← All weekly reports

Junior Mining Intelligence · Friday snapshot

GoldVenture Weekly

Week ending August 14, 2026 · 397 companies tracked, 351 priced

Breadth
55% up
193 up · 105 down · 53 flat · last week 77.1% up
Median move
+1.5%
last week +10.7%
Financed
$226.6M
7 deals · last week $4.0M · 4-wk avg $35.9M
Drill releases
32
4-wk avg 41/wk · 57 material of 129
Gold
$4,374.8
+0.77% wk · silver +1.77%
Reports due
2
within 14 days · 67 in pipeline · 0 filed this week

Lithium was the standout commodity mover for the week ending 2026-08-14, surging 6.21% to $22,503.79/T despite a flat 4-week trend, while palladium was the lone significant decliner at -4.35% to $1,298.00/oz. Junior gold equities dominated activity, accounting for three of the five top developments by absolute return and three of five financings totaling $25,999,999.55 of the week's $36,471,999.55 raised. Drill results were the most consequential catalyst class, driving outsized moves in RFR (+25.0%) and LEGY (+21.05%).

What changed: breadth 55% up vs 77.1% last week; median +1.5% vs +10.7%; 7 deals for $226.6M vs 2 for $4.0M; 57 material releases vs 56.

Top developments

Composite of move, volume, catalyst weight and size · z-score against the commodity cohort
1
Snowline GoldSGD· Gold · mkt cap $2.12B
+7.2%
Financingz +0.18 vs Gold

SGD gained 7.16% after completing a C$172.6 million bought deal public offering of common shares, including full exercise of the over-allotment option, as announced on 2026-08-12. Release ↗

2
RenforthRFR· Gold · mkt cap $8.3M
+25.0%
Drill Resultsz +1.46 vs Gold

RFR surged 25.0% following a 2026-08-13 release updating the Parbec gold deposit drill program and announcing a new financing. Release ↗

3
Prospector Metals Corp.PPP· Gold · mkt cap $154.9M
-35.2%
No material releasez -2.85 vs Gold

PPP fell -35.16% with no material release in window — move appears technical.

4
Generation Mining LimitedGENM· Gold · mkt cap $164.5M
+17.9%
Study Resultsz +0.95 vs Gold

GENM advanced 17.91% after reporting on 2026-08-12 that the first 30% of Marathon project capital cost bids came in at or below feasibility study estimates. Release ↗

5
Legacy Gold MinesLEGY· Other · mkt cap $43.4M
+21.1%
Drill Resultsz +1.22 vs Other

LEGY rose 21.05% on 2026-08-11 drill results at Baner, Idaho, intersecting 1.14 g/t gold over 13.5m from surface and 2.4 g/t over 8.2m, with the Main Zone extended 170m west. Release ↗

Sector cohorts new

351 companies grouped by flagship-project commodity · cohorts of 5 or more
CohortnMedian moveMedian% upMetal wkBest · worst
Gold
last wk +11.3%
215
+1.5%55.3%+0.77%GLB +57.1% · PPP -35.2%
Copper
last wk +10.6%
41
0.0%48.8%+0.30%RUSH +50.0% · REDC -15.2%
Silver
last wk +19.7%
24
+0.1%50%+1.77%PRNC +12.7% · SVE -9.7%
Lithium
last wk +2.6%
12
+4.4%75%+6.21%LIBR +30.0% · LIFT -4.4%
Nickel
last wk +1.3%
7
0.0%42.9%no quoteNNX +25.0% · NICN -19.1%
Uranium
last wk +5.0%
6
+2.6%66.7%+1.10%LAM +8.9% · CVV 0.0%

By exchange: CSE 60.9% up, median +3.6% (n=46) · TSX 68.9% up, median +2.3% (n=45) · TSXV 51.7% up, median +1.1% (n=259)

Metals

Week-over-week · 4-week trend
Gold $4,374.8/oz
+0.77%
+8.9% 4w
Silver $64.55/oz
+1.77%
+15.7% 4w
Platinum $1,745/oz
+0.17%
+9.8% 4w
Palladium $1,298/oz
-4.35%
+5.5% 4w
Copper $6.61/lb
+0.30%
+5.4% 4w
Lithium carbonate $22,503.79/T
+6.21%
+0.2% 4w
Cobalt hydroxide $48,704.47/MT
-1.72%
-10.1% 4w
Uranium $87.45/lb
+1.10%
+2.3% 4w
Gold : silver 67.8 (last week 68.4)

Capital markets

7 financings announced · $226.6M · average $32.4M · 0 of 7 carry warrants

By type

Bought Deal
$172.6M · 1
Private Placement
$52.5M · 5
Warrant Exercise
$1.5M · 1

By commodity, share of dollars new

Gold
87% · 67%
Other
1% · 8%
Lithium
10% · 0%
Uranium
2% · 0%
PGM
0% · 0%
Copper
0% · 25%

Solid: this week. Grey: prior four weeks.

Deal terms new

Price against the stock's current price and shares issued against shares outstanding, from the financing record.

Median price vs market
-10.7%
6 of 7 priced below market
Median dilution
+6.8%
shares issued ÷ outstanding
Warrant coverage
0/7
deals with a warrant tranche
Largest
$172.6M
SGD · 76% of the week
CompanyTypeAmount ▾Pricevs marketDilutionWarrantsClosesStatus
Snowline Gold
SGD Gold
Bought Deal$172.6M$14.50
mkt $17.66
-17.9%6.8%noneAug 12closed
Li-FT Power
LIFT Lithium
Private Placement$23.0M$2.90
mkt $2.85
+1.8%9.2%noneAug 12closed
Element 29 Resources
ECU Gold
Private Placement$12.0M$1.65
mkt $1.76
-6.2%3.9%noneAug 10closed
Blue Lagoon Resources Inc.
BLLG Gold
Private Placement$10.0M$0.60
mkt $0.71
-15.5%11.1%noneAug 10closed
Laramide Resources Ltd.
LAM Uranium
Private Placement$5.0M$0.60
mkt $0.61
-1.6%2.9%noneAug 11closed
Resouro Strategic Metals
RSM Other
Private Placement$2.5M$0.25
mkt $0.28
-10.7%9.3%noneAug 12closed
Grande Portage Resources Ltd.
GPG Gold
Warrant Exercise$1.5M$0.25
mkt $0.39
-35.9%3.2%noneAug 13closed

Insider activity new

C$1.86M bought and C$589K sold on the open market by 17 insiders at 12 companies · 355 companies covered

Net buyers

Directors, officers and 10% holders paying market price with their own cash (SEDI filings). Grants, exercises and plan purchases are excluded. Canadian dollars.

Awalé ResourcesARIC1 buy · 2 insiders+C$1.44M
Rocky Shore GoldRSG6 buys · 2 insiders+C$215K
Apollo SilverAPGO1 buy · 1 insider+C$23K

5 more net buyers this week on the insider board.

Cluster buying: Red Metal Resources Ltd. (2 insiders, C$46K); Green Bridge Metals (2 insiders, C$10K).

Net sellers

Open-market sales; option exercises followed by a sale count only for the sale.

1911 Gold CorporationAUMB2 sells · 1 insider−C$315K
New Pacific Metals Corp.nuag1 sell · 1 insider−C$92K
Amerigo Resources Ltd.ARG3 sells · 2 insiders−C$29K

Source: SEDI filings as published by TMX Money. Full board at /insiders.

Financial filings new

0 current-period filings from 0 companies · 103 companies tracked for filings

Filed this week

Statements and MD&A first seen in the window. Cash and working capital are read from the balance sheet of processed statements; a material-uncertainty flag means the auditor or the notes cast doubt on going concern.

No current-period filings this week.

Filings due

NI 51-102 deadlines within 30 days: 120 days after year-end for annual statements, 60 after quarter-end for interims.

Aug 24
Northern Dynasty Minerals Ltd.NDM · interim to Jun 30 10 days left
Sep 8
55 North Mining Inc.FFF · interim to Jun 30 25 days left
Sep 8
Dynasty Gold Corp.DYG · interim to Jun 30 25 days left
Sep 8
Prismo MetalsPRIZ · interim to Jun 30 25 days left
Sep 8
Harvest Gold CorporationHVG · interim to Jun 30 25 days left
Sep 8
Pacifica Silver Corp.PSIL · interim to Jun 30 25 days left
Sep 8
Aldebaran Resources Inc.ALDE · interim to Jun 30 25 days left
Sep 8
A2 Gold Corp.AUAU · interim to Jun 30 25 days left
Sep 8
Aston Bay Holdings Inc.BAY · interim to Jun 30 25 days left
Sep 8
Altiplano Minerals Ltd.APN · interim to Jun 30 25 days left
Sep 8
GR Silver MiningGRSL.V · interim to Jun 30 25 days left
Sep 8
Cassiar GoldGLDC · interim to Jun 30 25 days left
Sep 8
Axo Copper Corp.AXO · interim to Jun 30 25 days left

Drill and discovery board new

32 drill releases this week against a four-week average of 41

Drill results

+25.0%

Two drill holes undercutting surface channel intersections within the open pit footprint at the Parbec gold deposit in Québec have been completed, with samples to be assayed and results released later; a planned third hole targeting a data void was deferred after the two holes consumed the budgeted meterage. Renforth also intends to complete a non-brokered private placement of up to $1,000,000, with flow-through shares at $0.03 and units at $0.025, each unit including a half warrant exercisable at $0.05 for 18 months.

Aug 13Gold
0.0%

A ground-based deep induced polarization and magnetotellurics survey covering four lines totalling 18.4 line-km at the Caballos Copper Project, Valparaiso Region, Chile, identified chargeability and resistivity anomalies labelled C1, C2-A, C2-B, C3 and C4, including a 3 km-wide C2-B anomaly and a shallow C4 anomaly about 1 km wide and 1 km deep. Five diamond drill holes totalling 5,514 metres are planned to test C2-B, C3, C4 and Chincolco Creek, with drilling anticipated to start in September 2026.

Aug 13Copper
+10.3%

Maiden diamond drilling at the Stavaträsk gold project in Sweden's Skellefteå district returned gold in all five holes reported, including 9.2 m at 1.3 g/t Au from 29.9 m in ST2604, 1.1 m at 15.6 g/t Au from 35.6 m in ST2605 (including 0.6 m at 27.8 g/t Au), and 0.5 m at 8.9 g/t Au, 47.5 g/t Ag and 0.74% Cu in ST2601. The program totalled seven holes for 1,040 m over 650 m of strike; assays for ST2606 and ST2607 are pending, with an IP gradient array survey to begin in coming weeks.

Aug 13Silver
+13.0%

As of August 9, 1,605 metres of a planned 3,255 metres (49%) and 5 of 12 drillholes were completed at the New Amalga Gold Project in southeast Alaska, with hydrogeological, geotechnical and resource definition data collected for permitting and mine planning. A river-monitoring gauge was installed and foundation work advanced on the first of two meteorological towers. All 6,005,431 warrants were exercised at $0.25 before the August 12, 2026 expiry, raising $1.50 million. The Company granted 275,000 options at $0.35, expiring August 12, 2031.

Aug 13Gold
+12.5%

Kinross Gold Corp. has begun a drilling program at the Williams Brook project. A separate item notes trenching at the McKenzie Gold Project to define drill targets, dated September 2, 2026.

Aug 12Gold
+1.9%

Drilling at the Lucky Strike Zone of the Gabbs gold-copper project in Nevada returned 0.78 g/t gold and 0.29% copper over 79.25 meters, including 21.34 meters at 1.28 g/t gold and 0.34% copper, in hole GBR-118, while GBR-119 cut 0.37 g/t gold and 0.16% copper over 158.50 meters, the thickest interval drilled at Gabbs to date. Results cover ten RC holes (GBR-112 to GBR-121) and four diamond holes (GBD-040 to GBD-043). An updated resource estimate will underpin a feasibility study expected in the fourth quarter of 2026.

Aug 12Gold
-2.8%

A fully funded and permitted 5,000-metre oriented diamond drill program has begun at the Burr target zone of the 100%-owned Lewiston Project in west-central Wyoming, testing up to 500 m beyond the 2024 drill footprint, with select holes targeted to about 400 m vertical depth, roughly 225 m deeper than 2024 drilling, plus adjacent parallel shears. An expanded Federal and State drill permit covering an additional 2.5 km of the Burr and Sweetwater trends has been submitted.

Aug 12Gold2.01× volume
-20.3%

RC drilling by Mammoth Minerals at the Lunchbox Ridge Prospect on the Excelsior Springs Project in Nevada returned 22.9 m @ 1.37 g/t Au from 10.7 m, including 3.0 m @ 4.15 g/t Au (MEXRC2635), and 12.2 m @ 1.57 g/t Au from 32 m, including 4.6 m @ 3.31 g/t Au, plus 10.7 m @ 1.09 g/t Au from 164.6 m (MEXRC2634), extending the Buster system about 700 m along strike. Five holes for 1,100 m have been completed at the Blue Dick Silver Prospect, with results expected within three weeks and 24 further holes planned. Mammoth can earn 80% of the project over five years, with Athena free-carried to Definitive Feasibility Study.

Aug 12Gold
+22.7%

A private investment in public equity financing of up to 13,846,910 units at C$0.55 per unit for gross proceeds of up to C$7,615,800 (about US$5,462,000) is expected to close on or about August 14, 2026, each unit comprising one common share and one warrant exercisable at C$0.75 for three years. Crescat Capital LLC, holding about 13.8% of shares, will participate. Proceeds will expand the 2026 drill program at the Illinois Creek Project in western Alaska from 6,000 to approximately 9,000 metres, targeting Waterpump Creek and Silver Sage, plus metallurgical, technical and baseline environmental work.

Aug 11Other
-9.1%

Final hole of a three-hole, 1,233 metre drill program at the Thomas Ogden Zone on the Ogden Gold Project near Timmins, Ontario, returned 7.25 g/t gold over 7.45 m (347.27–354.72 m), including 13.46 g/t Au over 2.54 m with visible gold. A second intercept in the footwall intermediate dike returned 1.15 g/t Au over 4.65 m (374.52–379.17 m). Ogden is a 50/50 joint venture with Discovery Mining Ltd., with Metals Creek as operator.

Aug 11Other
+21.1%

Drill hole LG26-004, the third core hole reported from Phase 1 of the 2026 program at the Baner Gold Mine Property in Idaho County, Idaho, returned 1.14 g/t gold over 44.3ft (13.5m) from surface and 2.4 g/t over 26.9ft (8.2m), including 6.6 g/t over 7.5ft (2.3m). The result extends the Main Zone 558ft (170m) to the west.

Aug 11Other
-18.5%

Drilling of more than 4,500 m in seven holes has been completed or is ongoing at the Hank-Mary District on the HWY 37 Project in British Columbia's Golden Triangle, with three diamond drills active on the Hank Porphyry target. Four holes are finished, including HW-26-012 (884 m), HW-26-013 (406 m) and HW-26-014 (652 m) at the Cash Porphyry target; a re-entry of HW-26-011 was abandoned at 983.5 m. Descriptions are visual only; no 2026 assays have been received. Also completed: 2,452 soil samples, with IP surveys ongoing and airborne MMT surveys due to start.

Aug 11Gold
-17.6%

A 21.3 line-kilometre CSAMT and natural source AMT geophysical survey has been completed at the Mizobe Project in Kyushu, Japan, providing subsurface resistivity imaging across the project. Results were integrated with gravity and magnetic inversion models, structural interpretations and 2023 and 2025 drilling results to produce a refined geological model, which will be used to refine targets and finalize a multi-target drill program. Mizobe lies about 23 kilometres south of the Hishikari Mine; prior drilling returned 10.0 metres at 4.27 g/t gold from 122.75 metres in MZDD23-003.

Aug 11Gold
-4.3%

Drill hole GD-26-424 at the Golden Gate Zone on the Golddigger property in B.C.'s Golden Triangle returned 10.32 g/t Au over 6.00 meters, including 15.61 g/t Au over 3.96 meters and 33.80 g/t Au over 1.82 meters. Hole GD-26-412 cut 4.41 g/t AuEq (3.33 g/t Au, 61.14 g/t Ag) over 7.79 meters in the Surebet Zone and 4.17 g/t AuEq over 3.75 meters at Golden Gate. The zone has been expanded by 860 meters and 45 of 98 planned holes, totalling 25,651 meters, are complete.

Aug 11Other
-7.0%

Hole CDH010 at the Cobrasco porphyry copper-molybdenum discovery in Chocó, Colombia returned 504m at 0.48% Cu and 37ppm Mo from 36m, including 264m at 0.63% Cu and 35ppm Mo from 36m, plus 36m at 0.62% Cu from 486m and 84m at 0.40% Cu, 91ppm Mo from 660m; the hole ended at 844.65m. Ten drillholes totalling approximately 11,000m have defined a mineralized footprint of roughly 1,200m by 550-700m. CDH011 results are pending.

Aug 11Copper
+24.0%

Drill hole TM26-210 at the Bench Target on the Tower Mountain Property, 40 km west of Thunder Bay, Ontario, returned 661.5 metres averaging 0.554 g/t Au, including 24.0 metres averaging 1.815 g/t Au. About 516.0 metres of the interval, averaging 0.503 g/t Au, lies inside the 2026 Mineral Resource Estimate pit shell, with 145.5 metres averaging 0.731 g/t Au immediately below it. The hole ended in mineralization.

Aug 11Gold
+15.9%

Drill holes SL26-37 and SL26-39 at the Springer rare earth and gallium deposit near Sturgeon Falls, Ontario returned mineralization over their entire assayed lengths: SL26-37 averaged 0.41% TREO and 35.0 g/t Ga₂O₃ over 414 m, including 0.65 m at 5.00% TREO and 74.1 g/t Ga₂O₃, extending the system about 275 m below the conceptual open pit; SL26-39 averaged 0.42% TREO and 38.4 g/t Ga₂O₃ over 417.5 m. Assays are pending for 6 of 13 holes, with updated rare earth and initial gallium resource estimates targeted for late 2026. Volta also signed a September 2, 2026 advisory agreement with L5 Capital Inc., issuing 10,000,000 warrants in four tranches at a deemed exercise price of $0.31.

Aug 10Rare earths2.09× volume
+1.7%

Four step-out holes from the Phase Two program at the Manhattan District Project in Nevada returned results including hole 26MN-109 with 3.38 g/t gold over 33.31 m from 138.90 m (including 6.90 g/t over 12.89 m), 2.83 g/t over 11.89 m from 97.08 m and 9.46 g/t over 8.72 m from 126.00 m at Goldwedge, and hole 26MN-114 with 15.28 g/t gold over 2.56 m from 94.27 m and 0.98 g/t over 23.2 m from 112.13 m on the Zanzibar Trend. Assays are pending from six holes totalling 2,236 m.

Aug 10Other
0.0%

Six additional drill holes from the 2026 program at the Carmacks copper-gold project in central Yukon returned 52.84 m of 1.04% copper and 0.37 g/t gold (1.45% CuEq), including 11.68 m of 2.59% copper and 0.98 g/t gold, in hole CD-26-050 at Zone 2000S, and 93.22 m of 0.79% copper and 0.23 g/t gold in hole CD-26-047 at Zone 147. Step-out drilling encountered sulphide mineralization 250 m north of the existing Mineral Resource at Zone 2000S. A total of 20 holes over 10,651 m of a planned 15,000 m are complete, with assays pending.

Aug 10Gold
—

Drill results from nine holes in the southern S1 and S2 Sectors of the M2 Trend at the 100%-owned Pontio Gold Project in western-central Finland include PONT093 with 110.00m at 1.18 g/t Au from 99.08m, including 5.19m at 14.01 g/t Au from 137.90m, and 48.89m at 0.68 g/t Au from 24.70m in PONT087. The holes form part of a 5,009m, 28-hole Phase 1 programme; a second programme starts later in August, with a maiden resource estimate anticipated in early 2027.

Aug 10Gold
+14.8%

Final assays from first-half 2026 drilling at the Jonpol Deposit on the Garrison Property of the Tower Gold Project in Ontario's Timmins Mining Camp returned 12.46 g/t Au over 16.17 m and 18.62 g/t Au over 5.30 m. Intercepts used a 0.30 g/t Au cut-off, up to 5 m internal dilution and a 25 g/t Au cap. About 15,000 m of drilling is planned for the rest of 2026 at the Jonpol, 903 and Garrcon deposits, aimed at converting inferred resources and expanding higher-grade mineralization for an updated Tower MRE.

Aug 10Gold
+1.5%

Drill hole DDRCCC-26-132 at the Blackjack deposit on the RC Gold Project in Yukon returned 218.6 m of 1.25 g/t gold, including 44.4 m of 3.86 g/t gold, plus a separate interval of 92.7 m of 1.14 g/t gold, while hole DDRCCC-26-129, a step-out of up to 150 m east of the current resource, returned 118.0 m of 0.50 g/t, 32.0 m of 1.44 g/t and 55.0 m of 0.48 g/t gold. Approximately 32,000 m of the planned 60,000 m program has been drilled in 63 holes this year, with six rigs turning and a seventh mobilizing. Separately, all 7,255,946 warrants and 737,248 finder's warrants from the August 2, 2024 private placement were exercised for $3,037,414.

Aug 10Gold
-4.3%

Drilling at the 100%-owned Golddigger Property in B.C.'s Golden Triangle extended the Golden Gate Zone 320 meters to the northeast, where hole GD-26-420 assayed 6.51 g/t AuEq (6.16 g/t Au, 7.27 g/t Ag) over 5.73 m, including 36.27 g/t AuEq over 0.97 m. Hole GD-26-414 returned 9.87 g/t Au over 5.00 m, including 65.65 g/t Au over 0.75 m, plus 2.81 g/t Au over 4.00 m in the Surebet Zone. 44 of 98 planned holes, totalling 23,863 meters, are complete in 2026.

Aug 10Other
+9.2%

Drill hole SC-26-13 at the MEPS Zone of the Soo Copper Project near Batchewana Bay, Ontario returned 445.0m grading 0.40% CuEq from 22m depth, including 203.10m at 0.51% CuEq, 9.50m at 2.34% CuEq from 74m and 16.25m at 2.31% CuEq from 176m, plus 7.4m at 1.49% CuEq from 459m. The hole, collared 140m east of SC-26-10, extends higher-grade mineralization about 100m farther east. 38 holes totalling 17,250m have been completed of the minimum 20,000m program.

Aug 10Copper
—

Drill results from nine holes in the southern S1 and S2 Sectors of the M2 Trend at the 100%-owned Pontio Gold Project in western-central Finland include PONT093 with 110.00m at 1.18 g/t Au from 99.08m, including 5.19m at 14.01 g/t Au from 137.90m, plus PONT087 with 48.89m at 0.68 g/t Au from 24.70m and PONT091 with 14.73m at 0.86 g/t Au from 86.43m. The holes form part of a 5,009m, 28-hole Phase 1 program; a maiden resource estimate is anticipated in early 2027, with an H2 program starting later in August.

Aug 10Gold

Resource updates and study results

+7.2%

An independent NI 43-101 preliminary economic assessment technical report for the Carangas project in Oruro Department, Bolivia has been filed, titled "Carangas Project: NI 43-101 Technical Report and Preliminary Economic Assessment, Oruro, Bolivia." The report was prepared by Ausenco Engineering Canada ULC with an effective date of July 16, 2026, and follows the company's July 17, 2026 news release. There are no material differences between the report and the previously disclosed information.

Aug 14Silver
—

PLR Resources Inc. has been retained to update the 2018 Mineral Resource Estimate for the Roger copper-gold project in Quebec's Chibougamau district, using revised copper, gold and silver price assumptions and a lower cut-off grade, with completion targeted for October 2026. Phase 1 drilling extended porphyry-style mineralization about 700 metres southwest and 400 metres northeast of historical drill limits and more than 100 metres at depth; assays from holes AUR-26-06 to AUR-26-10 are pending. A fully funded $2.0 million Phase 2 definition program at roughly 125-metre spacing is underway, and shareholders approved all matters at the August 6, 2026 meeting.

Aug 12Other
+17.9%

Bid pricing received for major equipment and construction packages representing approximately 30% of estimated capital costs at the 100%-owned Marathon Copper-Palladium Project in Northwestern Ontario is, in aggregate, at or below the corresponding allowances in the 2025 Feasibility Study. Packages include grinding mills, a high voltage substation, thickener, primary crusher, hydrocyclones and a pre-engineered process plant building, with technical-commercial evaluations underway. The company leased a 263-bed construction camp and is procuring roughly 786 peak beds, and agreed a 4MW temporary construction powerline with Hydro One.

Aug 12PGM
+2.8%

An updated underground mineral resource estimate for the Ogama-Rockland Gold Project in southeast Manitoba reports an Inferred Mineral Resource of 3,314,000 tonnes at 6.68 g/t gold containing 712,000 ounces, using a 2.50 g/t Au cut-off and Deswik MSO-designed stopes with an effective date of August 6, 2026. The estimate covers eight main and six subordinate veins traced over 1,500 m strike and drilled to over 600 m depth. Follow-up surface drilling is planned for Q4/2026, and the resource will be included in a global update expected in Q4/2026.

Aug 11Gold2.33× volume
+4.7%

A maiden preliminary economic assessment on the White Gold Project in Yukon outlines a 9.4-year, 12,000 tonne per day open pit operation averaging 188,000 ounces of gold per year (223,000 ounces over the first five years), with after-tax NPV(5%) of C$1,911 million, 38% IRR and 1.7 year payback at US$3,600/oz gold. Initial capital is C$1,050 million, cash costs US$1,290/oz and AISC US$1,480/oz. At US$4,500/oz, after-tax NPV rises to C$2,996 million with a 52% IRR.

Aug 10Gold

Technical reports filed this week

No NI 43-101 or PEA document filed this week. 65 reports are identified and processing; see the week ahead.

Week ahead new

Closings, filings the issuer owes, and warrant tranches reaching expiry

Financings closing

Open rounds with a closing date on or after the week ending.

Aug 31
Angkor Resources CorpANK · Private Placement · $3.5M at $0.25 (-24.2% vs market) · warrants at $0.32
Sep 15
Tier One Silver Inc.TSLV · Private Placement · $9.0M at $0.07 (-12.5% vs market) · warrants at $0.15
Sep 16
Canadian North ResourcesCNRI · Private Placement · $2.0M at $0.25 (+4.2% vs market)
Sep 18
Corcel Exploration Inc.CRCL · Private Placement · $1.5M at $0.10 (+5.3% vs market) · warrants at $0.20
Sep 22
Salazar Resources Ltd.SRL · Private Placement · $3.5M at $0.35 (-13.6% vs market) · warrants at $0.60
Sep 30
Scottie Resources Corp.SCOT · Private Placement · $27.0M at $2.90 (+5.5% vs market)
Sep 30
Garibaldi Resources Corp.GGI · Private Placement · $1.0M at $0.07 (+7.7% vs market) · warrants at $0.10
Oct 7
Sun Peak Metals Corp.PEAK.V · Private Placement · $10.0M at $0.40 (0.0% vs market) · warrants at $0.55
Oct 8
Perseverance Metals Inc.PMI · Private Placement · $8.0M at $0.65 (+44.4% vs market)
Oct 8
Banyan Gold Corp.BYN · Private Placement · $50.0M at $2.00 (+14.3% vs market)
Oct 9
Galway Metals Inc.GWM · Private Placement · $14.0M at $0.72 (+28.6% vs market) · warrants at $0.80
Oct 20
Abasca ResourcesABA.V · Private Placement · $2.3M at $0.25 (+108.3% vs market)

3 open rounds are past their closing date or have none; they are hidden here and need a status update.

Warrant radar new

2 tranches expiring within 90 days of Aug 14, out of 238 outstanding on record. Strike against the current price; proceeds assume full exercise.

CompanyExpiresStrikePriceIn / out of moneyMax proceedsFrom
Canstar ResourcesROXOct 30$0.10$0.065-35.0%$1.9MPrivate Placement of Oct 30 · Warrant radar ↗
Solstice Gold CorporationSGCOct 31$0.10$0.060-40.0%$611KPrivate Placement of Oct 31 · Warrant radar ↗

Corporate

Acquisitions and management changes
+8.9%

A 100% interest in uranium exploration licences in Sweden's Hotagen and Arjeplog-Arvidsjaur districts has been acquired from private vendor Gilpas Resources for aggregate consideration of $600,000: $300,000 cash (including a $50,000 non-refundable deposit paid, with $250,000 due by August 31, 2026) and $300,000 in shares, satisfied by issuing 503,216 shares. Milestone payments of $150,000 and $250,000 are payable on delineating resources of 5 million and 10 million pounds of uranium. The Kläppibäcken Project covers more than 1,700 hectares across two licences; the Kaivaive 103 licence covers Arjeplog. Initial work will digitize historical data and rank drill targets.

Aug 14Uranium
+13.7%

An earn-in agreement with Newmont has been signed covering the Jupiter Project in Nevada, dated 13 August 2026. No terms of the agreement are disclosed in the text provided.

Aug 13Gold
+50.0%

A Sixth Amendment to the Brewer Option Agreement has been executed with the Brewer Gold Receiver, changing the estimated US$27 million purchase price for the Brewer Mine Property in South Carolina from a lump sum at closing to 10 equal annual installments of 10% each, beginning if and when new mining operations are fully permitted by state and federal authorities. Financial assurance at closing can be satisfied through one of five non-cash methods. All other provisions of the agreement remain in effect.

Aug 12Copper

Most researched new

Company pages viewed this week, and whether anything happened
Company
Views
Moved
News
15
+2.8%
yes
55 North Mining Inc.FFF watched, quiet
4
-7.0%
no
Tartisan NickelTN watched, quiet
4
+4.2%
no
3
-7.0%
yes
Azimut Exploration Inc.AZM watched, quiet
3
-1.6%
no
Big Ridge Gold Corp.BRAU watched, quiet
3
-1.9%
no
3
+11.6%
no
Awalé ResourcesARIC watched, quiet
3
+3.4%
no
Urano Energy Corp.ue watched, quiet
3
—
no

Themes

Release mix this week against the prior four-week weekly average
Drill Results
32
-22% vs 4-wk avg 41
Financing
16
-10% vs 4-wk avg 17.8
Resource Update
2
0% vs 4-wk avg 2
Study Results
3
0% vs 4-wk avg 3
Acquisition
4
+25% vs 4-wk avg 3.2
Management
6
+25% vs 4-wk avg 4.8
Corporate
12
-2% vs 4-wk avg 12.2
Other
54
-11% vs 4-wk avg 60.8

Drill-result catalysts drove the two highest sector z-scores among positive movers (RFR at 1.46, LEGY at 1.22), underscoring exploration newsflow as the primary source of junior outperformance this week.