDecode /Length 7159 >> stream x�]���6r��%Y㑭���v�Z���.ʝ��W*���|��������cfg�-��…
Clean Air Metals and Fiore-backed Springbok Ventures Announce Conditional Acceptance of Proposed Transaction
The TSX Venture Exchange conditionally accepted, by letter dated October 9, 2026, Clean Air Metals' proposed acquisition of Fiore-backed Springbok Ventures under Policy 5.3, with Springbok shareholders receiving 0.9 of a post-consolidation Clean Air Metals share per Springbok share, alongside a continuance to British Columbia, a 10-for-one consolidation and a name change to Dante Metals Corp. A first amendment reclassifies the deal from a Policy 5.2 reverse takeover and reflects the September 22, 2026 C$6,174,999.95 subscription receipt financing and an October 9, 2026 placement of 2,500,000 flow-through shares at C$0.06 for C$150,000. Both shareholder meetings are set for November 13, 2026.
Celts Age Date Points to Arthur-Style Gold System; Company Expands Claims Ahead of Drilling
An alunite sample from the Celts project in Nevada returned an age of 11.73 ± 0.12 million years, matching the age of gold mineralization at AngloGold Ashanti's Silicon deposit, part of the Arthur Project about 100 km away on the same structural trend. New rock sampling returned gold values up to 1.5 g/t outside the historic dumps, and claims were more than doubled to 1,020 hectares. Five holes totaling approximately 2,500 metres are planned, with the first two permitted and the remaining three subject to permitting and financing.
Erdene Announces Preliminary Economic Assessment Results for Zuun Mod Molybdenum-Copper Project
A preliminary economic assessment for the wholly-owned Zuun Mod Molybdenum-Copper Project in southwest Mongolia outlines an after-tax NPV8% of US$745 million and a 16.1% IRR at US$25.00/lb molybdenum and US$5.00/lb copper, rising to US$2.0 billion and 27.8% at spot prices of US$33.00/lb and US$6.50/lb. The 34-year, 25 Mtpa open-pit plan would recover 672 million lb molybdenum and 947 million lb copper, with upfront capital of US$687 million and AISC of US$13.89/lb Mo. Drilling begins in late October.
Freegold drills 1.24 g/t Au over 213m including 21m of 5.77 g/t Au at Golden Summit
Results from eight drill holes at the Golden Summit project in Alaska include GS2656, which returned 213.0 m at 1.24 g/t Au from 422 m, including 21 m at 5.77 g/t Au from 467 m and 3.0 m at 32.7 g/t Au, and GS2648, which returned 30.5 m at 1.67 g/t Au from 63.1 m and 79.3 m at 1.11 g/t Au from 377 m. More than 58,000 m has been drilled in 2026, with eight geotechnical holes complete and a resource update and pre-feasibility study targeted for 2027.
Gold Terra to Host Community Town Hall Meeting in Yellowknife on October 21, 2026
A Town Hall Meeting will be held on October 21, 2026 at 7pm at the Yellowknife Ski Club Chalet in Yellowknife, Northwest Territories, where Chairman and CEO Gerald Panneton will update attendees on drilling and plans for the historic Con Mine. Topics include Zone 103 North drilling, sonic drilling at the historical Con Mine tailings storage facility, and near-surface drilling and metallurgical test work at Yellorex. Gold Terra anticipates an updated Mineral Resource Estimate by year-end 2026 and a PEA by Q1 2027.
Goldgroup Completes Strategic Investment in Luca Mining
A C$101,123,662 strategic investment in Luca Mining Corp. has been completed, with Goldgroup acquiring 101,123,662 subscription receipts at C$1.00 each in a bought deal private placement that closed October 14, 2026, tied to Luca's proposed acquisition of the Cozamin Mine. On completion of the Cozamin Acquisition and conversion, Goldgroup would hold approximately 19.9% of Luca's shares on a non-diluted basis. An investor rights agreement gives Goldgroup participation rights and two board nominees while it holds at least 10%.
Honey Badger Silver Samples up To 279 G/t Silver, 5.82% Copper, & 0.83 G/t Gold and Identifies Multiple New Mineralized Occurrences at Its YAVA Project, NUNAVUT
Grab samples from the first exploration program at the 100%-owned Yava polymetallic VMS project in Nunavut returned up to 279 g/t silver, 5.82% copper, 0.83 g/t gold, 0.60% zinc and 0.32% lead at the historic Main Zone. The five-day August 2026 prospecting program collected 146 rock samples and identified new mineralized occurrences at the R-12, M-9, M-10 and South Zone electromagnetic targets across the 5,218-hectare property. Results are being integrated with historic data to plan follow-up work, including potential drilling.
McFarlane Lake Mining Appoints Gilbert Lamarche, P.Eng., as Chief Operating Officer
Gilbert Lamarche, P.Eng., has been appointed Chief Operating Officer of McFarlane Lake Mining, effective October 15, 2026, and will receive stock options and restricted share units under the company's executive compensation package. Lamarche was most recently COO of Foran Mining Corporation and previously spent more than 15 years with Vale. He joins as McFarlane advances its Juby Gold Project near Gowganda, Ontario, where work includes scoping, metallurgical and environmental baseline studies and pursuit of an Advanced Exploration Permit.
Midland Identifies New Gold-Bearing Boulders During the First Phase of Its 2026 Exploration Program on the Caniapisc Au Project
The first phase of the 2026 summer exploration program on the wholly owned Caniapisc Au project in the Eeyou Istchee James Bay and Caniapiscau regions of Quebec identified new gold-bearing boulders, with a maximum of 15.8 g/t Au from a selected boulder grab sample in a new area about 2.5 kilometres northeast of the 2025 boulders. Nine selected boulder grab samples exceeded 0.5 g/t Au, including five above 1.0 g/t Au; 152 rock and 532 soil samples were collected, with soil results pending.